FOOTING DESIGN
GENERAL DATA
Concrete mix = M 30
VERTICAL LOAD:
Weight of entire foundation
((0.45-0.23)/3)* {(((0.83+(2*0.15))*(0.86+(2*0.15))) +(2.75*2.5)+
SQRT[(((0.83+(2*0.15))*(0.86+(2*0.15)))*(2.75*2.5)]}*25+(2.75*2.5*0.23*25)+(0.86*0.83*2.8*25)
= 110.01 kN
Weight of soil
(2.75*2.5*1.95*18)-110.01
= 131.3 kN
0.86 0.15
2.75m
PLAN SECTION
DESIGN CALCULATION
e) Eccentricity = 39 / 628
= 0.062 < 2.75 / 6
0.458
i.e. = 0.062 < 0.458333
= 38.25 KN/m²
= 28.70 kNm
Overall depth provided 450 mm
Diameter of reinforcement bar = 10 mm
Effective depth provided = 450-75-10/2
= 370 mm
Mu/bd² =
1.5*28.7*1000000/(1000*370^2)
= 0.3145
Ast required =
0.093/100*(1000*450)
= 418.5 mm²
0.370
2.75m
DOC. TITLE
M/s. DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD,
ORAGADAM
DOC. NO SGSE-DOC-LCEX-005 PREPARED CHECKED
REV. NO 0 DATE 21/06/2016 ARUN GSV
Shear stress tv =
1.5*37.63*1000/(1000*370)
= 0.1526 N/mm2
Hence Safe
DOC. TITLE
M/s. DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD,
ORAGADAM
DOC. NO SGSE-DOC-LCEX-005 PREPARED CHECKED
REV. NO 0 DATE 21/06/2016 ARUN GSV
DESIGN OF PEDESTAL:
Maximum moment =
0+12.051*(1.95-0.45+1.3)
= 33.743 kN.m
d'/D = 75 / 860
= 0.087
Pu/fckbD =
1.5*(436.585*1000)/(30*860*830)
= 0.03058175
Mu/fckbD² = 1.5*(33.743*1000*1000)/
(30*0.86*1000*(0.83*1000)^2)
= 0.0028
Hence p = 0 x 30
= 0 %
a) 16/4 = 4 mm
b) 6 mm
a) 16 x 12 = 192 mm
b) = 300 mm
c) Least dimension = 860 mm
Concrete mix = M 30
VERTICAL LOAD:
Weight of entire foundation
((0.45-0.23)/3)* {(((0.83+(2*0.15))*(0.86+(2*0.15))) +(2.75*2.5)+
SQRT[(((0.83+(2*0.15))*(0.86+(2*0.15)))*(2.75*2.5)]}*25+(2.75*2.5*0.23*25)+(0.86*0.83*2.8*25)
= 110.01 kN
DOC. TITLE
M/s. DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD,
ORAGADAM
DOC. NO SGSE-DOC-LCEX-005 PREPARED CHECKED
REV. NO 0 DATE 21/06/2016 ARUN GSV
Weight of soil
(2.75*2.5*1.95*18)-110.01
= 131.3 kN
0.86 0.15
2.75m
PLAN SECTION
DESIGN CALCULATION
= 38.25 KN/m²
Mu/bd² =
1.5*-109.92*1000000/(1000*370^2)
= -1.2044
Ast required =
0.093/100*(1000*450)
= 418.5 mm²
0.370
2.75m
DOC. TITLE
M/s. DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD,
ORAGADAM
DOC. NO SGSE-DOC-LCEX-005 PREPARED CHECKED
REV. NO 0 DATE 21/06/2016 ARUN GSV
Shear stress t v =
1.5*-150.907*1000/(1000*370)
= -0.6118 N/mm2
Hence Safe
DOC. TITLE
M/s. DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD,
ORAGADAM
DOC. NO SGSE-DOC-LCEX-005 PREPARED CHECKED
REV. NO 0 DATE 21/06/2016 ARUN GSV
DESIGN OF PEDESTAL:
Maximum moment =
0+155.65*(1.95-0.45+1.3)
= 435.82 kN.m
d'/D = 75 / 860
= 0.087
Pu/fckbD =
1.5*(-42.108*1000)/(30*860*830)
= -0.0029496
Mu/fckbD² = 1.5*(435.82*1000*1000)/
(30*0.86*1000*(0.83*1000)^2)
= 0.0368
Hence p = 0 x 30
= 0 %
a) 16/4 = 4 mm
b) 6 mm
a) 16 x 12 = 192 mm
b) = 300 mm
c) Least dimension = 860 mm
Concrete mix = M 30
VERTICAL LOAD:
Weight of entire foundation
((0.45-0.23)/3)* {(((0.83+(2*0.15))*(0.86+(2*0.15))) +(2.75*2.5)+
SQRT[(((0.83+(2*0.15))*(0.86+(2*0.15)))*(2.75*2.5)]}*25+(2.75*2.5*0.23*25)+(0.86*0.83*2.8*25)
= 110.01 kN
Weight of soil
(2.75*2.5*1.95*18)-110.01
= 131.3 kn.
0.86 0.15
2.75m
PLAN SECTION
DESIGN CALCULATION
= 38.25 KN/m²
= 31.07 kNm
Mu/bd² =
1.5*31.07*1000000/(1000*370^2)
= 0.3404
Ast required =
0.093/100*(1000*450)
= 418.5 mm²
0.370
2.75m
DOC. TITLE
M/s. DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD,
ORAGADAM
DOC. NO SGSE-DOC-LCEX-005 PREPARED CHECKED
REV. NO 0 DATE 21/06/2016 ARUN GSV
Shear stress tv =
1.5*43.193*1000/(1000*370)
= 0.1751 N/mm2
Hence Safe
DOC. TITLE
M/s. DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD,
ORAGADAM
DOC. NO SGSE-DOC-LCEX-005 PREPARED CHECKED
REV. NO 0 DATE 21/06/2016 ARUN GSV
DESIGN OF PEDESTAL:
Maximum moment =
0+51.737*(1.95-0.45+1.3)
= 144.86 kN.m
d'/D = 75 / 860
= 0.087
Pu/fckbD =
1.5*(234.65*1000)/(30*860*830)
= 0.01643668
Mu/fckbD² = 1.5*(144.864*1000*1000)/
(30*0.86*1000*(0.83*1000)^2)
= 0.0122
Hence p = 0 x 30
= 0 %
a) 16/4 = 4 mm
b) 6 mm
a) 16 x 12 = 192 mm
DOC. TITLE
M/s. DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD,
ORAGADAM
DOC. NO SGSE-DOC-LCEX-005 PREPARED CHECKED
REV. NO 0 DATE 21/06/2016 ARUN GSV
b) = 300 mm
c) Least dimension = 860 mm
Concrete mix = M 30
VERTICAL LOAD:
Weight of entire foundation
((0.45-0.23)/3)* {(((0.83+(2*0.15))*(0.86+(2*0.15))) +(2.2*2)+
SQRT[(((0.83+(2*0.15))*(0.86+(2*0.15)))*(2.2*2)]}*25+(2.2*2*0.23*25)+(0.86*0.83*2.8*25)
= 90.14 kN
Weight of soil
(2.2*2*1.95*18)-90.14
= 64.3 kn.
0.86 0.15
2m 0.83 1.95m
0.45
0.23
2.2m
PLAN SECTION
DESIGN CALCULATION
e) Eccentricity = 48 / 456
= 0.105 < 2.2 / 6
0.367
i.e. = 0.105 < 0.366667
= 38.25 KN/m²
Mu/bd² =
1.5*20.54*1000000/(1000*370^2)
= 0.2251
Ast required =
0.093/100*(1000*450)
= 418.5 mm²
0.370
2.2m
DOC. TITLE
M/s. DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD,
ORAGADAM
DOC. NO SGSE-DOC-LCEX-005 PREPARED CHECKED
REV. NO 0 DATE 21/06/2016 ARUN GSV
Shear stress tv =
1.5*27.784*1000/(1000*370)
= 0.1126 N/mm2
Hence Safe
DOC. TITLE
M/s. DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD,
ORAGADAM
DOC. NO SGSE-DOC-LCEX-005 PREPARED CHECKED
REV. NO 0 DATE 21/06/2016 ARUN GSV
DESIGN OF PEDESTAL:
Maximum moment =
0+14.72*(1.95-0.45+1.3)
= 41.216 kN.m
d'/D = 75 / 860
= 0.087
Pu/fckbD =
1.5*(351.97*1000)/(30*860*830)
= 0.02465467
Mu/fckbD² = 1.5*(41.216*1000*1000)/
(30*0.86*1000*(0.83*1000)^2)
= 0.0035
Hence p = 0 x 30
= 0 %
a) 16/4 = 4 mm
b) 6 mm
a) 16 x 12 = 192 mm
DOC. TITLE
M/s. DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD,
ORAGADAM
DOC. NO SGSE-DOC-LCEX-005 PREPARED CHECKED
REV. NO 0 DATE 21/06/2016 ARUN GSV
b) = 300 mm
c) Least dimension = 860 mm
Concrete mix = M 30
VERTICAL LOAD:
Weight of entire foundation
((0.45-0.23)/3)* {(((0.83+(2*0.15))*(0.86+(2*0.15))) +(2.2*2)+
SQRT[(((0.83+(2*0.15))*(0.86+(2*0.15)))*(2.2*2)]}*25+(2.2*2*0.23*25)+(0.86*0.83*2.8*25)
= 90.14 kN
Weight of soil
(2.2*2*1.95*18)-90.14
= 64.3 kn.
DOC. TITLE
M/s. DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD,
ORAGADAM
DOC. NO SGSE-DOC-LCEX-005 PREPARED CHECKED
REV. NO 0 DATE 21/06/2016 ARUN GSV
0.86 0.15
2m 0.83 1.95m
0.45
0.23
2.2m
PLAN SECTION
DESIGN CALCULATION
e) Eccentricity = 0 / 275
= 0 < 2.2 / 6
0.367
i.e. = 0 < 0.366667
= 38.25 KN/m²
= 5.44 kNm
Mu/bd² =
1.5*5.44*1000000/(1000*370^2)
= 0.0596
Ast required =
0.093/100*(1000*450)
= 418.5 mm²
0.370
2.2m
DOC. TITLE
M/s. DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD,
ORAGADAM
DOC. NO SGSE-DOC-LCEX-005 PREPARED CHECKED
REV. NO 0 DATE 21/06/2016 ARUN GSV
Shear stress t v =
1.5*7.275*1000/(1000*370)
= 0.0295 N/mm2
Hence Safe
DESIGN OF PEDESTAL:
d'/D = 75 / 860
= 0.087
Pu/fckbD =
1.5*(170.053*1000)/(30*860*830)
= 0.01191181
Mu/fckbD² = 1.5*(0*1000*1000)/
(30*0.86*1000*(0.83*1000)^2)
= 0
Hence p = 0 x 30
= 0 %
a) 16/4 = 4 mm
b) 6 mm
a) 16 x 12 = 192 mm
b) = 300 mm
c) Least dimension = 860 mm
Concrete mix = M 30
VERTICAL LOAD:
Weight of entire foundation
((0.45-0.23)/3)* {(((0.57+(2*0.15))*(0.85+(2*0.15))) +(2.4*2.1)+
SQRT[(((0.57+(2*0.15))*(0.85+(2*0.15)))*(2.4*2.1)]}*25+(2.4*2.1*0.23*25)+(0.85*0.57*2.8*25)
= 78.09 kN
Weight of soil
(2.4*2.1*1.95*18)-78.09
= 98.814 kn.
0.85 0.15
2.4m
PLAN SECTION
DESIGN CALCULATION
Hence Safe
= 0.39
Hence Safe
= 38.25 KN/m²
= 20.77 kNm
Mu/bd² =
1.5*20.77*1000000/(1000*370^2)
= 0.2276
0.370
DOC. TITLE
M/s. DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD,
ORAGADAM
DOC. NO SGSE-DOC-LCEX-005 PREPARED CHECKED
REV. NO 0 DATE 21/06/2016 ARUN GSV
2.4m
Shear stress tv =
1.5*28.415*1000/(1000*370)
= 0.1152 N/mm2
Hence Safe
DESIGN OF PEDESTAL:
d'/D = 75 / 850
= 0.088
Pu/fckbD =
1.5*(329.42*1000)/(30*850*570)
= 0.03399587
Mu/fckbD² = 1.5*(25.2*1000*1000)/
(30*0.85*1000*(0.57*1000)^2)
= 0.0046
From Chart 32 p / fck = 0.01
Hence p = 0.01 x 30
= 0.3 %
a) 16/4 = 4 mm
b) 6 mm
a) 16 x 12 = 192 mm
b) = 300 mm
c) Least dimension = 850 mm
Concrete mix = M 30
VERTICAL LOAD:
Weight of entire foundation
((0.45-0.23)/3)* {(((0.57+(2*0.15))*(0.85+(2*0.15))) +(2.4*2.1)+
SQRT[(((0.57+(2*0.15))*(0.85+(2*0.15)))*(2.4*2.1)]}*25+(2.4*2.1*0.23*25)+(0.85*0.57*2.8*25)
= 78.09 kN
Weight of soil
(2.4*2.1*1.95*18)-78.09
= 98.814 kn.
DOC. TITLE
M/s. DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD,
ORAGADAM
DOC. NO SGSE-DOC-LCEX-005 PREPARED CHECKED
REV. NO 0 DATE 21/06/2016 ARUN GSV
0.85 0.15
2.4m
PLAN SECTION
DESIGN CALCULATION
e) Eccentricity = 0 / 126
= 0 < 2.4 / 6
0.400
i.e. = 0 < 0.4
Hence Safe
= 38.25 KN/m²
= -4.03 kNm
Mu/bd² =
1.5*-4.03*1000000/(1000*370^2)
= -0.0442
0.370
2.4m
= -0.022 N/mm2
DOC. TITLE
M/s. DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD,
ORAGADAM
DOC. NO SGSE-DOC-LCEX-005 PREPARED CHECKED
REV. NO 0 DATE 21/06/2016 ARUN GSV
Hence Safe
DESIGN OF PEDESTAL:
Maximum moment =
0+0*(1.95-0.45+1.3)
= 0 kN.m
d'/D = 75 / 850
= 0.088
Pu/fckbD =
1.5*(-17.055*1000)/(30*850*570)
= -0.0017601
Mu/fckbD² = 1.5*(0*1000*1000)/
(30*0.85*1000*(0.57*1000)^2)
= 0
From Chart 32 p / fck = 0.01
Hence p = 0.01 x 30
= 0.3 %
a) 16/4 = 4 mm
b) 6 mm
DOC. TITLE
M/s. DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD,
ORAGADAM
DOC. NO SGSE-DOC-LCEX-005 PREPARED CHECKED
REV. NO 0 DATE 21/06/2016 ARUN GSV
a) 16 x 12 = 192 mm
b) = 300 mm
c) Least dimension = 850 mm
Concrete mix = M 30
VERTICAL LOAD:
Weight of entire foundation
((0.45-0.23)/3)* {(((0.68+(2*0.15))*(0.83+(2*0.15))) +(2.9*2.8)+
SQRT[(((0.68+(2*0.15))*(0.83+(2*0.15)))*(2.9*2.8)]}*25+(2.9*2.8*0.23*25)+(0.83*0.68*2.8*25)
= 108.61 kN
Weight of soil
(2.9*2.8*1.95*18)-108.61
= 176.4 kn.
0.83 0.15
2.9m
PLAN SECTION
Hence Safe
= 0.39
Hence Safe
DESIGN CALCULATION
e) Eccentricity = 9 / 977
= 0.009 < 2.9 / 6
0.483
i.e. = 0.009 < 0.483333
DOC. TITLE
M/s. DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD,
ORAGADAM
DOC. NO SGSE-DOC-LCEX-005 PREPARED CHECKED
REV. NO 0 DATE 21/06/2016 ARUN GSV
FOOTING DESIGN
GENERAL DATA
Concrete mix = M 30
VERTICAL LOAD:
Weight of entire foundation
((0.45-0.23)/3)* {(((0.68+(2*0.15))*(0.83+(2*0.15))) +(2.9*2.8)+
SQRT[(((0.68+(2*0.15))*(0.83+(2*0.15)))*(2.9*2.8)]}*25+(2.9*2.8*0.23*25)+(0.83*0.68*2.8*25)
= 108.61 kN
Weight of soil
(2.9*2.8*1.95*18)-108.61
= 176.4 kn.
0.83 0.15
2.9m
PLAN SECTION
DOC. TITLE
M/s. DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD,
ORAGADAM
DOC. NO SGSE-DOC-LCEX-005 PREPARED CHECKED
REV. NO 0 DATE 21/06/2016 ARUN GSV
DESIGN CALCULATION
e) Eccentricity = -11 / 47
= -0.234 < 2.9 / 6
0.483
i.e. = -0.234 < 0.483333
Hence Safe
= 38.25 KN/m²
= -16.36 kNm
Mu/bd² =
1.5*-16.36*1000000/(1000*370^2)
= -0.1793
Percentage of reinforcement = 0.093
required (Pt) (As per Table 2 of SP16)
Ast required =
0.093/100*(1000*450)
= 418.5 mm²
Minimum reinforcement = 444 mm²
0.370
2.9m
Shear stress tv =
1.5*-20.053*1000/(1000*370)
= -0.0813 N/mm2
tc (Table 19 of IS 456-2000) = 0.403 N/mm²
Hence Safe
Hence Safe
DESIGN OF PEDESTAL:
Downward load = -237.84 kN
Total downward load on pedestal = -237.84+39.51
= -198.33 kN
DOC. TITLE
M/s. DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD,
ORAGADAM
DOC. NO SGSE-DOC-LCEX-005 PREPARED CHECKED
REV. NO 0 DATE 21/06/2016 ARUN GSV
Maximum moment =
0+-3.4*(1.95-0.45+1.3)
= -9.52 kN.m
d'/D = 75 / 830
= 0.09
Pu/fckbD =
1.5*(-198.33*1000)/(30*830*680)
= -0.01757
Mu/fckbD² = 1.5*(-9.52*1000*1000)/
(30*0.83*1000*(0.68*1000)^2)
= -0.0012
From Chart 32 p / fck = 0.007
Hence p = 0.007 x 30
= 0.21 %
= 1185.2 mm²
a) 16/4 = 4 mm
b) 6 mm
a) 16 x 12 = 192 mm
b) = 300 mm
c) Least dimension = 830 mm
Concrete mix = M 30
VERTICAL LOAD:
Weight of entire foundation
((0.53-0.23)/3)* {(((0.8+(2*0.15))*(0.85+(2*0.15))) +(3.1*3)+
SQRT[(((0.8+(2*0.15))*(0.85+(2*0.15)))*(3.1*3)]}*25+(3.1*3*0.23*25)+(0.85*0.8*2.72*25)
= 134.7 kN
DOC. TITLE
M/s. DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD,
ORAGADAM
DOC. NO SGSE-DOC-LCEX-005 PREPARED CHECKED
REV. NO 0 DATE 21/06/2016 ARUN GSV
Weight of soil
(3.1*3*1.95*18)-134.7
= 191.73 kn.
0.85 0.15
3m 0.8 1.95m
0.53
0.23
3.1m
PLAN SECTION
DESIGN CALCULATION
Not Safe
= 0.39
Not Safe
= 38.81 KN/m²
Mu/bd² =
1.5*-55.9*1000000/(1000*450^2)
= -0.4141
Ast required =
0.093/100*(1000*530)
= 492.9 mm²
0.450
DOC. TITLE
M/s. DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD,
ORAGADAM
DOC. NO SGSE-DOC-LCEX-005 PREPARED CHECKED
REV. NO 0 DATE 21/06/2016 ARUN GSV
3.1m
Shear stress t v =
1.5*-63.387*1000/(1000*450)
= -0.2113 N/mm2
Maximum moment =
0+82.866*(1.95-0.53+1.3)
= 225.4 kN.m
d'/D = 75 / 850
= 0.088
Pu/fckbD =
1.5*(-326.26*1000)/(30*850*800)
= -0.0239897
Mu/fckbD² = 1.5*(225.396*1000*1000)/
(30*0.85*1000*(0.8*1000)^2)
= 0.0207
Hence p = 0 x 30
= 0 %
a) 16/4 = 4 mm
DOC. TITLE
M/s. DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD,
ORAGADAM
DOC. NO SGSE-DOC-LCEX-005 PREPARED CHECKED
REV. NO 0 DATE 21/06/2016 ARUN GSV
b) 6 mm
a) 16 x 12 = 192 mm
b) = 300 mm
c) Least dimension = 850 mm