Activity Task Hazards Control Measure

1.Indending of 1. HOD (Logistics) indents 1. Trucks should be follow


trucks by CDS transporter trucks for loading & fit s details in HSS_1
to with its designation and approx ,Vehicle & Traffic Safety.
transporter weight. 2.Driver have experience &
2. Transport arrange trucks fit have DMC card as
for clinker loading. qualificatio
2.Prepartion of 1.Trucks are brought to main 1.Hit the body
trucks Gate where it weigh as Tare
Weight & recorded
2.Trucks should be checked and 2.Slip or fall
seal any gaps are there

3.Loading of 1. Trucks are brought to loading 1, Hit by vehicle


trucks by site and position (Near Clinker
claim shell Silo). 3. Hit by Material
2. Trucks stopped ,with wheel
choke ,de-energize with keys out 4.
and hand over to claim shell
operator.
3. loading done by claim Shell,
the bucket count will be
determinte of quantity of clinker
loaded.
4. After loading completed , the
trucks removes wheel chock ,
take out hand break ,and starts
trucks after obtaining keys from
operator.
4. Weightment 1. Trucks are brought to Main
of trucks in Gate weigh Bridge and weigh , if
Main Gate weight is higher than or less than
Weigh predetermined weight, it was
Bridge. again brought to loading site
,where either material has
remove or added .
2.when approximate weight is
obtained , the weight is recorded
as GROSS WEIGHT.
Invoice was made ,with weight
of clinker by difference of Gross
weight and tare weight
5.Covering of 1.Trucks are brought to tying
tarpaulin in station where covering was done
tying station. by tarpaulin to protect the
clinker.