Qdtar General [rcctl1Cll\f & \'Valcr Corporation
No. Description
132kV GIS. TYPE ELK4
PH 12-3G-78-4B-ROOl(Part-A)
'ET.P20/F2 'Issue: 3 '14 - 06 - 2012 NOSP -132/33kV RAS ABU FONTAS METRO
SUBSTATION
No. Description
l32kY Cables
132kV Cable lR/Ph,lCx630mm2 Cu conductor,XLPE insulated,lOOMVA
Cable between l32kV GIS to lOOMVA Power Transformers
Feeder.No: Cll to CE-Tl Feeder.No: C2l to CE-T2
3. R Ph 39.0m R Ph 35.0m
Y Ph 38.0m Y Ph 34.0m
B Ph 37.0m B Ph 33.0m
4.
Three phase disconnecting Link boxes with SVL at terminal end(Power
Transformer side) for direct earthing & bonding cable.
Feeder. No: Cll POWER TRANSFORMEREND
lNo
.:. Make: EMELCO(TURKEY)
.:. TYPE: LB.W.3SA.3.l
33kV Switchgear
.:. Incomer 132/33kV Transformer (LV Side)
• E18 & E28
02 Nos
.:. Bus section
• E12,E22
02 Nos
.:. Bus VT
9 • E16 ,E26,E36 and E46 04 Nos
.:. Auxiliary Transformer Bay
• El0 and E20 02 Nos
.:. Outgoing Feeder Bay (Cable)
• E30 to E190 & E40 to E200 18 Nos
.:. Bus Coupler
• E13 And E23 02 Nos
Station Transformer
10
1600kVA ,33/0.415kV Station Transformer AT-l and AT-2 02 Nos
PH 12-3G-78-4B-R001(Part-A) Page 3 of 17
1 ET-P20/F2 1 Issue : 3 114-06 -2012 NOSP -132/33kV RAS ABU FONTAS METRO
SUBSTATION
J ~,
PH12·3G-78-4f1..ROOl(Part-A) Page 4 of 17
I ET·P20/F2 I'ssue : 3 114 - 06 • 2012 NOSP -132/33kV RAS ABU FONTAS METRO
SUBSTATION
No. Description
33kV 1R/Ph,lCX500Sqmm Cu Conductor XLPE Insulated ,1.6MVA Power
cable in basement floor between 33kV SWGR and Station Auxiliary
Transformer
Feeder.No 1: 33kV SWGR- E10 to Auxiliary Transformer AT-1
Feeder.No 2 :33 kV SWGR-E20 to Auxiliary Transformer AT-2
16 Cable length (Feeder -1) Cable length (Feeder -2)
R Ph 35 m R Ph 36 m
Y Ph 35 m Y Ph 36 m
B Ph 35 m B Ph 36 m
Three Phase Disconnecting Link Boxes Without SVL at terminal end for
direct earthing & Bonding leads
( Feeder No 1 : 33kV GIS -E10 to Auxiliary Transformer AT-1
02Nos
17 02Nos
Feeder No 2 : 33kV GIS- E20 to Auxiliary Transformer AT-2
PH12-3G-78-4B-R001 (Part-A)
1 ET-P20/F2 1 Issue : 3 114- 06 - 2012 NOSP -132/33kV RAS ABU FONTAS METRO
SUBSTATION
No. Description
25 415V LVAC Distribution Board -KM & QRAIL 02 Lot
27 110V DC Battery Charger & Fuse Box (DVR & Inter connection panel) - 02 Nos
KM & QRAIL
28 110V DC Battery Bank - KM & QRAIL 04 Set
(
31 Overhead Travelling Crane in GIS Room 01 Nos
01 Lot
35 Deluge System for 40MVA, 66/11kV Power Transformer-BA-Tl,T2,T3 & T4.
01 Lot
36 Transformer Explosion Prevention system
01 Lot
37 Fire Pumps, Controllers & Fire Water Tank
01 Lot
38 Fire detector & Fire Alarm System.
01 Lot
39 Fire Extinguishers
01 Lot
40 FM 200 System.
PH12-3G-78-48-ROOl (Part-A)
1 ET ·P20/F2 1 Issue : 3 114-06 ·2012 NOSP -132/33kV RAS ABU FONTAS METRO
SUBSTATION
\'\taJCf 'CorPoratIon
a) i) List of Site Test Reports (Appendix A): Substation
No. Description
1 100 MVA POWER TRANSFORMER CE-Tl to CE-T2 (VOLUME-1 FILE 1.1 TO FILE 1.2)
2 AUXILIARY TRANSFORMER AT 1 to AT 2 (VOLUME-1 FILE 1.3 TO FILE 1.4)
3 NEUTRAL EARTHING RESISTOR NER 01 TO NER 02 (VOLUME-1 FILE1.5 FILE 1.6)
4 RTCC REPORT (VOLUME-1 FILE 1.7)
5 132kV GIS (VOLUME-2 FILE 2.1 TO 2.13)
6 33kV SWITCHGEAR (VOLUME-3 FILE 3.1 TO FILE 3.14)
7 415V LVAC DISTRIBUTION BOARD QRAIL (VOLUME-4 FILE 4.1 TO FILE 4.3)
8 110V DC DISTRIBUTION BOARD QRAIL (VOLUME-4 FILE 4.4)
(
9 240V UPS QRAIL (VOLUME-4,FILE 4.5)
10 l10V BATTERY CHARGER QRAIL (VOLUME-4,FILE 4.5)
11 415V LVAC DISTRIBUTION BOARD KM (VOLUME-5 FILE 5.1 TO FILE 5.5)
12 110V DC DISTRIBUTION BOARD KM (VOLUME-5 FILE 5.6)
13 240V UPS KM (VOLUME-5,FILE 5.6)
14 110V BATTERY CHARGER KM (VOLUME-5,FILE 5.7)
15 132kV PROTECTION SYSTEM (VOLUME-6 FILE 6.1 TO FILE 6.12)
16 33kV PROTECTION SYSTEM (VOLUME-7 FILE 7.1 TO FILE 7.27)
17 SCS & ASSOCIATED EQUIPMENT (VOLUME-8 FILE 8.1)
18 CABLE SITE ACCEPTANCESAT REPORT (VOLUME-9 FILE 9.1)
MEP SAT REPORT (VOLUME-10 FILE 10.1)
• HVAC
19
.. LIGHTING & SMALL POWER
• EARTHING & LIGHTNING PROTECTION
• FIRE FIGHTING SYSTEM
• DELUGE SYSTEM
20 PROTECTION END TO END REPORT, STEP & TOUCH,TARIFF METER(VOLUME-11)
21 COMMISSIONING CHECK LIST (VOLUME-12)
22 STABILITY TEST REPORT (VOLUME-13)
23 RELAY SEllING CALCULATION (VOLUME-14)
No. Description
No. Description
1 As Per Appendix C
No. Description
1 As per Appendix D
2 FAT &TTR (Soft Copy Attached with Index)
No. Description
1 As per Appendix E
No. Description
No. Description
1 As per Appendix G
No. Description
1 I As per Appendix H
No. Description
1 As per Appendix I
No. Description
No. Description
1 I As per Appendix K
No. Description
1 I As per Appendix L
PH 12-3G-78-4B-R001(Part-A)
1 ET-P20/F2 1 Issue : 3 114- 06 - 2012 NOSP -132/33kV RAS ABU FONTAS METRO
SUBSTATION
I
D MEP
HVAC
ACCPpanel 2A & 2B to be tested
1 In Progress, Along With NOSP-B
&commissioned.
Air balancing for Air conditioning and
2 After Energisation
ventilation system.
3 ECF Comments Pending Site Notes In Progress Along With NOSP-B
PLUMBING 8t DRAINAGE
Replacing of temporary transfer, domestic
1 In Progress, Along With NOSP-B
and booster pumps to be done.
PH 12-3G-78-48-ROOl (Part-A)
I ET-P20/F2 1 Issue : 3 114 - 06 - 2012 NOSP -132/33kV RAS ABU FONTAS METRO
SUBSTATION
Loss Prevention system
Fire water tank roof rectification & level
1 In Progress, Along With NOSP-B
switch to be installed.
Fire alarm/ FM 200 battery performance
2 test to be done after substation In Progress, Along With NOSP-B
enerqization.
Fire extinguisher installation &
3 In Progress, Along With NOSP-B
commissioning
FM 200 room integrity test to be done
4 In Progress, Along With NOSP-B
after substation enerulzation.
Activation of FM200 system (putting
5 system in service) to be done after In Progress, Along With NOSP-B
substation energization.
Passive fires stop sealant to be
6 In Progress, Along With NOSP-B
completed.
Basement cables passive cable coating
7 In Progress, Along With NOSP-B
tobe done after substation energization.
GENERAL
RFI and Site notes comments to be closed
CCTV &SMS
Electric strike & Door Contacts installation
1 In Progress, Along With NOSP-B
for the Pedestrian /wlcket door.
2 Grounding for the Basement cable trunk. In Progress Along With NOSP-B
Media Converters needs to be labelled and
3 In Progress, Along With NOSP-B
Fluke test for the splicing pending.
Media Conveters needs to be labelled and
4 In Progress, Along With NOSP-B
Fluke test for the splicing pending.
Gibic Installation pending for the Network
5 In Progress, Along With NOSP-B
Switches
E CIVIL
In progress, will be completed before
1 Master key Cylinder
NOSP-B
Painting Touchup work for Power In progress, will be completed before
2
Transformer NOSP-B
In progress, will be completed before
3 Painting Touchup work for Floor
NOSP-B
In progress, will be completed before
4 Cantilever slab (Power Transformer area)
NOSP-B
F SCS
AC & DC Check test report for CAP, CP1&
1 Shall be submit on 15-06-2017
CP2 shall be secreuated.
AC Check - SCS CP 1 Panel missing - KM Shall be submit on 15-06-2017
2
& Qrail
3 AC Check - SCS CP 2 Panel missing - KM Shall be submit on 15-06-2017
AC Check - Control Desk rnlssinq - KM & Shall be submit on 15-06-2017
4
Qrail
KM A202 CAP BCU - Component test
5 Shall be submitting before NOSP-B
report missing.
C12 & C22 - Synchro check test report
6 Shall be submit on 15-06-2017
missing.
SAT Functionality - KM Safety tag
7 Shall be submitting before NOSP-B
document screen shots missing.
Page 12 of 17
-
PH 12-3G-78-48-ROOI(Part-A)
1 ET-P20/F2 1 Issue : 3 114-06-2012
1 I NOSP -132/33kV RAS ABU FONTAS METRO
SUBSTATION J "~
SAT SCS 33KV - 1.4 Related document
8 Shall be completed NOSP Part B
verification pending.
SAT SCS 33KV - 2.1.2 tag usage
9 Shall be completed before NOSP Part B
verification pending.
SAT SCS 33KV - 2.4.3 SLD verification
10 Shall be completed before NOSP Part B
pending.
SAT SCS 33KV - 2.4.4 Audible alarm
11 Shall be completed before NOSP Part B
verification pending.
SAT SCS 33KV - 2.4.12 Access rights
12 Shall be completed before NOSP Part B
verification pending.
SAT SCS 33KV - 2.4.13 Feeder Control
13 Shall be completed before NOSP Part B
function verification pending.
SAT SCS 33KV - 2.4.14 Status Monitoring
14 Shall be completed before NOSP Part B
verification pending.
SAT SCS 33KV - 2.4.15 Control Authority
15 . Shall be completed before NOSP Part B
verification pending.
SAT SCS 33KV - 2.4.16 Safety Tag facility
16 Shall be completed before NOSP Part B
pending.
SAT SCS 33KV - 2.4.18 Trip Relay Reset
17 Shall be completed before NOSP Part B
verification pending.
SAT SCS 33KV - 2.6.1 LAN port of
18 Shall be completed before NOSP Part B
computers verification pendillg_.
SAT SCS 33KV - 2.6.6 Protection scheme
19 Shall be completed before NOSP Part B
verification pendiflQ_.
SAT SCS 33KV - 2.6.7 lEC 104
20 Shall be completed before NOSP Part B
Configuration verification pending.
SAT SCS 33KV - 2.6.8 Monitor screen
21 Shall be completed before NOSP Part B
saver verification pending.
SAT SCS 33KV - 2.6.9 Transformer
22 operation via Gateway verification Not applicable for Qrail side
pending.
SAT SCS 33KV - 2.7.1 SICAM SCS
23 Shall be completed before NOSP Part B
Redundancy test verification pending.
SAT SCS 33KV - 2.7.1.2 DCC test
24 Not applicable for Qrail side
verification pendill9_,
SAT SCS 33KV - 2.7.1.3 Gateway
25 redundancy test between KM Qrail Shall be testing before NOSP part B
verification pending.
SAT SCS 33KV - 3 - Online access
26 configuration download/upload verification Shall be testing before NOSP part B
pendin_g_.
SAT SCS 33KV - 5 - Test of firewall
27 Shall be testing before NOSP part B
verification pending.
SAT SCS 33KV - 6 - Test of Laptop
28 Shall be update the status at time of NOSP-B
verification pending.
SAT SCS 33KV - SAT index of Khalidiya
29 Shall be completed before NOSP Part B
substation shall be removed.
System response check
30 Indications(Annexure - 8) for SCS 33KV - Shall be completed before NOSP Part B
Signed document attachment missing.
System response check Measurement
31 (Annexure - 10) for SCS 132KV - Shall be completed before NOSP Part B
document for KM missing.
32 TDS KM document missing. Shall be completed before NOSP Part B
\ _..\___:s
TAl
ET
Project Coordinator
Abdul Muthu
Badrudeen r~~-'
'II!:"
... 's\~~~,..
Consultant * Mr.Gary Dolton ~~ou:: ~~~
~~~,
~e,~,\\
fl- FEr~ "c
(
KM Name Signature
Date & !~,gn~~~ li
\~,bf c.19P. 0_,
Substations*
Time
~.,~ .'?/)
\'./._
'.\':., t~~,,~
e- ~
Cables*
OHL*
Telecom*
Telecontrol I sCS*
Protection*
SCADA*
(* Indicate if not applicable)
Consultant
Substations*
Cables*
OHL*
Protection*
KCT
Telecom*
Telecontrol / SCS*
Condition Monitoring*
SCADA*
Senior Sub-station Engineer
PH12-3G-78-48-R001 (Part-A)
1 ET-P20/F2 1 Issue : 3 114- 06 - 2012 NOSP -132/33kV RAS ABU FONTAS METRO
SUBSTATION
Electricity Transmission Department Incident Number: ~ C>
ON BEHALF OF CONTRACTOR:
ON BEHALF OF KAHRAMAA:
Date: