Вы находитесь на странице: 1из 2

Sandip University

School of Engineering and Technology, NASHIK


DEPARTMENT OF CIVIL ENGINEERING

Couse- Environmental Engineering-I A.Y-2019-20


Class- TE Civil Sem-VI

Date of Assignment: 27/1/2020

Home Assignment No:1 [CIA-I]

Type of Assignment (Methodology): -question answer based

1. Explain necessity of water supply scheme?


2. Define water demand and its types in detail.
3. Define i) Design Period ii) Population forecasting
4. State and Explain various factors affecting on water demand.
5. Enlist the sources of water.
6. Define Intake. State and Explain factors affecting on location of Intake Structures.
7. Enlist the types of Intakes. Explain Reservoir and Canal Intake.
8. Enlist the methods of Population Forecasting. Solve the following Example by using
i) Arithmetical Increase Method
ii) Geometrical Increase Method
iii) Incremental Increase Method
iv) Simple Graphical Method [Solve on Graph Paper Only].
The population of town as obtained from the census data is as follows:

Year Population
1970 79540
1960 71320
1950 63710
1940 55460
1930 46520
1920 37640
1910 13751
1900 21610

9. Explain with sketch i) Canal Intake ii)Lake Intake


10. State and Explain factors affecting growth of Population.
11. The census record of a city shows population as follow. Calculate the population for year
2000,2010, 2020 by arithmetical increase, Geometrical increase & Incremental increase
method.
Year Population
1901 24831
1911 25293
1921 25423
1931 27263
1941 38284
1951 49909
1961 67105
12. Explain factors affecting on Design period.

*Date of Submission – 8/2/2020.

Note- Roll Nos-1 to 27 – Solve Even questions


Roll Nos-27 onwards – Solve odd questions

Вам также может понравиться