Abstract— This paper presents fault diagnosis and During the operation of tap changer, series of
trouble shooting method of an on load tap changer mechanical and electrical events produce distinctive
(OLTC) of 100 MVA transformer, at 220/110 kV vibration and noise patterns. Since all electric
Receiving Station, Vajjarmatti, Karnataka. An on load contacts are enclosed in oil filled steel tank, an on-
tap changer (OLTC) is the most maintenance intensive
line monitoring of the OLTCs with a non-invasive
subassembly on a power transformer. Maintenance of a
transformer is essential to operate OLTC in proper acoustic technique was proposed [1] as a mean to
condition. OLTC consists of operating of voltage to a investigate the vibration signals from a tap-change
desired level as per the load demand. In this paper the process. In modern high-speed resistor tap changers,
OLTC fault has been identified and mentioned the current transfer over the electric contacts via the
troubleshooting method and maintenance of 100 MVA transition resistors in the diverter switch takes place in
transformer is given. about 40-70 ms, depending on the type of mechanism
Keywords— On Load Tap Changer, Fault detection, used. This transition time interval is expected to be
troubleshooting and Transformer Maintenance Schedule constant as long as no fault appears. Therefore, it is
possible to check the reliability of the OLTCs by
NOMENCLATURE monitoring the tap-change transition time.
Vs : Induced voltage in the secondary winding.
Vp : Induced voltage in the primary winding. The main purpose of an on load tap changer (OLTC)
Ns : Number of turns in the secondary winding. is to modify the transformer voltage ratio in response
Np : Number of turns in the primary winding. to voltage variations in the electrical system, while
Is : Current flowing through the secondary winding. maintaining the transformer’s output voltage. The
Ip : Current flowing through the primary winding. OLTC changes the tapping connection of the
Es : Induced e.m.f in the secondary winding. transformer winding while the transformer is
Ep : Induced e.m.f in the primary winding. energized.
I. INTRODUCTION II. OLTC FAULT DIAGNOSIS
On-Load Tap Changers (OLTCs) are parts of the The 220kV/110kV, 100MVA Transformer at
voltage regulating system in an electrical transmission Vajjarmatti, has been commissioned during 2005. The
network. They are connected to the transformer and substation is operating with 84 MVA total
are responsible for maintaining the voltage level under transformation capacity [Two transformers: with
variable loading conditions. By changing a tapping on 2x100MVA, 220kV/110kV (BHEL)]. Transformer
the winding, the OLTC enables the turn’s ratio of the no.2 rating of 100 MVA (BHEL make) failed on 23-
transformer to vary and thus the level of output 08-2011 at 11:40 Hrs at Vajjarmatti substation.
voltage. Fig.1 shows schematic of OLTC, it OLTC has A BDM (Breakdown and Maintenance) Committee
two main components; a selector switch and a diverter has been constituted to assess the cause of failure and
switch. A selection of tapping on the transformer rate of failure of various substation equipment of
winding is done via the selector switch. Load current rating 220 kV and above voltage class and to suggest
is afterwards switched over a set of electric remedial measures so as to minimize / avert such
contacts by means of the diverter switch. The failures in future. As part of such activity, Asst.
OLTCs have high failure rates compared to other Executive Engineer and Asst. Engineer of KPTCL
electrical transmission equipments because their visited the site and the meeting was held with BDM
mechanical parts operate very frequently. Their officials and fault has been detected by operation and
failures can cause damage to the complete transformer maintenance staff.
unit. It is, therefore, important for the utilities to be
able to assure the reliability of the OLTCs. The assessment / analysis of failure of a transformer is
Consequently, an extensive maintenance is required. discussed in Table-I
However, a routine maintenance of the OLTCs is a
major expenditure, both in time and material. [1]

Presented at National Conference on Emerging Trends in Engineering and Technology (NCETET 2016):
January 25, 2016:Jointly Organized by Tontadarya College of Engineering (TCE) Gadag and AES Journals Page 570
JOURNAL OF INFORMATION, KNOWLEDGE AND RESEARCH IN
ELECTRICAL ENGINEERING (ISSN: ISSN 0975 – 6736 , GIF: 01.1419 , SIF: 02.798)
TABLE I The operation of an OLTC during the troubleshooting
ANALYSIS OF A 100MVA TRANSFORMER
is shown in fig.3
Transformer Details
Particulars IV. MAINTENANCE SCHEDULE OF TRANSFORMER
Name of Substation 220KV/110KV R/S Vajjarmatti.
Transformers will run practically trouble-free if proper
Make BHEL
Rating 100 MVA maintenance is done. An on load tap changer (OLTC)
Sr. No 2019245 is the most maintenance intensive subassembly on a
Type Auto transformer (oil-cooled) power transformer, for this purpose a maintenance
Year of commissioning 2008 schedule can be drawn. Though this schedule shall be
Date of Failure 23-06-2011 only indicative in nature and tests may be conducted at
Failed device OLTC connecting rod
Insulation level LI950/AC395(HV),
more frequent intervals depending upon the severity of
LI170/AC70(Neutral), service [2]. Such a maintenance schedule is given in
LI550/AC230(IV), LI170/AC70(LV) Table II.
% Impedance HVLV 26% ±15 Tolerance

Fig.1: Schematic wiring diagram of OLTC.

III. TROUBLESHOOTING OF OLTC OF 100MVA


TRANSFORMER
Symptom: Fluctuation in the voltage.
Fault: On load tap changer connecting rod has been
broken due to displacement of bolt and wear and tear
of nuts.
Remedy: Fig.2: Troubleshooting of OLTC broken rod of 100MVA
transformer by the BDM committee workers (left), and
On load tap changer connecting rod has been taken manually operating the tap changer (right), at 220/110kV R/S
out and replaced by new bolts and nuts, and same is Vajjarmatti, Mudhol Tq. Bagalkot.
fixed on the transformer and for proper operation of
OLTC the following steps have been conducted,
60
1. BDM committee person tested the tap changer
40
both automatically and manually.
20
2. By automatic method or remote control the gear
rotates 33 revolutions for each tap change. 0

3. The same has been tested by the manually, the 1 2 3 4 5 6 7


tap changer has been rotated manually for 33
revolutions and at the same time the tap must be Taps operated
changed otherwise the tap must set same for all three No. of revolutions
rods.
Operating time in sec
4. After attending the tests the tap will be set to the
proper position at the desire voltage level.

Presented at National Conference on Emerging Trends in Engineering and Technology (NCETET 2016):
January 25, 2016:Jointly Organized by Tontadarya College of Engineering (TCE) Gadag and AES Journals Page 571
JOURNAL OF INFORMATION, KNOWLEDGE AND RESEARCH IN
ELECTRICAL ENGINEERING (ISSN: ISSN 0975 – 6736 , GIF: 01.1419 , SIF: 02.798)
Fig.3: Operation of an OLTC during troubleshooting of
transformer

TABLE II
MAINTENANCE SCHEDULE FOR 100 MVA TRANSFORMER [3]
Inspecting
Items to be inspected Remarks
Frequency
Ambient temperature,
winding temperature, oil Adjust load if
Hourly
temperature, load and temperature is high.
voltage.
If low top up with
Oil level.
dry oil
Relief diaphragm.
Look for any sign of
Dehydrating breathers
Daily leakage Replace if
(check for free air
broken
passages.
Change if colour is
Check colour of silica-gel Fig. 4: Schematic of transformer with load.
load
pink
Lubricate bearings etc. of
Quarterly V. CONCLUSION
cooler fans, circulating ---
pumps etc., if any.
Check oil for dielectric
On-load
load tap changing transformers play important
strength and presence of roles in any modern power system, since they allow
Filter or replace if
Half yearly moisture
necessary
voltages to be maintained at desired levels despite
d
Check bushes, insulators load changes. Traditionally, on-load
on tap-changer is a
etc.
Check cable boxes etc.
complex mechanical device, which has some
Check oil for acidity, deficiencies.
Filter or change oil
sludge and flash point, if
possibly.
as necessary. The outage data analysis carried out on 100 MVA
Yearly transformer in receiving station presents,
pres the major
Check relays, alarms,
Methods of lowering
contacts etc.
resistance may be cause of outage in the 100MVA transformer,
transformer the fault
Check earth resistance detected was due to on-load load tap-changer
tap failure
followed if required.
Check lighting arrestors
Over-all inspection Wash by hosing
operated parallel to changee the tap position of
Five yearly including lifting of core down with clean dry transformer. Troubleshooting ofo OLTC given was
and coils. oil. very effective, it reduces the operating time and an
OLTC as a part of a transformer
ansformer the maintenance
m of
Fig.4 shows schematic of an ideal transformer with
transformer was essential, therefore maintenance
load, inn an ideal transformer, the induced
i voltage in
schedule for 100 MVA transformer been presented in
the secondary winding (Vs) is in proportion to the
this paper.
primary voltage (Vp) and is given by the ratio of the
number of turns in the secondary (Ns) to the number of
turns in the primary (Np) as fallows,
ACKNOWLEDGMENT
 
 ………………………… (1) The authors thank the Karnataka Power
  Transmission and Corporation Limited (KPTCL)
If the secondary coil is attached to a load that Company for provided monitoring and testing of
allows current to flow, electrical power is transmitted equipments in the 220/110 kV Receiving Station at
from the primary circuit to the secondary
seco circuit. Vajjarmatti, Karnataka for supporting
sup the field
Ideally, the transformer is perfectly efficient. All the investigation described in this paper.
incoming energy is transformed from the primary
REFERENCES
circuit to the magnetic field and into the secondary
circuit.
it. If this condition is met, the input electric [1] R. Vilaithong, S. Tenbohlen, T. Stirl,
Stirl “On-Line Tap Changer
power must equal the output power: Diagnosis Based On Acoustic Technique”, Matpast07.
[2] Facilities Instructions, Standards, and Techniques,
Techniques
“Maintenance Scheduling for Electrical Equipment”, Volume

     

  4-1B – Revised November 2005..
  ……… (2) [3] R. Sharma, “Maintenance
nance of Substation Equipments”, BSNL
Electrical Zone Patna, p.1-16.
Giving the ideal transformer equation,

  
  ………………………… (3)
(3
  

Presented at National Conference on Emerging Trends in Engineering and Technology (NCETET 2016):
January 25, 2016:Jointly Organized by Tontadarya College of Engineering (TCE) Gadag and AES Journals Page 572

Вам также может понравиться