UNLOADING OF RAW MTERIASL BY RAIL AT LCW

OBJECTIVE: - SOP FOR UNLOADING OF RAW MATERIAL S COMING IN R AIL BY MECHANICAL MEANS

SCOPE :- A) A PPLICABLE TO ALL PERSONS INCLUDING EMPLOYEE , CONTRACTOR LABOURS & THIRD PARTY .

B) IT INCLUDES ALL THE RAW MATERIAL INCLUDING FUEL , COAL PET COKE, LIMESTONE GYPSUM , ETC

DEFINATION & APPREVIATION

REPONSIBILITY

!. HOD ( PRODUCTION)- O VERALL RESPONSIBILITY FOR THE JOB , INCLUDING SUCTION OF MANPOWER .
2. INCHARGE MATERIAL HANDLING –RESPONSIBLE TO EXECUTE UNLOADING PLAN & SAFETY ASPECT DURING THE
JOB, UNDER THE GUIDELINES OF HOD ( P RODUCTION ).
3. YARD SUPERVISOR -CHECK THE WEIGHMENT , CLEAN THE TRACK AND WITH THE HELP OF POINTSMEN GUIDE THE
PLACEMENT OF WAGONS IN DESIGNATED TRUCK LINE AND ENSURE CLOSER THE WAGON SIDE GATE BEFORE IT LEAVE
PLANT

REQUIREMENTS

DO DON’T
1.COMMINUACTE TO CONCERN PARTY REGARDING RACK 1. START THE JOB BEFORE FDE GUIDE LINES ARE
LIKE CIVIL FOR PWI , ELECTRICAL FOR LIGHTS AND FOLLOWED WITHOUT JOB SPECIFIED PPE.
EOT CRANE MAINTENANCE 2. MOVE AROUND CLAIM SHELL WITHIN ITS OPERATING
2.CONDUCT RISK ASSESSMENT BEFORE STARTING JOB RANGE OF BOOM AREA .
3. TOOL BOX TALK MUST BE CONDUCTED.
4.E NSURE PROPER ILLUMINATION IN THE AREA OF 3.LET INEXPERIENCE PERSON OPERATION OF CLAM
WORK AND OUT SIDE SHELL , RESIDUAL CLEANING OR TARPAULIN REMOVAL
5.A LL THE PERSONS SHOULD HAVE ESSENTIAL PPE , ACTIVITY .
6. CIVIL ( PWI) SHOULD CHECK AND INSURE TRACTS
READY FOR RAIL MOVEMENT .
PROCEDURE

ACTIVITY TASKS CONTROL MEASURE


1.LOADED WAGAN FROM STATION 1.STATION MANAGER INFORMS 1.BEFORE START OF LOCA ,
BY OWN L OCO CDS ABOUT THE ARRIVAL OF OPERATOR SHOULD CHECK L OCO ,
LOADED WAGONS EXCHANGE POINTS , ESSENTIAL
TOOLD LKE WHEEL CHOKE EXTRA
2.CDS INFORM INCHARGE
MATERIAL HANDLING /YARD 2.L OCO OPERATOR FOLLOWING THE
SUPERVISION INSTRUCTION L OCO INSTRUCTIONS OF STATION MASTER
OPERATOR TO CARRY OUT WAGON REGARDING ENTRY AND EXIT AND
FROM LKE SHITIONG OF L OCO WITH LOADED
WAGONS .
3.FOLLOWING THE INSTRUCTIONS OF 3HOOTERS SHOULD BE USED WHILE
STATION MASTER , L OCO OPERATOR CROSSING CRITICAL BARRIER POINTS .
BRING LOADED WAGONS ACCORDING 4.PROPER COMMIUNATION
TO THE CAPACITY OF LOCO . THROUGH MOBILE OR WALKY TALKY .

4.BEFORE ENTRY THE PLANT, LO


SHOULD INFORM INCHARGE
MATEIAL HANDLING / Y ARD
SUPEVISIOR OF ARRIVAL OF
WAGANS .
2.2.P LACEMENT OF WAGONS IN 1.BEFORE PLACEMENT IN 1.SPPED BY THE LOCO SHOULD BE
DESIGNATED TRUCKS BY OWN L OCO DESIGNATED TRUCKS , WEIGHEMENT LESS THE 2 KM/ HRS , WHILE OFF
OF LOADED WAGONS ARE DONE IN LINE WEIGHMENT DONE .
RLY WB AND RECORED AS GROSS
WEIGNT . 2.BEFORE SEPARTE OFF THE
WAGONS FROM L OCO , WHEEL
2.PLACEMENT OF WAGONS ARE CHOCK SHOULD BE PLACED.
DETERMINED BY I NCHARGE BASED
NON THE TYPE OF MATERIAL A ND 3.WHILE PLACEMENT , A LL
SPACE AVAILABLE . CROSSING GATE SHOULD BE
LOCKED .
3.PLACEMENT DONE BY L OCO
OPERATOR WITH THE HELP OF 4.ENSURE PROPER SUPERVISION
POINTS AMAN AND YARD WHILE BP CLIMBING FOR REMOVAL
SUPERVISIOR AS PLANNED . TARPULINE .

4.IN SOME , RAKE TARPULINE 5.L OCAL SHOULD BE STOPPED


COVER IS THERE , IT IS TO BE MOVEMENT WHILE TARPULINE
REMOVED MANUALLY BY BP.,T WO REMOPVAL WORK UNDER PROGRESS .
LABOURS SIMUTANOSLY CLINBS BY
SIDE STIR LIFT THE TARPULINE AND
TUNN SIDE WISE , AFTER THE NYLON
ROBE.

3.E MPTY OUT WAGOANS THROUGH 1.ONCE LOCO GET SEPARATE OUT 1.WHILE OPERATING CLAIM SHELL
CLAIM S HELL CLAIM SHELL STARTS EMPTY OUT OR EOT, NO PERSONS ARR
MATERIAL FROM WAGONS , WHILE ALLOWED NEAR WAGONS WHICH IS
WAGONS LIES OUT OF COVERED UNLOADING GOING ON .
GANTRY WILL BE COVERED 2.ALL SAFETY MEASURES INCLUDING
2.WAGONS OF COAL AND PET COKE USE OF STANDARD TOOLS LIKE
WHICH WERE SHIFTED IN COVERED PHAWADE , RODS ETC TO BE USED.
GANTRHY WILL BE EMPTY OUT NY 3.STIRCLASE SHOULD BE USED TO
EOT CRANES. CLAIM INSIDE THE WAGONS AFTER
3.RESIDUAL CLANING OF LEFT OVER OPENING SIDE GATE
MATERIAL DONE MANUALLY BY 4.PERSONS OF RESIDUAL CLEANING
CONTRACTOR LABOURS BY OPENING JOB SHOULD ONLY BE ALLOWED
SIDE GATE OF WAGONS AFTER CLAIM SHELL BUCKET OUT
4.ONCE CLEANING JOB WAS AND SHOULD BE DULY INFORMED.
COMLITED CHECKING DONE BY THIRD
PARTY SUPERVISIOR .

4.R EMOVAL OF EMPTY WAGONS 1.ONCE ALL THE WAGONS OF


PARTICULAR L OT IS EMPTY OUT

Вам также может понравиться