General Information
12MW Diesel Power Plant constructed and installed in March 1998, of which capacity is
6,200kW each genset.
The operation hour since installation is 49,081 hours for No.1 generator and 14,761 hours for
No.2 (Standby) generator. The plant was recently stopped and ready for dismantling and
relocation.
A. Major Equipment
1. Engine : Niigata 18V32CLX (2 sets), Japan
- 4 Stroke, 600 rpm, 8738 PS, 63.5 ton
- March 1998
2. Generator: Toshiba TAKL SC (2 sets)
- rated output continuous: 6,200 kW (may need correction after relocation)
- 7750kVA, 6600V, 678A, 60Hz, 23 ton
- Power factor 0.8, Field current 549A
- Insulation type: F
- April 1998
3. Fuel oil consumption: 193 g/kWh
at - ISO conditions
- LCV 10,200 kcal/kg
- ± 5% tolerance
4. Lube oil consumption: 7.9 – 10.5 kg/h (about 208 – 277 ltr/24h) at 100% load and
± 10% tolerance
6. Electrical Equipment
a. Common control panel
b. No.1 generator control panel
c. No.2 generator control panel
d. No.3 generator control panel (installed for future extension)
e. Incoming unit panel
f. Common Aux. MCC and control panel
g. Common Aux. MCC and control panel
h. Aux. transformer 6600V / 440V & 254V, 1500kVA