Вы находитесь на странице: 1из 17

J~' ~~....-.

::~_
Qdtar General [rcctl1Cll\f & \'Valcr Corporation

Electricity Transmission Department Incident Number: ~2.00

NOTIFICATION OF SAFETY PRECAUTIONS


[Certification for Safe Commissioning & Energization of Plant (New or modified) to
be connected to KAHRAMMATransmission Network.]

132/33kV RAS ABU FONTAS METROSUBSTATION

To NATIONAL CONTRACTINGCOMPANY LTD.,

Contract No. GTC/643G/2014


Contract Ref. : QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE - 12 - PACKAGES S - S10
NOSP NUMBER : PH12-3G-78-48-R001(NOSP-PART A)

On behalf of Qatar General Electricity & Water Corporation - KAHRAMAA:


We notify you that from the agreed time and date as notified hereunder, this plant
will come under operational jurisdiction of the DIRECTOR OF ELECTRICITY
NETWORKSAFFAIRS. Therefore, from this time and date no work shall be carried
out on the plant detailed below unless the person in charge of such work is in
possession of appropriate Safety Document issued to him as per KAHRAMAARules
and Regulations.

PARTICULARSOF THE PLANT COVEREDBY THIS NOTIFICATION

a) i) List of Plant: Substation

No. Description
132kV GIS. TYPE ELK4

• 132/33kV 100MVA Transformer Bays HV Side - C11, C21 02 Nos


• Cable feeder Bay - C10,C30 02 Nos
1 • Spare Bays - C20,C40,C50,C60,00,C80 06 Nos
• Bus section - C12, C22 02 Nos
• Bus VT - C16, C26, C36, C46 04 Nos
• Bus Coupler - C13, C23 02 Nos

132l33kll. 100MllA ~Q11!Ui~[l[ilDifQ[mIU


2
• CE-H, CE-T2 02 Nos

PH 12-3G-78-4B-ROOl(Part-A)
'ET.P20/F2 'Issue: 3 '14 - 06 - 2012 NOSP -132/33kV RAS ABU FONTAS METRO
SUBSTATION
No. Description
l32kY Cables
132kV Cable lR/Ph,lCx630mm2 Cu conductor,XLPE insulated,lOOMVA
Cable between l32kV GIS to lOOMVA Power Transformers
Feeder.No: Cll to CE-Tl Feeder.No: C2l to CE-T2
3. R Ph 39.0m R Ph 35.0m
Y Ph 38.0m Y Ph 34.0m
B Ph 37.0m B Ph 33.0m

Three phase disconnecting Link boxes without SVL at terminal end(GIS


side) for direct earthing & bonding cable.
Feeder. No: Cll GIS END
.:. Make: EMELCO(TURKEY)
.:. TYPE: LB.W.E.3.l 1 No

4.
Three phase disconnecting Link boxes with SVL at terminal end(Power
Transformer side) for direct earthing & bonding cable.
Feeder. No: Cll POWER TRANSFORMEREND
lNo
.:. Make: EMELCO(TURKEY)
.:. TYPE: LB.W.3SA.3.l

Three phase disconnecting Link boxes without SVL at terminal end(GIS


side) for direct earthing & bonding cable.
Feeder. No: C2l GIS END
.:. Make: EMELCO(TURKEY)
5 .:. TYPE: LB.W.E.3.l 1 No

Three phase disconnecting Link boxes with SVL at terminal end(Power


Transformer side) for direct earthing & bonding cable. lNo
Feeder. No: C2l POWER TRANSFORMEREND
.:. Make: EMELCO(TURKEY)
.:. TYPE: LB.W.3SA.3.l
l32kV-630 Sqmm Terminations

.:. Feeder.No: Cll GIS to Power Transformer CE-Tl (l32KV side).


6
.:. Make: PFISTERER,Power Transformer end - Size 5S
3 Nos
.:. Make: PFISTERER,GIS end - Size 6S
3 Nos
.:. TYPE: Plug-In

PH 12-3G-78-48-R001 (Part-A) Page 2 of 17


1 ET-P20/F2 1 Issue : 3 114- 06 - 2012 NOSP -132/33kV RAS ABU FONTAS METRO
SUBSTATION
No. Description

132kV-630 Sqmm Terminations

.:. Feeder.No: C21 GIS to Power Transformer CE-T2 (132KV side) .


7 .:. Make: PFISTERER,Power Transformer end - Size 5S 3Nos
.:. Make : PFISTERER,GIS end - Size 6S 3Nos
.:. TYPE: Plug-In

132kY protection panel

.:. Cable feeder bay :Cl0,C30.RP . 02 Nos


.:. Spare Cable feeder bay: C20,C40,C50,C60,C80,C70.RP . 06 Nos
8
.:. 132/33kV, 100MVA Transformer Bays: Cl1.RP,C21.RP . 02 Nos
.:. Bus section Bay :C12.RP, C22.RP 02 Nos
.:. BBP.RP 05 Nos
.:. Bus Coupler :C13 RP, C23 RP 02 Nos
.:. 132/33kV, RTCC-l, 2. 02 Nos

33kV Switchgear
.:. Incomer 132/33kV Transformer (LV Side)
• E18 & E28
02 Nos
.:. Bus section
• E12,E22
02 Nos
.:. Bus VT
9 • E16 ,E26,E36 and E46 04 Nos
.:. Auxiliary Transformer Bay
• El0 and E20 02 Nos
.:. Outgoing Feeder Bay (Cable)
• E30 to E190 & E40 to E200 18 Nos
.:. Bus Coupler
• E13 And E23 02 Nos

Station Transformer
10
1600kVA ,33/0.415kV Station Transformer AT-l and AT-2 02 Nos

PH 12-3G-78-4B-R001(Part-A) Page 3 of 17
1 ET-P20/F2 1 Issue : 3 114-06 -2012 NOSP -132/33kV RAS ABU FONTAS METRO
SUBSTATION
J ~,

Qatar .General ErcCtrlCIlY & \\'a.er (orpor,nlofl


No. Description
33kY Cables
33kV Cable 4R/Ph 1CX500Sqmm XLPE Insulated, 100MVA Power cable
between 100MVA Power Transformer and 33kV SWGR
Feeder.No: Feeder.No:
11 CE-Tt - Et8 SWGR CE-T2 - E28 SWGR
R1-34.0m Y1-33.0m B1-33.0m R1-56.0m Y1-55.0m B1-55.0m
R2-35.0m Y2-34.0m B2-34.0m R2-57.0m Y2-57.0m B2-56.0m
R3-36.0m Y3-36.0m B3-35.0m R3-59.0m Y3-58.0m B3-58.0m
R4-37.0m Y4-37.0m B4-36.0m R4-60.0m Y4-60.0m B4-59.0m
33kV Single Phase Disconnecting Link Boxes With SVL at terminal end for
direct earthing & Bonding leads (4ways)
Feeder No 1 : 100MVA Power Transformer CE - T1(LV)
( 12 Feeder No 2 : 100MVA Power Transformer CE - T2(LV) 06 Nos

.:. Make: EMELCO (TURKEY)


.:. TYPE: LB.W.4SA.4.1
33kV Single Phase Disconnecting Link Boxes Without SVL at terminal end
for direct earthing & Bonding leads (4ways)
Feeder No 1 : 33kV SWGR - I/C (E18)
13 Feeder No 2 : 33kV SWGR - I/C (E28) 06 Nos

.:. Make: Make: EMELCO (TURKEY)


e- TYPE: LB.W.E.4.1
33kY -SOOSqmm Termination
Feeder No 1 : 100MVA Power Transformer CE - T1 (LV SIDE) 12 Nos
14
Feeder No 2 : 100MVA Power Transformer CE - T2 (LV SIDE) 12 Nos
Make: Raychem (Germany)

33kY -SOOSqmm Termination


Feeder No 1 : 33KV SWITCH GEAR SIDE (E18)
12 Nos
15 Feeder No 2 : 33KV SWITCH GEAR SIDE (E28)
12 Nos
Make: NKT (Germany)
TYPE: Plug-In

PH12·3G-78-4f1..ROOl(Part-A) Page 4 of 17
I ET·P20/F2 I'ssue : 3 114 - 06 • 2012 NOSP -132/33kV RAS ABU FONTAS METRO
SUBSTATION
No. Description
33kV 1R/Ph,lCX500Sqmm Cu Conductor XLPE Insulated ,1.6MVA Power
cable in basement floor between 33kV SWGR and Station Auxiliary
Transformer
Feeder.No 1: 33kV SWGR- E10 to Auxiliary Transformer AT-1
Feeder.No 2 :33 kV SWGR-E20 to Auxiliary Transformer AT-2
16 Cable length (Feeder -1) Cable length (Feeder -2)
R Ph 35 m R Ph 36 m
Y Ph 35 m Y Ph 36 m
B Ph 35 m B Ph 36 m

Three Phase Disconnecting Link Boxes Without SVL at terminal end for
direct earthing & Bonding leads
( Feeder No 1 : 33kV GIS -E10 to Auxiliary Transformer AT-1
02Nos
17 02Nos
Feeder No 2 : 33kV GIS- E20 to Auxiliary Transformer AT-2

.:. Make: EMELCO(TURKEY)

33kV -SOOSqmm Termination

Feeder No 1 : 1600kVA Station Transformer AT-1 to 33kV GIS (E10)


06 Nos

Make: Raychem (Germany)-Quanity -03Nos(Transformer End)


18 Make: NKT (Germany) -Quanity -03 Nos(GIS End)

Feeder No 2 : 1600kVA Station Transformer AT-2 to 33kV GIS (E20)


06 Nos
Make: Raychem (Germany)-Quanity -03Nos(Transformer End)
Make: NKT (Germany) -Quanity -03 Nos(GIS End)

19 LV Power & Control Cables with all accessories 2 Lot

PH 12-3G-78-48-R001 (Part-A) Page 5 of 17


I ET-P20/F2 I Issue : 3 114-06-2012 NOSP -132/33kV RAS ABU FONTAS METRO
SUBSTATION
No. Description
33kY protection panel

.:. Incomer 132/33kV Transformer (LV Side)


• E18.RP &E28.RP 02 Nos
.:. Bus section
• E12.RP & E22.RP 02 Nos
.:. Bus Coupler
• E13.RP & E23.RP 02 Nos
.:. Station Transformer Bay
20
• E10.RP & E20.RP 02 Nos
.:. Outgoing Feeder Bay (Cable)
• E30.RP to E170.RP & E40.RP to E180.RP 16 Nos
• Future Capacitor Bay E190.RP and E200.RP 02 Nos
.:. Bus Bar protection
• BBP.RP1, 2, 3, 4,5,6 & 7 07 Nos
.:. 33kV Tarrif Metering Panel
• EOO.RP 01 No
.:. IP:33kV DBB Interface panel 33kV Side 01 No
~~kY r:t~ytr5!1!;iU:tbioa B!i:~i~t~u
21
02 Nos
• NER-1, NER-2

33kV ,1R/N ,lCX500Sqmm XLPE Insulated ,100MVA Power cable between


100MVA Power Transformer and 33kV NER
22
Cable length (CE-Tl to NER-1) Cable length (CE-T2 to NER-2)
Neutral 15 m Neutral 17 m

132KY SCS &. Associated Eguipmeot 01 Lot

23 • SCS - CP1 & CP2 02 Nos


• SCS - CAP 01 No

33KV SCS &. Associ5!ted Eguipmeot


01 Lot
24 01 No
• SCS - CP
01 No
• SCS - CAP

PH12-3G-78-4B-R001 (Part-A)
1 ET-P20/F2 1 Issue : 3 114- 06 - 2012 NOSP -132/33kV RAS ABU FONTAS METRO
SUBSTATION
No. Description
25 415V LVAC Distribution Board -KM & QRAIL 02 Lot

26 110V DC Distribution Board -KM & QRAIL 02 Lot

27 110V DC Battery Charger & Fuse Box (DVR & Inter connection panel) - 02 Nos
KM & QRAIL
28 110V DC Battery Bank - KM & QRAIL 04 Set

29 240V UPS -KM & QRAIL 02 Set

30 Earthing & lightning System 01 Lot

(
31 Overhead Travelling Crane in GIS Room 01 Nos

32 Monorail in Pump Room 01 Nos

33 Small Power & Lighting System. 01 Lot

34 HVAC System 01 Lot


Fire Fighting System

01 Lot
35 Deluge System for 40MVA, 66/11kV Power Transformer-BA-Tl,T2,T3 & T4.

01 Lot
36 Transformer Explosion Prevention system

01 Lot
37 Fire Pumps, Controllers & Fire Water Tank

01 Lot
38 Fire detector & Fire Alarm System.

01 Lot
39 Fire Extinguishers

01 Lot
40 FM 200 System.

41 Telephone System(including OTP & SDH panel) 01 Lot

42 SMS System (CCTV , ACS & KEY MANAGEMENT SYSTEM) 01 Lot

43 Civil Works (Basement Floor,Ground Floor) 01 Lot

PH12-3G-78-48-ROOl (Part-A)
1 ET ·P20/F2 1 Issue : 3 114-06 ·2012 NOSP -132/33kV RAS ABU FONTAS METRO
SUBSTATION
\'\taJCf 'CorPoratIon
a) i) List of Site Test Reports (Appendix A): Substation

No. Description
1 100 MVA POWER TRANSFORMER CE-Tl to CE-T2 (VOLUME-1 FILE 1.1 TO FILE 1.2)
2 AUXILIARY TRANSFORMER AT 1 to AT 2 (VOLUME-1 FILE 1.3 TO FILE 1.4)
3 NEUTRAL EARTHING RESISTOR NER 01 TO NER 02 (VOLUME-1 FILE1.5 FILE 1.6)
4 RTCC REPORT (VOLUME-1 FILE 1.7)
5 132kV GIS (VOLUME-2 FILE 2.1 TO 2.13)
6 33kV SWITCHGEAR (VOLUME-3 FILE 3.1 TO FILE 3.14)
7 415V LVAC DISTRIBUTION BOARD QRAIL (VOLUME-4 FILE 4.1 TO FILE 4.3)
8 110V DC DISTRIBUTION BOARD QRAIL (VOLUME-4 FILE 4.4)
(
9 240V UPS QRAIL (VOLUME-4,FILE 4.5)
10 l10V BATTERY CHARGER QRAIL (VOLUME-4,FILE 4.5)
11 415V LVAC DISTRIBUTION BOARD KM (VOLUME-5 FILE 5.1 TO FILE 5.5)
12 110V DC DISTRIBUTION BOARD KM (VOLUME-5 FILE 5.6)
13 240V UPS KM (VOLUME-5,FILE 5.6)
14 110V BATTERY CHARGER KM (VOLUME-5,FILE 5.7)
15 132kV PROTECTION SYSTEM (VOLUME-6 FILE 6.1 TO FILE 6.12)
16 33kV PROTECTION SYSTEM (VOLUME-7 FILE 7.1 TO FILE 7.27)
17 SCS & ASSOCIATED EQUIPMENT (VOLUME-8 FILE 8.1)
18 CABLE SITE ACCEPTANCESAT REPORT (VOLUME-9 FILE 9.1)
MEP SAT REPORT (VOLUME-10 FILE 10.1)
• HVAC
19
.. LIGHTING & SMALL POWER
• EARTHING & LIGHTNING PROTECTION
• FIRE FIGHTING SYSTEM
• DELUGE SYSTEM
20 PROTECTION END TO END REPORT, STEP & TOUCH,TARIFF METER(VOLUME-11)
21 COMMISSIONING CHECK LIST (VOLUME-12)
22 STABILITY TEST REPORT (VOLUME-13)
23 RELAY SEllING CALCULATION (VOLUME-14)

I ET-P20/F2 I Issue ; 3 114 - 06 - 2012


PH 12-3G-78-48-R001 (Part-A)
NOSP -132/33kV RAS ABU FONTAS METRO
SUBSTATION
b List of documents and drawing (Appendix 8):

No. Description

1 81-Plant Specification Data


2 82- Technical Data Sheets
3 83-Redmarkup Drawings

d) SLD & Terminal 8ay Status (Appendix C):

No. Description

1 As Per Appendix C

e) FAT TYPETEST REPORT (Appendix D):

No. Description

1 As per Appendix D
2 FAT &TTR (Soft Copy Attached with Index)

f) Erection Completion Certificate (Appendix E):

No. Description

1 As per Appendix E

q) Operation and Maintenance Manual (Appendix F):

No. Description

1 As per Appendix F (Soft Copy Attached with Index)

h) Proposed Spare Parts List (Appendix G):

No. Description

1 As per Appendix G

i) Warranty Declaration Certificate (Appendix H):

No. Description

1 I As per Appendix H

PH12-3G-78-48-R001 (Part-A) Page 9 of 17


1 ET-P20/F2 1 Issue : 3 114 - 06 - 2012 NOSP -132/33kV RAS ABU FONTAS METRO
SUBSTATION
~
Qarar GeneraJ ErcctJIctty 8. \'Vatcr (orporatlon
j) Cable Data (Appendix I):

No. Description

1 As per Appendix I

k) CT-VT Sizing Calculations & Relay Setting Calculations (Appendix J):

No. Description

1 As per Appendix J (Soft Copy Attached)


(

I) Erection Control Forms (Appendix K):

No. Description

1 I As per Appendix K

m) SCS (Appendix L):

No. Description

1 I As per Appendix L

CONFORMANCE WITH KAHRAMAA SAFETY RULES AND


REGULATIONS;
Part A' Initial Status of the Plant (CONDITIONAL)'
No. Description Status
1. All the installation work at the site is completed as required by KM
procedures Rules & Requlatlons. Yes
2. All Factory and Pre-commissioning Site tests
(Power/Protection/Telecom) have been satisfactorly completed. Yes
3. The Plant is ISOLATED AND EARTHED. Yes

PH 12-3G-78-4B-R001(Part-A)
1 ET-P20/F2 1 Issue : 3 114- 06 - 2012 NOSP -132/33kV RAS ABU FONTAS METRO
SUBSTATION
I

Qarar General ErcetrlClly" \Valcr CorpOfil11on


Electricity Transmission Department Incident Number: .4-'2-00
List of Remaininq (Pendinq) Works/Tests:
NO. Descri ption Remarks
A Electrical
Replacement of Tariff Meter CT/VT in
1 In Progress, will be cleared before NOSP-B
33KV GIS to be done
Replacement of faulty drive mechanism in
2 33KV GIS Bus section Bay (E 126 ) to be In Progress, will be cleared 15-6-2017
done
3 Pending Site Notes to be cleared In Progress will be cleared before NOSP-B
4 Pending ECFComments to be cleared In Progress will be cleared before NOSP-B
Padlocks as per KM Standard to be
5 provided for all equipment's in the In Progress, will be cleared before NOSP-B
substation
Pending Red Markup drawings to be
6 In Progress, will be cleared 15-6-2017
( preQared and submitted for review
Lighting & Small Power Lux Level
7 In Progress, will be cleared 15-6-2017
measurement test to be completed
B Electrical - Internal Power cables
Fire retardant coatingfor all internal power
1 In Progress, will be cleared before NOSP-B
& control cables to be completed
Final sheath test & Link Box CRM test to
2 In Progress, will be cleared before NOSP-B
be completed
Adequate labels as per KM standard
3 In Progress, will be cleared before NOSP-B
labeling system to be provided
C Protection Unit
Except IP PANEL,Metering Panel Red
1 In Progress, will be cleared before NOSP-B
marked up drawings All are Completed
Relay Setting Red markup to be
2 In Progress, Along With NOSP-B
submitted
DIGSI Printout Verification to be
3 In Progress, Along With NOSP-B
submitted
Protection and Commissioning Check List
4 In Progress, Along With NOSP-B
to be submitted
Overall Stability Test for C10 & C30 Bays
5 In Progress, Along With NOSP-B
to be done
Power dB Loss measurement for FO
6 In Progress, will be cleared before NOSP-B
cables (Cl0 & C30 Bays)

7 Power transformer Stability to be done In Progress, will be cleared before NOSP-B

D MEP
HVAC
ACCPpanel 2A & 2B to be tested
1 In Progress, Along With NOSP-B
&commissioned.
Air balancing for Air conditioning and
2 After Energisation
ventilation system.
3 ECF Comments Pending Site Notes In Progress Along With NOSP-B
PLUMBING 8t DRAINAGE
Replacing of temporary transfer, domestic
1 In Progress, Along With NOSP-B
and booster pumps to be done.

PH 12-3G-78-48-ROOl (Part-A)
I ET-P20/F2 1 Issue : 3 114 - 06 - 2012 NOSP -132/33kV RAS ABU FONTAS METRO
SUBSTATION
Loss Prevention system
Fire water tank roof rectification & level
1 In Progress, Along With NOSP-B
switch to be installed.
Fire alarm/ FM 200 battery performance
2 test to be done after substation In Progress, Along With NOSP-B
enerqization.
Fire extinguisher installation &
3 In Progress, Along With NOSP-B
commissioning
FM 200 room integrity test to be done
4 In Progress, Along With NOSP-B
after substation enerulzation.
Activation of FM200 system (putting
5 system in service) to be done after In Progress, Along With NOSP-B
substation energization.
Passive fires stop sealant to be
6 In Progress, Along With NOSP-B
completed.
Basement cables passive cable coating
7 In Progress, Along With NOSP-B
tobe done after substation energization.
GENERAL
RFI and Site notes comments to be closed
CCTV &SMS
Electric strike & Door Contacts installation
1 In Progress, Along With NOSP-B
for the Pedestrian /wlcket door.
2 Grounding for the Basement cable trunk. In Progress Along With NOSP-B
Media Converters needs to be labelled and
3 In Progress, Along With NOSP-B
Fluke test for the splicing pending.
Media Conveters needs to be labelled and
4 In Progress, Along With NOSP-B
Fluke test for the splicing pending.
Gibic Installation pending for the Network
5 In Progress, Along With NOSP-B
Switches
E CIVIL
In progress, will be completed before
1 Master key Cylinder
NOSP-B
Painting Touchup work for Power In progress, will be completed before
2
Transformer NOSP-B
In progress, will be completed before
3 Painting Touchup work for Floor
NOSP-B
In progress, will be completed before
4 Cantilever slab (Power Transformer area)
NOSP-B
F SCS
AC & DC Check test report for CAP, CP1&
1 Shall be submit on 15-06-2017
CP2 shall be secreuated.
AC Check - SCS CP 1 Panel missing - KM Shall be submit on 15-06-2017
2
& Qrail
3 AC Check - SCS CP 2 Panel missing - KM Shall be submit on 15-06-2017
AC Check - Control Desk rnlssinq - KM & Shall be submit on 15-06-2017
4
Qrail
KM A202 CAP BCU - Component test
5 Shall be submitting before NOSP-B
report missing.
C12 & C22 - Synchro check test report
6 Shall be submit on 15-06-2017
missing.
SAT Functionality - KM Safety tag
7 Shall be submitting before NOSP-B
document screen shots missing.
Page 12 of 17
-
PH 12-3G-78-48-ROOI(Part-A)
1 ET-P20/F2 1 Issue : 3 114-06-2012
1 I NOSP -132/33kV RAS ABU FONTAS METRO
SUBSTATION J "~
SAT SCS 33KV - 1.4 Related document
8 Shall be completed NOSP Part B
verification pending.
SAT SCS 33KV - 2.1.2 tag usage
9 Shall be completed before NOSP Part B
verification pending.
SAT SCS 33KV - 2.4.3 SLD verification
10 Shall be completed before NOSP Part B
pending.
SAT SCS 33KV - 2.4.4 Audible alarm
11 Shall be completed before NOSP Part B
verification pending.
SAT SCS 33KV - 2.4.12 Access rights
12 Shall be completed before NOSP Part B
verification pending.
SAT SCS 33KV - 2.4.13 Feeder Control
13 Shall be completed before NOSP Part B
function verification pending.
SAT SCS 33KV - 2.4.14 Status Monitoring
14 Shall be completed before NOSP Part B
verification pending.
SAT SCS 33KV - 2.4.15 Control Authority
15 . Shall be completed before NOSP Part B
verification pending.
SAT SCS 33KV - 2.4.16 Safety Tag facility
16 Shall be completed before NOSP Part B
pending.
SAT SCS 33KV - 2.4.18 Trip Relay Reset
17 Shall be completed before NOSP Part B
verification pending.
SAT SCS 33KV - 2.6.1 LAN port of
18 Shall be completed before NOSP Part B
computers verification pendillg_.
SAT SCS 33KV - 2.6.6 Protection scheme
19 Shall be completed before NOSP Part B
verification pendiflQ_.
SAT SCS 33KV - 2.6.7 lEC 104
20 Shall be completed before NOSP Part B
Configuration verification pending.
SAT SCS 33KV - 2.6.8 Monitor screen
21 Shall be completed before NOSP Part B
saver verification pending.
SAT SCS 33KV - 2.6.9 Transformer
22 operation via Gateway verification Not applicable for Qrail side
pending.
SAT SCS 33KV - 2.7.1 SICAM SCS
23 Shall be completed before NOSP Part B
Redundancy test verification pending.
SAT SCS 33KV - 2.7.1.2 DCC test
24 Not applicable for Qrail side
verification pendill9_,
SAT SCS 33KV - 2.7.1.3 Gateway
25 redundancy test between KM Qrail Shall be testing before NOSP part B
verification pending.
SAT SCS 33KV - 3 - Online access
26 configuration download/upload verification Shall be testing before NOSP part B
pendin_g_.
SAT SCS 33KV - 5 - Test of firewall
27 Shall be testing before NOSP part B
verification pending.
SAT SCS 33KV - 6 - Test of Laptop
28 Shall be update the status at time of NOSP-B
verification pending.
SAT SCS 33KV - SAT index of Khalidiya
29 Shall be completed before NOSP Part B
substation shall be removed.
System response check
30 Indications(Annexure - 8) for SCS 33KV - Shall be completed before NOSP Part B
Signed document attachment missing.
System response check Measurement
31 (Annexure - 10) for SCS 132KV - Shall be completed before NOSP Part B
document for KM missing.
32 TDS KM document missing. Shall be completed before NOSP Part B

PH12·3G·78·48-R001 (Part-A) Page 13 of 17


1 ET·P20/F2 1 Issue : 3 114 - 06 - 2012 NOSP -132/33kV RAS ABU FONTAS METRO
SUBSTATION
J~I ~ ~
Qatar Gef1~ralEfectncll\' &. \\Iatcf Corporation
Transformer analog measurement test
33 E10 & E20 - Sign Pending and screen Shall be completed before NOSP Part B
shots rnissinq.
33KV Signal List - Test report should be
34 Shall be completed before NOSP Part B
seqreqated bay wise inside the folder.
132KV Signal List - Test report should be
35 Shall be completed before NOSP Part B
seqreqated bay wise inside the folder.
33KV Signal List - NA Signal list
36 Shall be completed before NOSP Part B
attachment missinu.
132KV Signal List - NA Signal list
37 Shall be completed before NOSP Part B
attachment missinu.
33KV Signal List - Signed document
38 Shall be completed before NOSP Part B
attachment rnlsslnq.
132KV Signal List - Signed document
39 Shall be completed before NOSP Part B
attachment rnissinq.
40 NCC Sianal list attachment mlssinc. Shall be completed before NOSP Part B
41 DCC Slqnal List attachment missing. Shall be completed before NOSP Part B
RMD - KM CP1 scheme Attachment
42 Shall be completed before NOSP Part B
missina.
RMD - KM CP2 scheme Attachment
43 Shall be completed before NOSP Part B
missing.
RMD - KM CAP scheme Attachment
44 Shall be completed before NOSP Part B
missina.
RMD - Qrail CP1 scheme Attachment
45 Shall be completed before NOSP Part B
missina.
RMD - Qrail CAP scheme Attachment
46 Shall be completed before NOSP Part B
rnlsstno.
RMD - Qrail Control Desk scheme
47 Shall be completed before NOSP Part B
Attachment misslnq.
OEM Document for Qrail and KM
48 Shall be update the status before NOSP B
attachment missing.
Project backup and system back up for
49 Shall be completed before NOSP Part B
KM and Orail rnissinq,
Password list and software list attachment
50 Shall be completed before NOSP Part B
missina for KM and Qrail (Appendix L).
Cyber security attachment missing for KM
51 Shall be completed before NOSP Part B
and Orail (Appendix M).
SCS operational Philosophy document
52 Shall be update the status before NOSP B
attachment missing.

PH12-3G-78-48-R001 (Part-A) Page 14 of 17


1 ET-P20IF2 1 Issue : 3 114 - 06 - 2012 NOSP -132/33kV RAS ABU FONTAS METRO
SUBSTATION
Electricity Transmission Department Incident Number: l.v.l..o D

Issued with the Consent of the followin_g persons of KM & Consultant:


KM Name Signature Date

\ _..\___:s
TAl
ET
Project Coordinator
Abdul Muthu
Badrudeen r~~-'
'II!:"
... 's\~~~,..
Consultant * Mr.Gary Dolton ~~ou:: ~~~
~~~,

~e,~,\\
fl- FEr~ "c
(
KM Name Signature
Date & !~,gn~~~ li
\~,bf c.19P. 0_,

Substations*
Time
~.,~ .'?/)
\'./._
'.\':., t~~,,~
e- ~

~'. 'l.Ij'FCr/"r..,' \~\' :,."-


KCT '~~;.<

Cables*

OHL*

Telecom*

Telecontrol I sCS*

Protection*

SCADA*
(* Indicate if not applicable)

PH 12-3G-78-48-R001 (Part-A) Page 15 of 17


1 ET-P20/F2 1 Issue : 3 114- 06 - 2012 NOSP -132/33kV RAS ABU FONTAS METRO
SUBSTATION
Electricity Transmission Department Incident Number:

Part B: Final Status of the Plant:

No. Descri_1!tion Status


1 High Voltage Test at site for primary insulation has been satisfactorily
completed.
2 All Commissioning Site tests (Power/Protection/Telecom) have been
satisfactorily completed and the Plant is ready for energisatlon as per
KAHRAMAAapproved commissioning programme.
3. Links and jumpers of the Plant have been connected with KAHRAMAA
existing terminal equipment.
Issue d WI"th th e Consen t 0f th e f 0IIowmg persons 0f KAHRAMAA ..
Department/Section/Unit Name Signature Date Be. Signatory
time ofNCC
( KM - Technical Affairs / ET

Consultant

Substations*
Cables*
OHL*
Protection*
KCT
Telecom*
Telecontrol / SCS*
Condition Monitoring*
SCADA*
Senior Sub-station Engineer

Senior Cable Engineer

Senior OHL Engineer

Senior Protection Engineer


(Transmission)
Senior Engineer
(Automation & Instrumentation)
Senior Engineer (Protection
Design & System Analysis)
Senior Telecommunication
Engineer
Senior Condition Monitoring
Engineer
Head of GIS Data Base
(* Indicate If not applicable)

PH12-3G-78-48-R001 (Part-A)
1 ET-P20/F2 1 Issue : 3 114- 06 - 2012 NOSP -132/33kV RAS ABU FONTAS METRO
SUBSTATION
Electricity Transmission Department Incident Number: ~ C>

ACKNOWLEDGEMENT OF THIS NOTIFICATION:

ON BEHALF OF CONTRACTOR:

We acknowledge receipt of this Notification and undertake to act in accordance


with the Safety rules and regulations of KAHRAMAA and also notify all the site
staff / workmen under our employment including those of our sub-contractors.

Signature of Contractor / Bulk Consumer / IPP*

ON BEHALF OF KAHRAMAA:

Signature of Senior System Control Engineer

Date:

1 ET·P20/F2 l,ssue:3 114-06.2012


PH12·3G-78·48-R001 (Part·A)
NOSP -132/33kV RAS ABU FONTAS METRO
SUBSTATION
Page 17 of 17