TUNNEL SPECIFICATION DETAILS TUNNEL QTY CALCULATION DETAILS 2.732
For CLASS D GROUND WATER DRAINAGE
After the deformation in the tunnel and after installing the Primary Rock support Where ever Dripping Water is encountered in the Crowniwalls during Excavation 300mm
system and additional 300mm Thick PCC lining shall be provided as Final additional Excavation shall be done to accommodate Waterproofing arrangement to Drain Out
Support/Lining over the water proof membarane. Ground Water and PCC Lining.