Dated : 08/09/2019
FINAL QUOTATION
FIRST FLOOR
Carpet Area (Sq.ft.) 1,000.00
FINAL QUOTATION
Sr.No. Item Amount ( Rs) Cost Per Sq.Ft.
I Civil & related works 677,225.00 677.23
II Carpentry and Interior work 761,375.00 761.38
IV Painting works 54,400.00
54.40
VI Electrification and Allied Work 734,650.00 734.65
B TOTAL 2,227,650.00 2,227.65
1 50 1,000 50,000
2 TV Unit Wall
5 Puja Area
a 2 jaali-CNC laser cutting with duco finish
b Base unit- 19mm ply in base storage finished in vineer with
mellamine polish.+ printing cost of glass.
6 Dining wall 1
a Using 1.5" x 1.5" batton for base framing, panelled withn 12mm
ISI Marka ply,teak strip on side panel ,finished in mellamine
polish.Centre design finished in Mirror and laminate in criss
cross pattern & gold strip in grooves.
7 Dining wall 2
a teak strip on side panel and slabs for artifacts finished in
mellamine polish
ii Similar to above but for providing and fixing 75mm high 100.00 R.ft 125 12,500
skirting/border.
iii (Dado) Wall Tiles in Bathroom Walls (till 8'-0") and Pantry ( 400.00 sqft 120 48,000
till 5 '-0"). Basic Rate- 45 Rs./ft.
5 Plumbing 0
a Toilets + Pantry Plumbing Fresh Water Pipes and Drain Pipe and 2.00 Lumpsu m 28,500 57,000
along with Labour. per toilet
d Exhaust Fan Pipe Work in Bathroom and Keratin Area 2.00 Nos. 3,500 7,000
e Shampoo Station Drain and Hot and Cold Point 2.00 Nos. 7,300 14,600
f Sanitary Ware for all the Bathrooms 1.00 L.s 25,000 25,000
i Men And Women Pedicure Basin 3.00 Nos. 8,500 25,500
7 Anti Termite Treatment 0
a Carrying out Pest control and antitermite treatment 1000 sq.ft. 7 7,000
0
2 Gypsum False Ceiling 1000 Sq.ft 95 95,000
a Gypsum Running Patta 200 Rft. 95 19,000
0
3 POP Wall Punning 1150 sqft 28 32,200
5 Doors 0
i doors 7 Nos. 12,000 84,000
i doors(toilets) 2 Nos. 9,500 19,000
6 Designer Section 0
3 Bridal Concept 1.00 L.S 135,000 135,000
5 Mens Section & women Sections Round Mirrors with Side 7.00 Nos. 35,400 247,800
Table in Sunmica
3 A.C Work
ii 2.0 Tr Mega Hi wall Unit. 4.00 Nos. 48,000 192,000
ii 1.0 Tr Mega Hi wall Unit. 3.00 Nos. 32,000 96,000
iii Supply of Copper refrigerant piping duly insulated with 145.00 Rmt 850 123,250
nitrile tube & supported.
iv Supply of Interconnecting electrical cabling b/w indoor & 145.00 Rmt 320 46,400
outdoor units.
v M.s Jall Platform Required Ouside to Hang Outdoor Units 1.00 L.S 35,000 35,000