Installation Material Telkomsel Project

2015

Bagus.wickradytha@nsn.com
Ghufron.alhuda@nsn.com

1 12/08/2017 © Nokia 2014


Confidential
Installation Material advance training
1. All type of Installation material : 2. Content per item Kitting
- TI Kitting / TI Box 3. Description and usage per item
- Lose item 4. BoQ instmat per site or scope
- New site
• Hybrid Cable
- Expansion
• Cable power
• Clamp - Swap
• Bracket - 2nd and 3rd Carrier
• Antenna - Collocated
• Jumper
• MCB
• RG45
• CAT5/CAT6

2 12/08/2017 © Nokia 2014


Confidential
EQUIPMENT

FAN/ Status
TX Module
OPT 1 OPT 2 OPT 3

3 12/08/2017 © Nokia 2014


Confidential
System Module

ESMC, FSME, FSMF

4 12/08/2017 © Nokia 2014


Confidential
RF Module

FXDB, FXEB, FRGP, FRGT

FAN/ Status
TX Module

OPT 1 OPT 2 OPT 3

5 12/08/2017 © Nokia 2014


Confidential
Transport Module
Module name Interfaces Availability Remarks

FTPB 8xE1/T1/JT1 RAS05.1 120/110/100 Ω, RJ48c

FTEB 8xE1 coaxial RAS05.1 75 Ω, SMB

FTOA 1xSTM1/OC3 RAS05.1 ED 1xSFP, LC equipped

FTFA 2xFlexbus RAS05.1 TNC

4xE1/T1/JT1 RAS05.1 Optional Gigabit


FTIA Ethernet interface
2xFast Ethernet, Ethernet supported in
(SFP)
1xGE RAS06 RJ48C, RJ45, SFP (LC)

4xE1 coaxial Optional Gigabit


FTJA RAS06 Ethernet interface
2xFast Ethernet, (SFP)
1xGE SMB, RJ45, SFP (LC)

6 12/08/2017 © Nokia 2014


Confidential
FMR Accessories
Kabel entry gland

Gelang antistatik
Plinth (Wristrap)

Kabel grounding

Cover
Casing
Tali Hanger utk cover
7 12/08/2017 © Nokia 2014
Confidential
LOCAL MATERIAL

Hybrid Cable

Mounting Bracket

Loose Item

TI Box
Antenna system

8 12/08/2017 © Nokia 2014


Confidential
Mounting Bracket

9 12/08/2017 © Nokia 2014


Confidential
Sample of Photos

10 12/08/2017 © Nokia 2014


Confidential

Presentation / Author / Date


Loose Item

11 12/08/2017 © Nokia 2014


Confidential
Hybrid Cable
Ganti jadi : Table penggunaan hybrid berdasarkan tinggi antenna dan band

12 12/08/2017 © Nokia 2014


Confidential
BTS KITTING – TI BOX (1)

Ada 33 BTS Kitting (versi 11.8_June 2014) yang masih valid untuk keseluruhan project di Nokia

13 12/08/2017 © Nokia 2014


Confidential
BTS KITTING – TI BOX (2)
Kitting yang digunakan di
Telkomsel Project

1. Label
2. FMR Basic
3. DDF
4. Waterproofing

14 12/08/2017 © Nokia 2014


Confidential
BOQ per scope

15 12/08/2017 © Nokia 2014


Confidential
Receiving Material On Site Process

Yes Yes

No No

16 12/08/2017 © Nokia 2014


Confidential
Dispatch Note

17 12/08/2017 © Nokia 2014


Confidential
RIGGING / LIFTING METHOD

18 12/08/2017 © Nokia 2014


Public
Pulley system

Pulley system Type N

Pulley system Type A

Pulley system Type W

19 12/08/2017 © Nokia 2014


Confidential
Rigging /Lifting Method
Telkomsel / H3I Indosat SF Proposed
Max weight : 30 kg (once lift), Max weight : 300 kg (once lift) Max weight : 75 kg (once lift)
drawn by the power of people drawn by electrical winch drawn by the power of people

Type A Type A

N M W N M W N M W
20 12/08/2017 © Nokia 2014
Confidential
Backup slide Buku Panduan Instalasi MW (page 10)

TI Handbook (page 41)

21 12/08/2017 © Nokia 2014


Confidential
Indosat Rigging Tools

22 12/08/2017 © Nokia 2014


Confidential
No. Tools Accessories per Team Quantity Unit
1 ROPE NYLON KERNMANTLE D.12MM 300 Mtr
SF Rigging tools proposal 2 Mini Gin Pole 1 Pcs
3 Tire Tube 2nd/ ban dalam truk bekas 4 Pcs
4 Wheel Fence / Roda Pintu Pagar min 3 inch 4 Pcs
5 Carabiner steel WLL min 2500 kg 10 Pcs
Screw Pin Anchor Shackles 16mm, Load Rated,
6 10 Pcs
min 2000 kg
7 Webbing 2,8 - 4 cm , with WLL min 2000kg (Beal) 50 Mtr
8 Webbing Sling Green 4 mtr, WLL 2000 kg 4 Pcs
Pulley for ropes D 11.5 -13mm MBS min 3600kg
9 5 Set
(Petzl, Camp, Protecta)
Walky talky with min talk time 8 hours (1 set = 2
10 Set
pcs) 1
Rope Nylon 18 mm @ 200 mtr + pulley for rope 18
11 Pcs
mm 1
12 Turnbuckles 16 mm 4 Pcs
Scaffolding (applied for Rectifier and battery
13 Mtr
installation) 3
14 Timbel / kausen 12 mm 1 Pc
15 Fluorescent Vest (optional) 4 Pcs
16 Tool Bag 2 Pcs
17 Rope Grab with absorber (applied for Monopole) 2 Pcs
Ascender Right and Left for ropes D 11.5 mm - 13
18 Pair
mm' (manual break system) 1
19 Safety Net 10m x 5m 1 Pcs
23 12/08/2017 © Nokia 2014 20 Working Seat Harness 1 Pcs
Confidential
Picture of tools

24 12/08/2017 © Nokia 2014


Confidential
IMPORTANT MESSAGE
SDR Creation
1. WPID, site ID, site name, dan PO customer harus terisi dengan benar sesuai dengan
site yang akan di install
2. Material yang di request harus sesuai dengan kebutuhan actual di site

Receiving Material
1. Selalu cek jenis dan jumlah material sesuai dengan DN
2. Selalu cek kondisi packing dan isi material sebelum mover meninggalkan lokasi
3. Laporkan kepada PE Nokia apabila ditemukan kondisi packing dan atau isi yang
rusak

Installation
1. Selalu gunakan APD yang sesuai
2. Pastikan lifting material ke atas tower dengan benar
3. Lakukan self assessment (SA) sesegera mungkin setelah pekerjaan selesai sebelum
meninggalkan lokasi
25 12/08/2017 © Nokia 2014
Confidential
Pertanyaan
1. Sebutkan apa saja main kitting untuk Telkomsel project?
2. Hybrid cable type apa yang digunakan untuk implementasi DCS 8/8/8 dengan tinggi antenna 72 meter?
3. Jelaskan apa itu Hybrid cable type 3+1 55 meter?
4. Sebutkan System dan RF Module untuk U900
5. Bracket type apa yang digunakan untuk DCS collocated dengan tinggi antenna 52 meter pada tower 72 meter?
6. Buatkan breakdown BOQ untuk GSM dengan 2 RF Module config 8/8/8
7. Sebutkan jumlah RF module yang bisa diimplementasikan dengan Hybrid cable 4+2 115 meter
8. Berapa jumlah UFMB yang diperlukan untuk instalasi 1 FXDA dan 1 FXEB
9. Sdr vs actual
10. Apa yg dilakukan apabila ada kekurangan
11. Streaping elektrostatik
12. Apa yang dilakukan setelah instalasi
13. Apa yang dilakuakn ketika menemukan packing material rusak sedangkan material di dalamnya dalam kondisi
normal
14. Berapa lama equipment dari commspare dikembalikan setelah replacement
15. Boleh kan FXDA dikembalikan dengan FXDB
16. Apa pertimbangan dalam pemilihan tipe antenna dalam implementasi?
17. SA untuk modernisasi dilakukan setelah instalasi atau setelah dismantle?
18. Kapan penggunan jjumper 10 meter pada tower 72
19. Bolehkan membawa RF module dengan di panggul pada pada pemasangan di minitower 6 meter
20. Dalam implementasi new site diperlukan kompenen instalasi berikut, Antenna, Hybrid, Kitting, Bracket, Equipment,
26
dan ….
12/08/2017 © Nokia 2014
Confidential
Thank You