Brick work: Tables moulded good quality of light weighted brick walls (red bricks). All floors external and
internal 4.5 inches wall as per plan
Waterproof Chemical will be mixed for External Plastering. Wardrobes provision in bedrooms, shelves
and loft in kitchen, shelves in hall
Wood work: Main door will be Indian teak wood with 5” X 3” with African teak wood carving Shutters.
Addition of Granite borders and Aluminum windows of three layer which includes two glass partitions
and a Mosquito mesh will be provided to all the Windows
Hardware: Main door hardware will be of heavy quality Steel set accompanied with Europa Lock set.
Plumbing work: Entire plumbing work will be done as per engineers plan showing inward and outward
lines from sump to overhead tank and from overhead tank to all floors by adjusting equal pressure to all
floors.
Tiles: Provision of Tiles will be provided in Bathroom, Pooja Room, Kitchen, Wash Area and Elevation
with Following Height.
PVC Pipes of Aashirwad will be used for supply of water from Bore well/Sump to Overhead tank and
thereafter to the inlets as per Engineer's/Architect plan.
Prince pipes will be used to perform all the Sewer work for the entire Building.
2. Wall mixture.
3. Shower.
4. Alfa set.
5. Taps.
Overhead Tank (2 No's) of Duracon Brand will be used of capacity 1000 liters each.
1. Steps.
2. Balcony.
3. Elevation.
Painting: Internal and External paints will be provided with Asian paints, details as follows:
1. Luppam Finish (Birla White putty) of two coats will be provided on internal and external walls
including Elevation.
3. All Internal walls will be painted with Asian paints Tractor emulsion - 2 Coats.
4. All External walls will be painted with Asian paints APEX coating - 2 Coats.
5. All the Main doors and frames will be provided with Wood Polish
Electric work: Electric points, switches and Boards will be provided as per Engineer's/Arcitecht plan,
material details as Follows:
1. Cable: Finolex
2. Swittches and Sockets: Anchor penta
Steel: Shree/Dhanlakshmi.
Elevation: As per engineers plan and color combination will be used as per engineers
Fabrication Work: Fabrication for Iron will be done with a coat of Red-oxide for the following:
1. Main gate.
2. . Window grills.
Costing:
1. Western Commode.
2. Wall mixture
3. Shower.
4. Alfa set.
5. Taps.
a. Upto Eighteen Thousand (12)) for Each bathroom on Ground and second Floor.
Tiles:
Flooring and walls: Upto 220 Rs per Box.
Flooring: