Академический Документы
Профессиональный Документы
Культура Документы
A1,A2 B1,B2
NAME
Page 1 of 16
THERMAX LIMITED (Boiler And Heater Group)
FORMAT NO: F-CEC-9.50, Rev-0
DATE
Page 2 of 16
THERMAX LIMITED (Boiler And Heater Group)
FORMAT NO: F-CEC-9.50, Rev-0
PROTOCOL FOR DRUM ALIGNMENT
A1,A2 B1,B2
NAME
Page 3 of 16
THERMAX LIMITED (Boiler And Heater Group)
FORMAT NO: F-CEC-9.50, Rev-0
DATE
Page 4 of 16
THERMAX LIMITED
SEZ, MUNDRA
DIMENSIONAL PROTOCOL
HP STEAM DRUM
AS PER DRG
19600
ACTUAL (-3)
LH SIDE ELEVATION
AS PER DRG
19600
ACTUAL (-4)
RH SIDE ELEVATION
Drum CL
REAR SIDE
A1 B1,B2 B1
B1
A1-B1 = -2
FRONT SIDE RH SIDE
ROTATION
Drum CL
REAR SIDE
B2 B1,B2 A2
A1
A2-B2 = -2
REAR SIDE ROTATION LH SIDE
ACTUAL
(-2)
ACTUAL
(-2)
B2
B1-B2 =-1
A2
A1-A2 = -1
INSPECTION AGENCY
THERMAX LIMITED
SEZ, MUNDRA
DIMENSIONAL PROTOCOL
MP STEAM DRUM
AS PER DRG
19000
ACTUAL (-2)
LH SIDE ELEVATION
AS PER DRG
19000
ACTUAL (0)
RH SIDE ELEVATION
Drum CL
REAR SIDE
A1 B1,B2 B1,
B1
A1-B1 = -1
FRONT SIDE RH SIDE
Drum CL
REAR SIDE
B2 B1,B2 A2
A1
A2-B2 = -1
REAR SIDE LH SIDE
ACTUAL
(-1)
ACTUAL
(-2)
B2
B1-B2 =-2
A2
A1-A2 = -1
INSPECTION AGENCY
THERMAX LIMITED
SEZ, MUNDRA
DIMENSIONAL PROTOCOL
AS PER DRG
2401 2402 2400 mm
TB6 (COLUMN)
All dimensions are in mm
FOR THERMAX LTD FOR INSPECTION AGENCY
SIGN
NAME
DATE
22-03-2019
D21-1WH-145484 REV.0
S PER DRG
INSPECTION AGENCY