Академический Документы
Профессиональный Документы
Культура Документы
CORPORATION LIMITED
TECHNICAL SPECIFICATION
VOLUME-IIA
BID DOCUMENT NO: NESCL/OPTCL/CS-OS-616-01
(PACKAGE-1)
FOR
(PACKAGE-1)
ON TURNKEY BASIS
LINE PACKAGE
i) Design, manufacture, testing, supply & commissioning of all equipments for different
substations and transmission lines, as detailed in the specifications and schedule of
quantities and in subsequent clauses except supply of power transformer and
PLCC indoor equipments which shall be supplied by the Employer. The contractor
shall load, unload, transport, erect, connect to the system, test and commission the power
transformer & the PLCC equipments. Since there will be LILO on existing lines, the
installations of PLCC equipment at remote (existing) end and proposed end of the sub-
stations shall be under the scope of the contractor. A general single line diagram showing
installations, removing and erection of PLCC equipments has been provided in the
technical specification. An indicative structural layout of the substation has been provided
in the technical specification which may be followed as a basis for finalization of the
substation structural layout in consultation with OPTCL.
ii) Execution of all civil works as per schedule for erection of all substation equipments,
structures and foundation of transformers, control rooms, store sheds, pump house, D&E
type quarters, roads, culverts, rain water harvesting arrangements etc. , construction of
earth mat, cable trench, drainage system, boundary wall etc.
iii) Erection, testing, commissioning of all equipment and handing over of the substation
bays complete in all respect as per approved scheme and to the satisfaction of the
Employer including statutory inspection.
vi) The contractor(s) has the responsibility to arrange clean water for construction and curing
to the civil works.
vii) The work as mentioned in the price schedule shall generally be considered for the
evaluation of the bid.
viii) The contractor shall have to engage his own security at his own cost for security of all the
materials including owners supply materials (handed over to him for the site) that are
required for successful completion of the project till final handing over of the entire work
to OPTCL.
ix) Contractor has to obtain Project License in respect of the projects from the competent
authority at his own cost, prior to commencement of works.
x) The scope of work includes the provision of one official copy of each Standard listed in
the appropriate schedule.
The scope of work on Turnkey basis includes design, engineering, manufacture, type testing,
(factory testing) supply on FOR destination site basis, transportation, handling, storage at site,
erection, site testing, commissioning complete in all respects and maintenance of plant and
equipment until handing over of works in accordance with Conditions of Contract and the
stipulations under various chapters of this specification at the prices stated in the Price Schedule
for the following
i. 132/33 KV sub station comprising of (2X12.5 MVA) sub-station as per single line
diagram attached for the purpose.
ii. Associated 132 KV LILO transmission line of 3.21 kM on double circuit towers.
(c) At PURUSHOTAMPUR(District-GANJAM)
The exhaust fans will be having 600 mm. Diameter for battery room and 450 mm diameter
for the toilet, propeller type conforming to IS: 2312 and designed for continuous use. The
exact locations of fixing the exhaust fans will be finalized while approving drawing for
control room building. The supply voltage of exhaust fans shall be 230 V A.C. depending
on rating of the fan. Exhaust fans will be having 4 poles to obtain a speed of 1440 r.p.m,
29. Any other items required for completion of the project are also in the scope of this
contract in order to complete the sub-station in all respect.
ii) Erection, testing & commissioning of the following equipments:
1. Power transformers /auto transformers
2. Indoor PLCC equipments at both the ends
iii) Only supply of the following equipments:
1. Mandatory spares for substation equipment being supplied under this contract as perBid
proposal Sheet( BPS) schedule-3.
2. Maintenance & testing equipment etc as per the list provided in relevant chapter of
technical specifications.
2) Supply of all clamps, connectors and hardware required for commissioning of the
substation. The quantity and rating of the connectors and clamps are dependent on the
layout and requirement of the substation.
3) Soil testing for soil resistivity and soil bearing capacity before designing.
4) Site development including leveling, filling & compacting of the sub-station area to the
desired height.
6) Construction of boundary wall along the property line of the substation with Main gate,
security shed and two nos. switch yard gates in the sub-station. Provisions of a security
shed near the main gate. The structure shall be RCC framed structure. There shall be
provision of electrical illumination facilities.
8) There shall be provision of plantations of fruit bearing plants and water tap provision for
watering the plants in the sub-stations.
9) Construction of all foundations for columns , gantries ,all switchgear such as circuit
breakers and isolators, CT’s, CVT’s and other substation equipment such as line traps, bus
bar post insulator, etc.
10) Construction of foundation of transformer and reactors including supply and putting of
rail from the service bay to the transformer plinth, all foundations of columns, equipment
structures. Separate foundations for the marshalling boxes of the isolators are to be
considered.
12) Switchyard buildings such as control room, DG set room and fire fighting pump house.
There shall be provision of a water cooler including water purifier inside the control room
building. Provision of split type air conditioners inside the control room & PLCC room of
Control Room building and conference area.
15) Supply and spreading of uniform 20mm nominal size HG metal of 100mm thick inside
both the switch yard area of the Sub- Stations. The spreading will be done above a
finished level of switch yard land by plain cement concrete of thickness 75 mm (ratio
1:4:8). Anti weed treatment of the switch yard area to be made as per prevailing practice
before spreading of PCC.
16) Construction of drainage system of the sub-stations and the newly constructed quarters &
flood water discharge systems. Miscellaneous works like manholes soak pits, RCC,
trench, fencing, etc. within the switchyard.
18) Construction of cable trenches with trays & covers & sump pit with pump, as per
requirement.
19) Construction of approach road to the new sub-stations as per requirement. Construction of
periphery roads inside the fencing. The roads inside the switchyard & at the periphery
shall be of 3.75 mtrs wide & the road inside switch yard shall be of concrete road as per
technical specification. The other roads main and approach road shall be 7 mtrs wide and
shall be bitumen grading.
20) Supply and putting of sub-station illumination system. All the light fittings shall be metal
halide type & these fittings shall be mounted on switch yard portal structures such as
columns & beams. No separate lighting mast is required. Entire substation lighting system
in the switch yard & colony shall be designed using under ground cables only. No over
head conductors are permitted for this purpose. For street lighting one outdoor lighting
kiosk with two incomers of 200A rating switch fuse units (SFU) & with six feeders of
32A rating fitted with MCB shall be considered. Similar type of out door kiosk shall be
considered for colony power supply with 200A SFU & ten out going feeder of 32A rating
fitted with MCB shall be considered
21) Designing and providing the earth mat and earthing of the sub-station lighting protection,
equipment earthing etc. Earth mat shall be designed using 75X10mm GI flat. For
lightening protection individual spike not less than 2.5mtrs shall be provided on each
column of the switchyard. Water tap provision shall be provided for pouring water into the
earth pits constructed inside & around the periphery fence the switchyard. The earthing
shall be extended beyond 2 mtrs from the fencing and the fencing earthing are also to be
taken care.
22) Boring of two nos. new bore wells at a suitable location including construction of RCC
pump house with 5 HP submersible pumps and its control inside the new proposed sub-
station area. Making water supply arrangement for the colony and the Substation area
23) Township colony, residential quarters for staff and employees of the Employer including
electrification, water supply & other amenities for quarters.
24) Civic amenities for the township including drainage and sewerage systems.
25) All other materials, which the contractor feels to be required for completion of the sub-
station.
2. The contractor shall have to solve the entire right of way problem at his own cost.
Contractor shall also resolve the issues related to the tree cutting in the transmission
line and sub-station at his own cost. However the details of ROW issues has been
indicated in Special Condition of Contract (SCC) –Vol.-1A.
ii) Design & Manufacturing (as applicable), supply, storage, erection, testing & commissioning
of following materials
2. Foundation for various types of towers including revetment and piling (including under
Rim piling & river bed piling as per requirement) works if required.
6. Any other items required are also in the scope of this contract in order to complete the
proposed transmission lines in all respect.
i) Bus 1550/1050/650/170
i) Phase-to-phase 4200/2100/1300/320
Selection of ACSR conductor shall be Chosen from Moose, Zebra and panther as per
requirement and decision of employer.
4. Design work
The Bidder shall furnish detailed design of the substations & transmission lines. The
design work shall include but not limited to technical calculations, preparation of
drawings and bill of materials and specifying equipments not specified in the
specification but necessary for the completion of the substations & transmission lines on
the turnkey basis. The technical calculation design drawings, etc. shall be submitted to
5. Standards
All materials and equipments shall generally comply in all respects with the latest
edition of the relevant Indian Standards. International Electro-Technical Commission
(IEC) or any other internationally accepted Standard equivalent or better than relevant
Indian Standard. Equipment complying with all other authoritative standards such as
British, ASA, VDE, etc. will also be considered if performance equivalent or superior to
Indian Standard is ensured.
In case of adopting any standard other than that IS or IEC, a complete set of adopted
standard shall be supplied by the bidder. However it is desirable and preferred that the
equipment offered shall comply with one consistent set of standard unless other than
exceptional cases.
The equipment shall also comply with the latest revision of Indian Electricity Act and
Indian Electricity Rules and any other Electrical Statutory Provision, Rules and
Regulations.
6. Reference Drawings
Drawings showing indicating scope of work are enclosed. Drawings are complementary
to specifications and shall be referred to for better understanding as well as for estimation
of quantities and bill of materials for arising at lump sum bid price on turnkey basis.
The bidder shall submit with the tender, plan of the substation showing broadly the scope
of work incorporated as per technical specification. All the drawings shall be submitted in
quadruplicate, enumerated in conformity with relevant clause stipulated in the Technical
Section.
These drawings shall show proposed layout plan with section. Drawings sufficient overall
dimension, clearance etc. required for assembling and dismantling and space
requirements of all the apparatus to be supplied to enable the Employer to examine the
design and layout at the installation.
Container/Cartoons, boxes, trunks and other packages shall be strong and sturdy in
construction to withstand Ocean shipping. Several times loading and unloading, transport
on rough roads, and storage in tropical area and hauling and handling during erection etc.
Boxes and packages shall also be protected by suitable lagging or galvanized steel strips.
c. Net/gross weight.
The employer shall take no responsibility for any damage done to the plant on route to
the site of work or place of delivery whichever is applicable.
8. Tests
i. Unless otherwise specified in respective section, all equipment shall be subjected
routine and type test as covered and specified in any standard in presence of the
authorized representative of the employer.
ii. Bidder shall submit type test report from a recognized laboratory along with the
bid.
iii. At least 15 days advance notice shall be given by the contractor to the employer
for witness the tests.
ii) The agency shall posses valid contractor’s license issued by the Electrical
Licensing Board of Odisha (ELBO) failing which he will not be allowed to start
the work.
iii) All supervisory of works shall posses appropriate valid supervisory certificate of
competency issued ELBO, Odisha.
10. Bidder has to follow submission of drawings, data, document as per the
format given below.
16. Interconnection
diagrams.
17. Relay setting
calculations and
Coordination
drawings.
18. SLDs of ACDB
and DCDB.
19. Soak pit and waste
oil pit layout and
sizing calculation.
20. Structural design
calculations
super structures.
21. Civil drawings for
foundation and
cable trenches.
22. Structural fabrication
drawings of
equipments gantries
etc.
23. Filled in equipment
data sheets as per
enclosed format.
24. Complete literature,
leaflets for all
equipments.
25. Operational/
maintenance manual.
26. Deviation schedule
w.r.t.
a) Specification
b) Document/
attachments.
27. List of spare parts for
each major
equipment.
28. List of special tools
and tackles.
29. List of sub-vendors.
30. QA plan of vendor
31. Installation operating
and maintenance
instruction.
32. Inspection Plan and
Testing Procedure.
33. Test Records.
11. Minimum clearance for substation design shall be as per details given in
the table below.
Highest Insulation Switching Sectional Minimum clearance Ground
system level Impulse Clearance Clearanc
voltage (kVP) Voltage (mm) e (mm)
(kV) (KVP)
Between Between
phase & phases
ground
A 220 KV SIDE:
1. COLUMN: P1S TYPE,- HEIGHT-21.5 MTRS,WEIGHT-4.464MT
2. BEAM:Q1 TYPE,-LENGTH-18 MTRS, WEIGHT-1.473MT
B 132 KV SIDE:
1. COLUMN: T1S TYPE,- HEIGHT-15 MTRS,-WEIGHT-1.193 MT
2. COLUMN: T4S TYPE,-HEIGHT-11 MTRS,-WEIGHT-0.924 MT
3. BEAM:G1 TYPE,-LENGTH-10.4 MTRS,-WEIGHT-0.613 MT
4. BEAM:G2 TYPE,-LENGTH-14.9875 MTRS,-WEIGHT-0.906 MT
5. BEAM:G1X TYPE,-LENGTH-10.4 MTRS,-WEIGHT-1.370 MT
4. CR Panels-Siemens/ Areva/ABB.
13. Tower Structure: Either from the OPTCL Rate contract holders or from Reputed make
to be approved by OPTCL
14. PVC insulated Control and XLPE insulated Power cable- Nicco, Gloster, CCI, KEI,
Crystal, Poly Cab
16. Earth Wire: Bharat Wire ropes, Usha Martin, UIC Wires.
** The multimeters (both digital and analogue), clamp on meters, earth tester shall
preferably of “Motwane” make. Prior approvals of OPTCL for all the testing equipments are
to be taken.
** All the T&P’s shall be of Taparia make. The hand drill and vacuum cleaner shall be wolf
and Eureka Forbes make.
Office furniture shall be supplied & installed at each substation as per the list given below. All
the furniture shall be of Godrej make. Before supply of the furniture to the sub-station,
approval from OPTCL is required. Details of the scope of supply are as indicated below.
G2 10.4 G1 G1 G2 R
R 14.9875 14.9875
T4S T4S O
O T4S T4S
A
A
G2 T4S G2 D
D 14.9875 14.9875
G1
G1 G1 G1 G1
T1S T1S
TIS TIS T1S T1S T1S
8.4 8.4
Transf Transf
ormer ormer
3.5 3.5
G1,2 G1,2
T1S TIS T1S T1S
4.5 10.4 10.4 4.5
R O A D R O A D
R 4.5 R
33 KV SIDE T9S
O T9S T9S T9S O
7.05
T8S G4 G4 G4 G4 T8S T8S G4 G4 G4
5.5 5.5
R O A D R O A D
Page 1 of 1
SLD FOR 132/33kV SUB-STATION AT PURI FOR SAMUKA BEACH
Feeder-1 Feeder 2
40MVA, 20MVA,
132/33kV 132/33kV
PVC CABLE
33kV MAIN BUS
33KV BAY
FEEDER 05 NOS. PVC CABLE
TRANSF 02 NOS.
BUS COU 01 NO. AB SW HG FUSE STN TFR
33/0.4KV
250KVA
F1 F2 F3 F4 F5
Page 1 of 3
132/33kV SUB-STATION AT PURI FOR SAMUKA BEACH
SYMBOLS USED
SURGE ARRESTOR
AUTO TRANSFORMER
WAVE TRAP
ISOLATOR
EARTH SWITCH
CKT BKR
Page 2 of 3
132/33kV SUB-STATION AT PURI FOR SAMUKA BEACH
REQUIREMENT OF EQUIPMENT/MATERIALS
132kV EQUIPMENTS / MATERIALS 33kV EQUIPMENTS / MATERIALS
Sl No. Items Qty Sl No. Items Qty
1 SF6 Circuit Breake 5 1 Vaccum C Breaker 8
2 Current Transform 15 2 Current Transform 24
3 CVT 6 3 IVT 3
4 IVT 3 4 Surge Arrester 21
5 Surge Arrester 12 5 BPI 16
6 Wave Trap 4 6 SI w/o ES 9
7 BPI 16 7 DI w/o ES 2
8 SI w/o ES 8 8 DI with ES 5
9 DI w/o ES 2 9 SI with BM 2
10 DI with ES 2 10 NCT 4 For Tfr
11 D Ten Insulator str 18 11 D Ten Insulator str 18
12 S.Ten Insulator str 42 12 S.Ten Insulator str 39
13 Sus Insulator string 21 13 Sus Insulator string 36
14 BMK 3 14 BMK 3
15 Lighting Board 1 15 Lighting Board 1
16 Receptical Board 1 16 Receptical Board 1
17 Receptical Tfr oil fi 1 17 T9S 11
18 T1S 16 18 T8S 9
19 T4S 5 19 G4 7
20 G1 7 20 G4X 4
21 G2 4 21 G6 3
22 G1,2 2 22 250 KVA STN TFR 2 For Stn Tfr
23 G1X 4 23 HG FUSE SET 2 For Stn Tfr
24 AB Switch 2 set For Stn Tfr
25 Surge Arrester 6 For Stn Tfr
Page 3 of 3
CHANDPUR
132 KV 132 KV
FDR FDR
BUS PT
132 KV BAYS
FEEDER 02 NOS. 132kV MAIN BUS
TRANSF 02 NOS.
BUS COU 01 NO.
12.5MVA, 132/33kV
TRANSFORMER 12.5MVA, 132/33kV
TRANSFORMER
Page 1
PURUSOTTAMPUR
132 KV 132 KV
FDR FDR
BUS PT
132 KV BAYS
FEEDER 02 NOS. 132kV MAIN BUS
TRANSF 02 NOS.
BUS COU 01 NO.
12.5MVA, 132/33kV
TRANSFORMER 12.5MVA, 132/33kV
TRANSFORMER
Page 1
SCHEMATIC LAYOUT FOR SPEECH,PROTECTION & DATA CONNCWETIVITY RELATED TO LILO OF 132KV KHURDA-PURI SAMUKA BEACH
Y Y Y
B WT WT B WT B WT
CVT
CVT CVT CVT CVT CVT
LMU LMDU LMDU LMU LMDU LMU LMU LMDU LMU LMDU LMU LMDU
48V/300AH FCBC
BATT (75A)
S
STALLION MODULE
M R P
(CFE-1)
U A L
ULDC PROJECT'S X C I
R WIDEBAND NETWORK T
A MUX T
C 1511 E STALLION MODULE
BA R (CFE-2)
(SP100)
M
BBSR SUB-LDC
SCHEMATIC LAYOUT FOR SPEECH,PROTECTION & DATA CONNECTIVITY RELATED TO LILO OF 132 KV KHURDA-BALUGAON AT CHANDPUR
LMDU LMU LMU LMDU LMD LMU LMDU LMU LMDU LMU LMDU
LMDU
ETL-41 ETL‐41 ETL‐42 *ETI‐22 * ETI-21 * ETI-21 *ETI‐22 ETL‐42 ETL‐42 ETL‐42 ETL‐41 ETL‐41 ETL‐42
N PLCC PLCC PLCC PLCC PLCC EPBAX PLCC PLCC PLCC N PLCC PLCC PLCC PLCC
S # Ch1 Exsting SLDC- SLDC- existing # Ch1 S RTU # Ch1 SLDC- SLDC- # Ch1
K Data Data Sp+Data Balugaon Balugaon Sp+Data K Prot. BAM BAM Sp+Prot.
5 Speech Speech 5 Speech Speech
# Ch2 Khurda- Khurda- # Ch2 # Ch2 # Ch2
Prot. Balugaon Balugaon Prot. Khurda- Khurda-
Speech Speech Balugaon Balugaon
Speech Speech
48V/300AH FCBC
* Marked ETI21/ETI22 PLCC sets working at BATT (75A)
Balugaon for Khurda direction
will be shifted to Chandpur &
used for SLDC‐Balugaon speech & Khurda‐
S STALLION MODULE
Balugaon Exp communication.
P
M R L CFE-1
R ULDC PROJECT'S U A I
A MUX WIDEBAND NETWORK X C T
C 1511 1511 T STALLION MODULE
BA BA E
R CFE-2
(SP
Sub-LDC,BBSR
GENERAL MANAGER
TELECOMMUNICATION
SCHEMATIC LAYOUT FOR SPEECH,PROTECTION & DATA CONNECTIVITY RELATED TO LILO OF 132 KV CHHATRAPUR-ASKA AT PURUSOTTAMPUR
LMDU LMU LMU LMDU LMD LMU LMDU LMU LMU LMDU
LMU LMDU
ETL-41 ETL‐41 ETL‐42 *ETI‐21 *ETI‐21 ETL‐42 ETL‐42 ETL‐41 ETL‐41 ETL‐42
N PLCC PLCC PLCC PLCC PLCC PLCC N PLCC PLCC PLCC PLCC
S # Ch1 Exsting existing # Ch1 S RTU # Ch1 # Ch1
K Data Data Data Data K Data Speech
5 Speech Speech 5 Speech Prot
EPBAX # Ch2 # Ch2 Speech
# Ch2 Prot. Speech. # Ch2
Prot.
* Marked ETI PLCC set working
48V/300AH FCBC
at Aska for Chhatrapur direction BATT (75A)
will be shifted to Chhatrapur &
used for Purusottampur‐Chhatarpur
Speech.
S STALLION MODULE
P
M R L CFE-1
R ULDC PROJECT'S U A I
A MUX WIDEBAND NETWORK X C T
C 1511 1511 T STALLION MODULE
BA BA E
R CFE-2
(SP
Sub-LDC,Jayanagar
GENERAL MANAGER
TELECOMMUNICATION
GUARANTEED TECHNICAL
PARTCULARS
23. Literature
Whether the followings are enclosed?
24.1 CORE:-
a) Core diameter (mm)
b) Window Weight (mm)
c) Leg centre (mm)
d) Net cross sectional area of iron
In the core (mm² )
e) Core lamination thickness (mm)
f) Type & grade of core.
g) Design flux density at rated voltage.
And rated frequency (Tesla)
h) Design flux density at highest system voltage
& lowest system frequency (Tesla).
i) Minimum knee point voltage (volts).
a) No.of turns
b) Bare conductor size (mm)
c) Insulated conductor size (mm)
d) Cross-sectional area (sq.mm)
e) Current density (A/ mm²)
f) Conductor material.
g) Class of Insulation.’
h) Power frequency withstand
Level (KV-rms).
Date of Test.
2
Name of the Laboratory where the Test has
3
been conducted.
NESCL/OPTCL/CS-OS-616
Approved.
5
Clause No.8.1 of T.S.
6
not ?
ANNEXURE-C
7
require-ments as per TS.
Re mark
Values/ Others
1. Manufacturer’s Name
2. Rated output of the charger
2.1 Voltage (volts)
2.2 Current (amps)
2.3 Power factor
3. Short time rating
4. Type of cooling
5. Hottest stack temperature (0C)
6. Charger dimensions
6.1 Height (mm)
6.2 Depth (mm)
6.3 Width (mm)
6.4 Sheet thickness (mm)
7. Charger weight
8. Charger rated output current
8.1 Float charging mode
8.2 Boost charging mode
9. Load limiter current setting range (Trickle mode)
10. RECTIFIER TRANSFORMER Float Boost
22.2 Type
(a) Ammeter
(b) Voltmeter
22.3 Standard
(a) Ammeter
(b) Voltmeter
22.4.1 Ammeter
(a) Float charger
(b) Boost charger
(c) Battery float
(d) Battery boost
Name of Meters & Date of Due date of Name of Whether Whether Whether the Whether the Whether the Inspite of Remarks
the Test Equipments Calibr- Calibration the Calibrating documents meters/ calibrating calibrating imposed
required for the ation Calibratig Agency is relating to Govt. equipments agency has agency has put limitations.
corresponding Agency Govt. approval of the fulfil the put any any limitation Whether the
test with range, approved calibrating accuracy limitation towards the use particular meter
accuracy, make Agency class as per towards the of the / equipment can
& Sl. No. furnished calibration use of the particular still be used ?
report. particular meter/equip- Justify its use
meter/ ment/ meter. for
equipment. If State the colour corresponding
yes, state the of the affixed test(s)
limitations sticker
1 2 3 4 5 6 7 8 9 10 11 12
Name of the Date of Name of the Whether the Whether the Whether the Whether the If the type tested battery does not Remarks
Type Test Test Laboratory where Laboratory is Test report is Test report in type tested fulfill the technical requirements as
the Test has been Government valid as per complete Plante lead per this specification, whether the
conducted approved Spn. shape acid battery bidder agrees to conduct he particular
alongwith fulfills the type test again at their own cost
drawings etc. technical without any financial liability to
furnished or requirements OPTCL in the presence of OPTCL’s
not ? as per TS representative within the specified
delivery period
1 2 3 4 5 6 7 8 9
Name of Date of Name of the Whether the Whether the Whether the Whether the If the type tested battery charger does not Remarks
the Type Test Laboratory Laboratory is Test report is Test report type tested fulfill the technical requirements as per this
Test where the Test Government valid as per in complete battery specification, whether the bidder agrees to
has been approved Spn. shape charger conduct he particular type test again at their
conducted alongwith fulfills the own cost without any financial liability to
drawings technical OPTCL in the presence of OPTCL’s
etc. requirements representative within the specified delivery
furnished or as per TS period
not ?
1 2 3 4 5 6 7 8 9
FOR
( To be filled in & furnished by the Bidder , separately for 245kv &145 KV SF6
Circuit Breakers)
4. Number of Poles
5. Class
a) Opening
Arcing time no. of loops and time
including resistor current duration
(cycle)
i) Unloaded transformers
ii) Loaded transformer
iii)Open circuited lines
42. When switching of synchronous systems:
(a) Max. current (kA)
(b) Max. contacts of 1 pole (kV)
c ) Overall dimensions:
Height (mm)
Width (mm)
Length (mm)
(B)- Type & Material of Gasket used to
ensure gas tight joints for
(i)Metal to Metal Joint
(ii) Metal to Porcelain Joints
(C ) Type & Make of
a) Density Monitor
b)Pressure Gauge
(D) Density Monitor Setting
a) Lock Out
b) Alarm
45. Porcelain:
a) Make
b) Type
c) Descriptive pamphlet no.
d) Weight (kg.)
e) Transport dimensions (mm)
f) Height above floor, required to remove
porcelain (mm).
g) Insulation class
h) One minute power frequency withstand,
kV (rms) (dry & wet)
i) Flash over voltage (kV)
j) Lightning impulse withstand voltage kV
(peak) (dry & wet)
k) Switching surge withstand voltage kV
(peak) (wet)
l) Corona discharge voltage (kV rms)
CIRCUIT BREAKERS
1. Name of Manufacturer.
3. Rated Voltage. - KV
8. Breaking capacity.
a) Symmetrical. KVA
b) Assymmetrical. MVA
9. Making capacity. KA
13. Minimum reclosing time at full rated - M.S. Interrupting MVA from
the instant ofTrip coil energisation.
17. 1.2/50micros full wave impulse withstand test voltage for the two cases above.
i) Type of bushing. -
i) Between phases. - mm
i) Operning
ii) Closing.
Name of the
Firm:-
Signature of
the bidder:-
Designation &
seal:-
Date:-
FOR
CURRENT TRANSFORMER
1. Bidder’s name
and address
2. Name and
address of the
Manufacturer
3. Manufacture’s
type designation
4. Standards
applicable
5. Rated frequency
(HZ)
6. Rated Voltage
(KV)
7.0 Rated current
(A)
7.1 Rated
continuous
current (A)
7.2 Rated extended
primary current
(A)
8. Short time
thermal current
withstand for
stipulated time
duration (KA)
9. Dynamic current
withstand (KAP)
10. 1.2/50 μs
impulse
withstand
voltage (KVP)
14. No. of
secondary turns
(Knee point
voltage) (mA)
19.2 25% KPV (Knee
point voltage)
(mA)
19.3 20% KPV (Knee
point voltage)
(mA)
19.4 10% KPV (Knee
point voltage)
(mA)
20. Instrument
security factor at
different ratios.
21. Radio
interference
voltage at 1.1 Vr
/ 31/2 at 1.0 MHZ
(Micro volts)
22. Whether
auxiliary CT
provided for
metering
winding
23. Corona
extinction
voltage (KV
rms)
24. Partal discharge
level (PC)
25. Total creepage
distance (mm)
26. Primary
26.1 No. of primary
turns
26.2 Material and
cross-section of
primary (mm2)
conforms
generally.
32. Characteristics
of oil (prior to
filling)
32.1 Breakdown
voltage (KVrms)
32.2 Dielectric
dissipation
constant (tan
delta)
32.3 Water content
(ppm)
32.4 Gas content
32.5 Interfacial
tension at 270C
(N/m)
32.6 Specific
resistance
32.6 At 900C (Ωcm)
.1
32.6 At 270 C (Ωcm)
.2
33. Whether current
transformers are
hermetically
sealed. If so,
how ?
34. Total weight
(Kg)
35. Transport
weight (Kg)
36.1 Temperature
rise over an
ambient
temperature of
500C for
continuous
operation at
rated
continuous
thermal current.
36.1 Winding
36.2 Oil
36.3 External surface
of the core,
metallic parts in
contact with or
adjacent to
insulation.
37. Whether CT
characteristic
curves
enclosed.
37.1 Ratio and phase
angle curve
37.2 Magnetisation
curves
37.3 Ratio correction
factor curves.
38. DATA ON
PRIMARY
WINDING
38.1 Rated primary
current (A)
38.2 No. of
conductors in
one turn
38.3 No. of turns of
primary
38.4 Material of the
primary
conductors
38.5 Size of the
primary
conductor
(Bare/ Insulated
(mm x mm)
38.6 Cross-sectional
area of each
conductor
(mm2)
38.7 Total cross-
sectional area of
primary winding
(mm2)
conductors
38.8 Current
density(A/mm2)
(i) At highest
ratio
(ii) At
intermediate
ratio
(iii) At lowest
ratio
38.9 Short circuit
current densiry
(A/mm2)
(i) At highest
ratio
(ii) At
intermediate
ratio
(iii) At lowest
ratio
38.1 Ampere-turn of
0 Primary (AT)
(i) At highest
ratio
(ii)At
intermediate
ratio
(iii) At lowest
ratio
38.1 Length of
1 primary
conductor (m)
38.1 Weight of
2 primary winding
(kg.)
39. CORE
39.1 Material and
grade of the
core
39.2 Thickness of
core (mm)
39.3 Net Iron cross-
sectional area of
core (mm2)
39.3 Core-1
.1
39.3 Core – 2
.2
39.3 Core – 3
.3
39.3 Core – 4
.4
39.3 Core – 5
.5
39.4 Mean magnetic
path length (cm)
39.4 Core – 1
.1
39.4 Core – 2
.2
39.4 Core – 3
.3
39.4 Core – 4
.4
39.4 Core – 5
.5
.5
39.9 Weight of the
core (kg)
39.9 Core – 1
.1
39.9 Core – 2
.2
39.9 Core – 3
.3
39.9 Core – 4
.4
39.9 Core – 5
.5
40. SECONDARY
WINDINGS
40.1 Rated
secondary
current (A)
40.2 Material of the
secondary
windings
40.3 Size of the
. secondary
conductor [Bare
/ Insulated]
[mm]
40.3 Core – 1
.1
40.3 Core – 2
.2
40.3 Core – 3
.3
40.3 Core – 4
.4
40.3 Core – 5
.5
40.4 Cross sectional
area of the
secondary
conductor
(mm2)
40.4 Core – 1
.1
40.4 Core – 2
.2
40.4 Core –3
.3
40.4 Core – 4
.4
40.4 Core – 5
.5
40.5 Current density
of secondary
windings
(A/mm2)
40.5 Core – 1
.1
40.5 Core – 2
.2
40.5 Core – 3
.3
40.5 Core – 4
.4
40.5 Core – 5
.5
40.6 No. of
secondary turns
40.6 Core – 1
.1
40.6 Core – 2
.2
40.6 Core – 3
.3
40.6 Core – 4
.4
40.6 Core – 5
.5
40.7 No. of layers
40.7 Core – 1
.1
40.7 Core – 2
.2
40.7 Core – 3
.3
40.7 Core – 4
.4
40.7 Core – 5
.5
40.8 No. of turns /
layer
40.8 Core – 1
.1
40.8 Core – 2
.2
40.8 Core – 3
.3
40.8 Core – 4
.4
40.8 Core – 5
.5
40.9 Average length /
turn of
secondary
windings (mm)
40.9 Core – 1
.1
40.9 Core – 2
.2
40.9 Core – 3
.3
40.9 Core – 4
.4
40.9 Core – 5
.5
40.1 Resistance of
0 the conductor
used for
secondary
winding per
meter length at
750C (Ω/M)
40.1 Weight of
1 secondary
windings (kg)
40.1 Core – 1
1.1
40.1 Core – 2
1.2
40.1 Core – 3
1.3
40.1 Core – 4
1.4
40.1 Core – 5
1.5
41 INSULATION
41.1 Name and class
of insulating
material
between core
and secondary
winding.
41.2 Name/s of
Insulating
materials
between
secondary
winding and
primary
windings.
41.3 Insulating
materials used
to achieve
grading of
capacitance.
42. DIAMETER OF
WINDINGS
42.1 Inside / outside
diameter of
secondary
windings (mm)
42.1 Inside / outside
.1 diameter of
secondary
windings (mm)
42.1 Core – 1
.1
42.1 Core – 2
.2
42.1 Core – 3
.3
42.1 Core – 4
.4
42.1 Core – 5
.5
42.2 Inside / outsde
diameters of
primary winding
(mm)
42.3 Minimum
clearance from
tank (mm)
42.4 Minimum
clearance from
secondary to
tank (mm)
43. TANK AND
SECONDARY
TERMINAL
BOX
43.1 Material of the
CT tank
43.2 Material of the
CT secondary
terminal box
43.3 Thickness of CT
tank material
(mm)
43.4 Thickness of CT
secondary
terminal box
material (mm)
43.5 Zinc coating of
the CT tank
(gm/m2) as per
relevant upto
date ISS
43.6 Zinc coating of
the CT
secondary
terminal box
(gm/m2) as per
the relevant
upto date ISS.
43.7 Ingress
protection rating
of the
secondary
terminal box.
43.8 Weight of the
tank, fittings and
other
accessories (kg)
44. TERMINAL
CONNECTOR
44.1 Manufacturer’s
name
44.2 Applicable
standard
44.3 Type
44.4 Material of
connector
44.4 Clamp body
.1
44.4 Bolts and Nuts
.2
44.4 Spring washers
.3
44.5 Rated current
(Amp)
44.6 Rated terminal
load (Kg)
44.7 Factor of safety
44.8 Minimum
thickness of any
part (mm)
44.9 Weight of clamp
complete with
hardwares (kg)
44.1 Type test
0 reports as per
IS enclosed
44.1 OGA drawing
1 enclosed
45. INSULATOR
45.1 Manufacturer’s
name
45.2 Type
45.3 Applicable
standards
45.4 Height (mm)
45.5 Diameter (top)
(mm)
45.7 Total creepage
distance (mm)
45.8 Rated voltage
. (KV)
45.9 Power
frequency
withstand
voltage for 1
min. dry and
wet.
(KV – rms)
45.1
0 1.2/50 micro-
sec impulse
withstand
voltage (KVP)
45.1 Corona
1 extinction
vollage (KV)
45.1 Weight (Kg)
2
45.1 Maximum
3 allowable span
(mm)
45.1 Cantilever
4 strength (Kg)
45.1 The drawing
5 enclosed.
46. Dielectric
dissipation
factor at
245/1.732KV
(for 220KV C.T)
and 145/1.732
KV (for 132 kv
C.T.) at ambient
temperature.
47. Accuracy class
of standard C.T.
to be used
towards
determination of
ratio errors and
phase angle
errors for
metering cores.
FOR
2 Catalogue Number -
3 Conductor Material -
5 Conductor Shape -
8 Number of Cores —
10 Insulation Material -
15 Sheath Material -
16 Type of armouring —
39 Manufacturers Name -
40 Country of Origin -
FOR
1. Code Word
5. Calculated equivalent
aluminum area in sq. mm
8. Diameter of complete
conductor in mm.
a) Aluminum strand.
b) Steel strand
a) Aluminum strand.
b) Steel strand.
a) Uniformity of coating
number and/duration of dips.
b) Minimum weight of coating gm/sq. mm.
Address
Fax No. Ph. No.
Seal
b) Wet-kV
(rms
a) Positive-
kV (peak)
b) Negative-
kV (peak)
9. Withstand
voltage for the
complete string.
9.1 Power
frequency:
With and
a) Dry-kV without
(rms) corona ang.
b) Wet kV
(rms)
9.2 Lighting impulse
voltage 1.2/50
micro second.
-do-
a) Positive
kV(peak)
b) Negative
Kv(Peak)
9.3 Switching surge
voltage
250/2500 micro
second (for
400KV only)
-do-
a) Dry-kV
b) Wet kV
(rms)
10. Flashover
voltage for the
disc.
10.1 Power
frequency:
a) Dry-kV
(rms)
b) Wet kV
(rms)
10.2 Lighting impulse
voltage 1.2/50
micro second.
a) Positive
kV(peak)
b) Negative
Kv(Peak)
11. Flashover
voltage for the
complete string.
11.1 Power
frequency:
With and
a) Dry-kV without
(rms) corona ring.
b) Wet kV
FOR
ISOLATORS
iv) Radio interference voltage at 1.1 times maximum line to ground voltage
(micro volts)
v) Corona inception voltage (kV rms)
FOR
SURGE ARRESTORS
FOR
2. Service.
3. KVA Rating:-
5. Rated frequency. Hz
6. Number of phases.
7. Connections:-
a) H.V. Winding.
b) L.V. Winding.
9. Tappings:-
a) Range
b) Number of steps for high
31. CORE :-
(i) Core materials used. (grade & thickness).
(ii) Loss in watts/Kg. of core materials corres- (Watts/Kg. curve
to be
ponding to desired flux densities. furnished along
with
the bid.).
No. of steps. 1 2 3
4
Stack in mm.
HV/E.
LV/E.
HV/LV.
FOR
Surge Arrestor
2.)
3)
GENERAL PROTECTION / MONITORING EQUIPMENT
a) Trip Circuit Supervision relay.
1. Name and address of Manufacturer 1. …………….
2. Manufacturer’s type and designation 2………………
3. Whether pre-closing and post closing 3. ……………
Supervision provided?
4. Time delay. 4. ……………
4)
BUS BAR PROTECTION
1. Name and address of Manufacturer 1. …………….
2. Manufacturer’s type and designation 2………………
3. Type of relay
(Numerical) 3. ……………
4. Range: 4. …………….
(i) Voltage. (i) ……………
(ii) Current (ii) ………….
(iii) Frequency (iii) ……………
iv) Megawatt (iv) …………….
v) Megavar (v) ……………..
5. Accuracy class. 5. ……………….
6. Total deflection angle 6. ………………
7. Overall dimensions in mm. 7. ………………
8. Burden 8. …………….
(i) Current coil (i) ……………
(ii) Voltage coil. (ii) …………..
9. Digital type 9...............
a) Recording Meter for voltage
1. Name and address of Manufacturer 1. …………….
2. Manufacturer’s type and designation 2………………
3. Accuracy class. 3. ……………
4. Full span response time 4. …………..
5. Is it strip type recorder/ digital type 5. ……………
6. If it is digital type 6……………
i) No of channels beings used. I) ………………..
ii) Whether time tagged information is available ii) ……………..
iii) Whether EMNC./EMI compatibility is tested iii) …………….
b) Recording Meter for Current
1. Name and address of Manufacturer 1. …………….
2. Manufacturer’s type and designation 2………………
3. Accuracy class. 3. ……………
4. Full span response time 4. …………..
5. Is it strip type recorder/ digital type 5. ……………
6) OTHERS:
a) Terminal Block
1. Name and address of Manufacturer 1. …………….
2. Manufacturer’s type and designation 2………………
3. Rated current. 3. ……………
4. Rated voltage. 4. ……………
5. Minimum no. of conductors of area 5.
2.5mm² suitable for connection.
(i) All circuits except CT./P.TCircuits.
(i)……………
(ii) C.T. Circuits. (ii) ………….
b) Switches.
i) Control Switches.
1. Name and address of Manufacturer 1. …………….
2. Manufacturer’s type and designation 2………………
3. No.of contacts. 3. ……………
4. Type of handle. 4. ……………..
5. Rating of handle. 5. …………….
6. Rating of contacts. 6. ……….. …….
a) Make and carry continuously. a) …………..
b) Make & carry for 0.5 sec. b) …………….
Bidders Signature:
b) Accessories
b)………………………………………….
B. Conduits & Accessories B.
(For each type & size)
1. Manufacturer’s Name and address 1. …………………………………………
2. Manufacturer’s type, designation 2. ………………………………………….
3. Applicable standard 3. …………………………………………
C. Junction Boxes C
(For each type & size)
1. Manufacturer’s Name and address 1. …………………………………………
3. Type of enclosure 3. …………………………………………
2. Type 2.
…………………………………………
3. Degree of Protection 3.
…………………………………………
E. Lighting Transformer E.
1. Manufacturer’s Name and address 1. …………………………………………
2. Type 2.
…………………………………………
3. Rating (KVA) 3.
…………………………………………
4. Standards Applicable 4.
…………………………………………
5. Degree of protection for enclosure 5. …………………………………………
F. Lighting Ploes
1. Manufacturer’s Name and address 1. …………………………………………
2. Type 2.
………………………………………..
3. Dimensions 3. ………………………………………..
G. Lighting Wires. G.
2. Voltage grade 2.
………………………………………..
Bidders Name:
Bidders Signature:
Bidders
Name:
Bidders
Signature:
FOR
TRANSMISSION LINE
400/220/132 KV
Insulator units
HV testing laboratory - -
Earthwire fittings
Conductor joints
Steel towers :
Design
Steel billets, etc.
Steel sections
Fabrication
Galvanising
Check assembly
Tower tests - -
Tower fittings
SCHEDULE : C
General Technical Particulars And Guarantees
(Parameters considered and guaranteed by the Bidder for the purpose of
this Contract. The data filled in shall form the part of the Contract,
in case of Award and shall be binding on the Contractor )
C. 1 - Span Lengths
(To be filled up by the Bidder )
Normal span m
Wind spans:
Suspension towers m
Tension towers m
Suspension towers m
Tension towers m
Suspension towers m
Unit
Complete line conductor:
IEC STANDARD No
INDIAN STANDARD No
Material of conductor
Unit
Vibration damping system:
(After placement of order, the Contractor has to carry-out vibration analysis and furnish a
detailed vibration damper placement chart, as has been specified at Clause No. 2.3.14, for the
approval of the Project Manager. )
Unit
Complete line conductor:
IEC STANDARD No
INDIAN STANDARD No
Material of conductor
Unit
Vibration damping system:
(After placement of order, the Contractor has to carry-out vibration analysis and furnish a
detailed vibration damper placement chart, as has been specified at Clause No. 2.3.14, for the
approval of the Project Manager. )
IEC STANDARD No
INDIAN STANDARD No
Material of conductor
Unit
Vibration damping system and Spacing system:
(After placement of order, the Contractor has to carry-out vibration analysis and furnish a
detailed vibration damper placement chart, as has been specified at Clause No. 2.3.14, for the
approval of the Project Manager. Also ,for spacer and spacer damper the Contractor shall
furnish placement chart, for the approval of the Project Manger, as per the Clause No. 2.4.3.2
and 2.5.20 respectively. )
Unit GSW
Complete earth conductor:
Material of conductor
Lay length mm
Direction of the lay of the outer layer
Chemical composition of the steel wire
Carbon %
Manganese
Phosphorous
Sulphur
Silicon
Purity of Zinc for galvanising
Unit GSW
(After placement of order, the Contractor has to carry-out vibration analysis and furnish a
detailed vibration damper placement chart, as has been specified at Clause No. 3.3 , for the
approval of the Project Manager. )
Unit GSW
Complete earth conductor:
Material of conductor
Lay length mm
Carbon
Manganese
Phosphorous
Sulphur
Silicon
Diameter mm
Minimum breaking load of one strand kN
Galvanising
Unit GSW
(After placement of order, the Contractor has to carry-out vibration analysis and furnish a
detailed vibration damper placement chart, as has been specified at Clause No. 3.3 , for the
approval of the Project Manager.)
Suspension Clamps
Total drop mm
Breaking load kN
Slipping strength kN
Tightening torque kN
Galvanising
Tension Clamps
Galvanising :
Slipping strength kN
Galvanising :
a) Minimum weight of Zinc coating per gms./sq.m
Sq.m. of uncoated surface
Slipping strength kN
Slipping strength kN
a) Inner diameter
b) Outer diameter
a) Corner to corner
b) Surface to surface
a) Before compression
b) After compression
a) Inner diameter
b) Outer diameter
a) Corner to corner
b) Surface to surface
a) Before compression
b) After compression
b) Outer diameter
a) Corner to corner
b) Surface to surface
a) Before compression
b) After compression
Left Right
Weight of each damper mass kgs
Resonance frequencies
1) First frequency Hz
2) Second frequency Hz
Material of :
1) Damper mass
2) Messenger cable
Left Right
Weight of each damper mass kgs
Resonance frequencies
1) First frequency Hz
2) Second frequency Hz
Material of :
1) Damper mass
2) Messenger cable
Left Right
Weight of each damper mass kgs
Resonance frequencies
1) First frequency Hz
2) Second frequency Hz
Material of :
1) Damper mass
2) Messenger cable
Left Right
Weight of each damper mass kgs
Resonance frequencies
1) First frequency Hz
2) Second frequency Hz
Material of :
1) Damper mass
2) Messenger cable
Left Right
Weight of each damper mass kgs
Resonance frequencies
1) First frequency Hz
2) Second frequency Hz
Material of :
1) Damper mass
2) Messenger cable
1) Insert
2) Main body
2) Main body
Elatomer
1) Supplier
2) Type
4) Shore hardness
2) Tensile load kN
Unit
2) Main body
2) Main body
Elatomer
1) Supplier
2) Type
4) Shore hardness
2) Tensile load kN
2) Main body
4) Damping ball
1) Insert
2) Main body
4) Damping ball
Elatomer
1) Supplier
2) Type
4) Shore hardness
1) Compressive load kN
2) Tensile load kN
Unit
1) Dry kV
2) Wet kV
1) Dry kV
2) Wet kV
1) Positive
2) Negative
1) Positive
2) Negative
2) Ball pin
1) As per pointer A mm
2) As per pointer B mm
3) weather shed
Core material
Shed material
1) Dry kV
2) Wet kV
1) Dry kV
2) Wet kV
1) Positive
2) Negative
1) Positive
2) Negative
2) Ball pin
Note : Any other parameters which Bidder feels are necessary to define the offered composite
insulator unit, shall be indicated and guaranteed in the above format.
1) Dry kV
2) Wet kV
1) Dry kV
2) Wet kV
1) Positive
2) Negative
1) Positive
2) Negative
2) Ball pin
1) As per pointer A mm
2) As per pointer B mm
3) weather shed
Core material
Shed material
1) Dry kV
2) Wet kV
1) Dry kV
2) Wet kV
1) Positive
2) Negative
1) Positive
2) Negative
2) Ball pin
Note : Any other parameters which Bidder feels are necessary to define the offered composite
insulator unit, shall be indicated and guaranteed in the above format.
1) Positive kV
2) Negative kV
1) Positive kV
2) Negative kV
6) Tolerance in
Particular of Elastomer
(for AGS clamps only )
1) Supplier of elastomer
2) Type of elastomer
1) Positive kV
2) Negative kV
1) Positive kV
2) Negative kV
1) Positive kV
2) Negative kV
1) Positive kV
2) Negative kV
6) Tolerance in
Particular of Elastomer
(for AGS clamps only )
1) Supplier of elastomer
2) Type of elastomer
1) Positive kV
2) Negative kV
1) Positive kV
2) Negative kV
1) Positive kV
2) Negative kV
1) Positive kV
2) Negative kV
1) Positive kV
2) Negative kV
6) Tolerance in
Particular of Elastomer
(for AGS clamps only )
1) Supplier of elastomer
2) Type of elastomer
1) Positive kV
2) Negative kV
1) Positive kV
2) Negative kV
1) Positive kV
2) Negative kV
Maximum tension per phase, for purposes of tower design and application
Unit
Maximum tension per phase, for purposes of tower design and application
Unit
Unit
: at mid-span m
Actual m
Actual m
: at mid-span m
Actual m
Actual m
: at mid-span m
Actual m
Actual m
Unit
Assumed density of Plain Cement Concrete (PCC) for foundation in dry kg/m3
soil
Particulars Unit
Towers: Mild steel High tensile steel
Steel Steel nuts Steel Steel nuts
members and bolts members and bolts
Grade/standard
Diameter of specimen mm
Grade/standard
Elongation on breaking %
Diameter of specimen mm