GNPOWER DINGININ LTD. CO.

CONSTRUCTION
GNPD 03 00 1 MCP 50XXX 0
MANAGEMENT

Mechanical Completion (Final Inspection) Punchlist

System Title: Auxiliary Electrical Power System System Number: 00-D-1004


Sub-system Title: 460V Ash Handing Power System Sub-system Number: 00-D-1004-008
Drawing GNPD-03-0D-2-BAU-S-0411-02-0 1
Unit:
Number: FA11851S-DO411-02
FI&TR Number: Date: July 30, 2019

P&ID Number:

(Strikethrough if not
applicable)
System Walk Down Inspection System WTP Inspection

Defect Category
Item Initiated
Discip Equipment Description P/L
No. By Comm
Initiator

Ground
Cable @
ECI MJN
1 Ash 09175616113
C A
System 09338571266
MCC

- Exposed grounding cable


All copper strand should be concealed laying, normally
embedded between concrete slab and secondary
poured concrete, or inside main concrete slab.
Safety hazard (tripping)
Defect Category Description: Discipline :
A - Must be corrected before system commissioning
B - Must be corrected before automated operation B = Boiler; T = Turbine; C = Civil; ECI = Electrical / Control
C - Must be corrected before performance/reliability test & Instrumentation; BoP = Balance of Plant
D - Must be corrected before commercial operation date
Mechanical Completion (Final Inspection) Punchlist Acceptance
GNPD Engineering GNPD Construction GNPD Quality GNPD Commissioning
Name:
Position:

Signature:

Date:

GNPD 03 00 1 TEM 50130 0 - Effective Date 2019.02.15 Page 1 of 1