The RIBA Plan of Work

organises the process of


briefing, designing, delivering,
maintaining, operating and
0 1 2 3 4 5 6 7
using a building into eight
stages. It is a framework for
all disciplines on construction
RIBA projects and should be Strategic Preparation Concept Spatial Technical Manufacturing
used solely as guidance for Definition and Briefing Design Coordination Design and Construction Handover Use
Plan of Work the preparation of detailed
2020 professional services and
building contracts. Projects span from Stage 1 to Stage 6; the outcome of Stage 0 may be the decision to initiate a project and Stage 7 covers the ongoing use of the building.

Stage Boundaries: Stage Outcome The best means of achieving Project Brief approved by the Architectural Concept Architectural and engineering All design information Manufacturing, construction Building handed over, Building used, operated and
Stages 0-4 will generally at the end of the stage the Client Requirements client and confirmed that it approved by the client and information Spatially required to manufacture and Commissioning Aftercare initiated and maintained efficiently
be undertaken one after confirmed can be accommodated on aligned to the Project Brief Coordinated and construct the project completed Building Contract concluded
the other. the site completed
If the outcome determines that The brief remains “live” during
Stages 4 and 5 will overlap a building is the best means of Stage 2 and is derogated in There is no design work in Stage 5 Stage 7 starts concurrently with
in the Project Programme achieving the Client Requirements, response to the Architectural Stage 4 will overlap with Stage 5 other than responding to Site Stage 6 and lasts for the life of the
the client proceeds to Stage 1 Concept on most projects Queries building
for most projects.
Stage 5 commences
when the contractor takes Core Tasks Prepare Client Requirements Prepare Project Brief Prepare Architectural Undertake Design Studies, Develop architectural and Finalise Site Logistics Hand over building in line with Implement Facilities
possession of the site during the stage including Project Outcomes Concept incorporating Engineering Analysis and engineering technical design Plan for Use Strategy Management and
Develop Business Case for Manufacture Building
and finishes at Practical and Sustainability Outcomes, Strategic Engineering Cost Exercises to test Asset Management
feasible options including Prepare and coordinate Systems and construct Undertake review of Project
Completion. Quality Aspirations and requirements and aligned to Architectural Concept
review of Project Risks and design team Building building Performance Undertake Post Occupancy
Stage 6 starts with the Spatial Requirements Cost Plan, Project Strategies resulting in Spatially
Project Budget Systems information Evaluation of building
handover of the building to and Outline Specification Coordinated design aligned Monitor progress against Undertake seasonal
Undertake Feasibility Studies performance in use
the client immediately after Ratify option that best delivers to updated Cost Plan, Project Prepare and integrate Construction Programme Commissioning
Agree Project Brief
Practical Completion and Project Strategies might include: Client Requirements Agree Project Budget Strategies and Outline specialist subcontractor Verify Project Outcomes
Derogations Inspect Construction Quality Rectify defects
finishes at the end of the – Conservation (if applicable) Specification Building Systems including Sustainability
Review Feedback from Source Site Information
Defects Liability Period.
– Cost Undertake Design Reviews information Resolve Site Queries as Complete initial Aftercare Outcomes
– Fire Safety previous projects including Site Surveys Initiate Change Control
– Health and Safety with client and Project required tasks including light touch
Stage 7 starts concurrently Procedures Prepare stage Design
– Inclusive Design Undertake Site Appraisals Prepare Project Programme Stakeholders Post Occupancy Evaluation
with Stage 6 and lasts for – Planning Programme Undertake Commissioning
the life of the building. Prepare Project Execution Prepare stage Design of building
– Plan for Use Prepare stage Design
– Procurement Plan Programme
– Sustainability
Programme Prepare Building Manual
Planning Note: See RIBA Plan of Work 2020 No design team required for Stages 0 and 1. Client advisers may be appointed Specialist subcontractor designs Adaptation of a building (at the
Overview for detailed guidance to the client team to provide strategic advice and design thinking before Stage are prepared and reviewed during Building handover tasks bridge Stages 5 and 6 as set out in the Plan for Use end of its useful life) triggers a new
Planning Applications on Project Strategies 2 commences. Stage 4 Strategy Stage 0
are generally submitted
at the end of Stage 3 and
should only be submitted Core Statutory Strategic appraisal of Source pre-application Obtain pre-application Review design against Submit Building Regulations Carry out Construction Comply with Planning Comply with Planning
earlier when the threshold Processes Planning considerations Planning Advice Planning Advice Building Regulations Application Phase Plan Conditions as required Conditions as required
of information required has during the stage: Initiate collation of health Agree route to Building Prepare and submit Discharge pre- Comply with Planning
been met. If a Planning and safety Pre-construction Regulations compliance Planning Application commencement Planning Conditions related to
Application is made Planning Information Conditions construction
during Stage 3, a mid- Option: submit outline
Building Regulations
stage gateway should be Planning Application Prepare Construction
Health and Safety (CDM)
determined and it should Phase Plan
See Planning Note for guidance on
be clear to the project team submitting a Planning Application Submit form F10 to HSE if
which tasks and deliverables earlier than at end of Stage 3
applicable
will be required.
See Overview guidance. Procurement Tender
Appoint
Traditional
Route
contractor
Appoint
Procurement: Design & Build 1 Stage ER CP contractor
The RIBA Plan of Work Appoint Appoint Appoint Appoint Facilities Management
is procurement neutral – Design & Build 2 Stage client team design team ER Pre-contract services agreement CP contractor and Asset Management teams, and
strategic advisers as needed
See Overview guidance for Management Contract Appoint
a detailed description of Construction Management contractor
how each stage might be Appoint
adjusted to accommodate Contractor-led ER Preferred bidder CP contractor
the requirements of the
Procurement Strategy. Information Client Requirements Project Brief Project Brief Derogations Signed off Stage Report Manufacturing Information Building Manual including Feedback on Project Feedback from Post
Employer’s Exchanges Health and Safety File and Performance Occupancy Evaluation
ER
Business Case Feasibility Studies Signed off Stage Report Project Strategies Construction Information
Requirements at the end of the stage Fire Safety Information
Final Certificate Updated Building Manual
Site Information Project Strategies Updated Outline Final Specifications
Contractor’s Practical Completion including Health and
Specification Feedback from light touch
CP
Proposals Project Budget Outline Specification Residual Project Strategies certificate including Safety File and Fire Safety
Post Occupancy Evaluation
Updated Cost Plan Defects List Information as necessary
Project Programme Cost Plan Building Regulations
Planning Application Application Asset Information
Procurement Strategy
Responsibility Matrix If Verified Construction
Information is required, verification
Information Requirements tasks must be defined

Core RIBA Plan of Work terms are defined in the RIBA Plan of Work 2020 Overview glossary and set in Bold Type. Further guidance and detailed stage descriptions are included in the RIBA Plan of Work 2020 Overview. © RIBA 2020