lever arm
Selfweight of pier 776.25 7.35
self weightof base slab 735 7.35
Total weight 1511.25
water pressure
Verticlaloads on pier
Moment
5705.438
5402.25
11107.69
961.38
560.805
7419.45
490.5
204.375
5299.607
961.38
1682.415
2512.046
2431.013
324.135
972.405
3241.35
9480.949
110.25
294
1470
2940 Irc 5,6
760
367.5
95
2.7
9.5
6 6
2.0
14.7
HYDRODYNAMIC
J PRESSURE DIAGRAM TABLE
C1 C1*H C2 C2*Pb C3 C3*F C4 C4*H
0 0 0 0 0 0 0 0
0.1 0.7 0.41 18 0.026 7 0.934 7
0.2 1.4 0.673 30 0.093 24 0.871 6
0.3 2.1 0.832 37 0.184 48 0.81 6
0.4 2.8 0.922 41 0.289 75 0.751 5
0.5 3.5 0.97 43 0.403 105 0.694 5
0.6 4.2 0.99 44 0.521 136 0.639 4
0.8 5.6 0.999 45 0.76 198 0.532 4
1 7.0 1 45 1 261 0.428 3.0
HYDRODYNAMIC PRESSURE
0 10 20 30 40 50
0
C3F*C4H
0
1
44
148
2 272
396
3 511
608
HEIGHT
4 738
HYDRODYNAMIC 782
PRESSURE
5
C2*Pb
Load Moment
vertical horizontal Resisting
Self weight of pier 1511.25 11107.6875
Weight of water at frl 412.02
uplift pressure -1009.449
breaking force 80 760
Water presuure 240.345
Breaking force of gantry 90
Weignht from superstructre 1289.925 9480.94875
sum 2203.746 410.345 21348.63625
B 14.7
B/6 2.45
∑M 12701.2
∑V 2203.746
X=B21/B22 5.763457
B/2-X 1.586543
P 52.83467 allowable 0 OK
P 246.9947 380 OK
ter is upto mddl
Moment
overturning
1522.185
7419.45015
560.805
-855
8647.44015
149.8639
( IS 14458 part 2 )
( IS 14458 part 2 )
Design of heel slab
Ht of pier 9.5
Thickness of pier 1000
clear cover 75
dia of bar 25
effective depth 912.5
Factored moment 3263
R=Mu/bd^2 3.918
Pt REQUIRED 0.02 Pt=(𝐹𝑐𝑘¦(2×𝐹𝑦))
Ast Required 151 (1−√1−4.598×𝑅/𝐹𝑐𝑘)
SHEAR CHECK
Z 8.5875
Vu 480.2
NOMINAL SHEAR FORCE τv=Vu/bd 0.526247
τc FROM IS 456 TABLE 19 0.625
Ast required 5703.125
No. of bars 11.6242
Spacing of bars 86.0274
6
50
247
197
50
53
3
INTERPOLATION
Pt τc
Y1 1.00 X1 0.62
Y2 0.3 X2 0.480
Y3 1.25 X3 0.67