Problem
Solution
Considering the above, an impermeable lining of the pond is the ideal
solution. The side slopes of the pond was dressed in a stable
inclination of 1V: 1H with a horizontal beam in between . The slope
as well as bed of the pond was lined with a geosynthetic solution.
1mm thick geomembrane Macline (SDH) will act as hard core Before Installation
impearmeable liner. This macline was lined on a protective layer of
non woven Geotextile.(Mactex) To ensure the stability of liners, safe
anchoring was done at the top by providing anchor trenches.
Advantages :
a. Easy handling and installation
b. b. Quality assurance and uniformity
c. c. Cost effective
During Installation
Client name:
M/S SHIVALAYA FARMS
Main contractor name:
MACCAFERRI
Consultant:
MACCAFERRI
Product used:
MACLINE SHE 1.0 HDPE GEOMEMBRANE: 14960 SQM
MACTEX N 40.1 NON WOVEN GEOTEXTILE—14214.04 SQM
Construction info
Construction date: APRIL 2011
Design date: MARCH 2011
After Installation
Before Installation
After construction
During Installation
Date: Feb 2001
During Installation
After Completion
Dat
After Completion
The installation procedures of Geosynthetics is completed and the structure is serving its purpose due to its good seepage control
properties, environmental balance and aesthetics. The technique and the mechanism both are appreciated by the concerned
people.