THERMAX LIMITED (Boiler And Heater Group)

FORMAT NO: F-CEC-9.50, Rev-0


PROTOCOL FOR DRUM ALIGNMENT

BOILER No : LWL 1222 CUSTOMER: DORC


JOB NO : QL1222 QAP No : ITP-FGSG-DAN-01/ REV: 2
REPORT NO : HP/MP/001 DATE : 22-03-2019
WBS NO : P21
Drum CL Boiler axis
LHS RHS
REAR SIDE FRONT SIDE
B1 (A1) B2 (A2)

A1,A2 B1,B2

LHS VIEW FRONT VIEW


AS PER DRG. /
SR. NO. CHARACTERISTIC CHECK ACTUAL REMARKS
SPECIFIED

IDENTIFICATION FOUND OK AS PER


1 AS PER DRG.
(Steam drum / Water drum) DRG

ORIENTATION (Applicable FOUND OK AS PER


2 AS PER DRG.
DRG
for Steam Drum)
1.     FIXED SADDLE FOUND OK AS PER
a AS PER DRG.
DRG
LOCATION (LHS / RHS)
2.  BFW INLET LOCATION
b LH SIDE LHS SIDE
(LHS / RHS)
RISERS LOCATION (LHS /
c RH SIDE RH SIDE
RHS)
ROCKER WASHER (As
d
applicable)
DISTANCES FROM BLR. FOUND OK AS PER
3 AXIS (mm)
AS PER DRG.
DRG

DISTANCES FROM DRUM FOUND OK AS PER


4 CENTER LINE OR REF. AXIS AS PER DRG.
ANNEXURE-3
(Specify) (mm)
FOUND OK AS PER
5 ELEVATION (mm) AS PER DRG.
ANNEXURE-1
FOUND OK AS PER
6 ROTATION AS PER DRG.
ANNEXURE-1
WATER LEVEL @ A1 – B1 FOUND OK AS PER
a (LHS) (mm)
AS PER DRG.
ANNEXURE-1
WATER LEVEL @ A2 – B2 FOUND OK AS PER
b (RHS) (mm)
AS PER DRG.
ANNEXURE-1
WATER LEVEL @ A1 – A2 FOUND OK AS PER
c (RHS-LHS) (mm)
AS PER DRG.
ANNEXURE-1

RESULT : SATISFACTORY / NOT SATISFACTORY

VENDOR THERMAX CUSTOMER


SIGN

NAME

Page 1 of 16
THERMAX LIMITED (Boiler And Heater Group)
FORMAT NO: F-CEC-9.50, Rev-0
DATE

Page 2 of 16
THERMAX LIMITED (Boiler And Heater Group)
FORMAT NO: F-CEC-9.50, Rev-0
PROTOCOL FOR DRUM ALIGNMENT

BOILER No : LWL 1222 CUSTOMER: DORC


JOB NO N : QL1222 QAP No : ITP-FGSG-DAN-01/ REV: 2
REPORT NO : HP/MP/001 DATE : 22-03-2019
WBS NO : P26
Drum CL Boiler axis
LHS RHS
REAR SIDE FRONT SIDE
B1 (A1) B2 (A2)

A1,A2 B1,B2

LHS VIEW FRONT VIEW


AS PER DRG. /
SR. NO. CHARACTERISTIC CHECK ACTUAL REMARKS
SPECIFIED

IDENTIFICATION FOUND OK AS PER


1 AS PER DRG.
(Steam drum / Water drum) DRG

ORIENTATION (Applicable FOUND OK AS PER


2 AS PER DRG.
DRG
for Steam Drum)
1.     FIXED SADDLE FOUND OK AS PER
a AS PER DRG.
DRG
LOCATION (LHS / RHS)
2.  BFW INLET LOCATION
b LH SIDE LHS SIDE
(LHS / RHS)
RISERS LOCATION (LHS /
c RH SIDE RH SIDE
RHS)
ROCKER WASHER (As
d
applicable)
DISTANCES FROM BLR. FOUND OK AS PER
3 AXIS (mm)
AS PER DRG.
DRG

DISTANCES FROM DRUM FOUND OK AS PER


4 CENTER LINE OR REF. AXIS AS PER DRG.
ANNEXURE-3
(Specify) (mm)
FOUND OK AS PER
5 ELEVATION (mm) AS PER DRG.
ANNEXURE-2
FOUND OK AS PER
6 ROTATION AS PER DRG.
ANNEXURE-2
WATER LEVEL @ A1 – B1 FOUND OK AS PER
a (LHS) (mm)
AS PER DRG.
ANNEXURE-2
WATER LEVEL @ A2 – B2 FOUND OK AS PER
b (RHS) (mm)
AS PER DRG.
ANNEXURE-2
WATER LEVEL @ A1 – A2 FOUND OK AS PER
c (RHS-LHS) (mm)
AS PER DRG.
ANNEXURE-2

RESULT : SATISFACTORY / NOT SATISFACTORY

VENDOR THERMAX CUSTOMER


SIGN

NAME

Page 3 of 16
THERMAX LIMITED (Boiler And Heater Group)
FORMAT NO: F-CEC-9.50, Rev-0
DATE

Page 4 of 16
THERMAX LIMITED
SEZ, MUNDRA

DIMENSIONAL PROTOCOL

PROJECT : FLUE GAS STEAM GENERATOR DATE :- 22-03-2019


CONSULTANT : ENGINEERS INDIA LIMITED DRG NO: P21-1WH-151112 REV.0
CLIENT : DANGOTE OIL REFINERY P21-2WH-095364 REV
DESCRIPTION : ALIGNMENT OF HP STEAM DRUM D21-1WH-145484 REV.
UNIT NO. /BOILER NO.:- LWL 1222
ANNEXURE - 1

HP STEAM DRUM

AS PER DRG
19600

ACTUAL (-3)

LH SIDE ELEVATION

AS PER DRG
19600

ACTUAL (-4)

RH SIDE ELEVATION

Drum CL

REAR SIDE

A1 B1,B2 B1
B1

A1-B1 = -2
FRONT SIDE RH SIDE
ROTATION
Drum CL

REAR SIDE

B2 B1,B2 A2
A1

A2-B2 = -2
REAR SIDE ROTATION LH SIDE

All dimensions are in mm


FOR THERMAX LTD FOR INSPECTION AGENCY
SIGN
NAME
DATE
22-03-2019
P21-1WH-151112 REV.02
P21-2WH-095364 REV.0
D21-1WH-145484 REV.0

ACTUAL
(-2)

ACTUAL
(-2)

B2

B1-B2 =-1
A2

A1-A2 = -1

INSPECTION AGENCY
THERMAX LIMITED
SEZ, MUNDRA

DIMENSIONAL PROTOCOL

PROJECT : FLUE GAS STEAM GENERATOR DATE :- 22-03-2019


CONSULTANT : ENGINEERS INDIA LIMITED DRG NO: P26-1WH-151080 REV
CLIENT : DANGOTE OIL REFINERY P26-2WH-095510 REV
DESCRIPTION : ALIGNMENT OF MP STEAM DRUM D21-1WH-145484 REV
UNIT NO. /BOILER NO.:- LWL 1222
ANNEXURE - 2

MP STEAM DRUM

AS PER DRG
19000

ACTUAL (-2)

LH SIDE ELEVATION

AS PER DRG
19000

ACTUAL (0)

RH SIDE ELEVATION

Drum CL

REAR SIDE

A1 B1,B2 B1,
B1

A1-B1 = -1
FRONT SIDE RH SIDE
Drum CL

REAR SIDE

B2 B1,B2 A2
A1

A2-B2 = -1
REAR SIDE LH SIDE

All dimensions are in mm


FOR THERMAX LTD FOR INSPECTION AGENCY
SIGN
NAME
DATE
22-03-2019
: P26-1WH-151080 REV.1
P26-2WH-095510 REV.0
D21-1WH-145484 REV.0

ACTUAL
(-1)

ACTUAL
(-2)

B2

B1-B2 =-2
A2

A1-A2 = -1

INSPECTION AGENCY
THERMAX LIMITED
SEZ, MUNDRA

DIMENSIONAL PROTOCOL

PROJECT : FLUE GAS STEAM GENERATOR


CONSULTANT : ENGINEERS INDIA LIMITED
CLIENT : DANGOTE OIL REFINERY DATE :- 22-03-2019
DESCRIPTION : ALIGNMENT OF HP & MP STEAM DRUM DRG NO: D21-1WH-145484 REV
UNIT NO. /BOILER NO.:- LWL 1222
ANNEXURE - 3

HP STEAM DRUM TOP VIEW

AS PER DRG
2401 2402 2400 mm

TB5 (COLUMN) TB4 (COLUMN)

MP STEAM DRUM TOP VIEW

(0) AS PER DRG


2400 mm
2401 2400

TB6 (COLUMN)
All dimensions are in mm
FOR THERMAX LTD FOR INSPECTION AGENCY
SIGN
NAME
DATE
22-03-2019
D21-1WH-145484 REV.0

S PER DRG
INSPECTION AGENCY