OBJECTIVE: - SOP FOR UNLOADING OF RAW MATERIAL S COMING IN R AIL BY MECHANICAL MEANS
SCOPE :- A) A PPLICABLE TO ALL PERSONS INCLUDING EMPLOYEE , CONTRACTOR LABOURS & THIRD PARTY .
B) IT INCLUDES ALL THE RAW MATERIAL INCLUDING FUEL , COAL PET COKE, LIMESTONE GYPSUM , ETC
REPONSIBILITY
!. HOD ( PRODUCTION)- O VERALL RESPONSIBILITY FOR THE JOB , INCLUDING SUCTION OF MANPOWER .
2. INCHARGE MATERIAL HANDLING –RESPONSIBLE TO EXECUTE UNLOADING PLAN & SAFETY ASPECT DURING THE
JOB, UNDER THE GUIDELINES OF HOD ( P RODUCTION ).
3. YARD SUPERVISOR -CHECK THE WEIGHMENT , CLEAN THE TRACK AND WITH THE HELP OF POINTSMEN GUIDE THE
PLACEMENT OF WAGONS IN DESIGNATED TRUCK LINE AND ENSURE CLOSER THE WAGON SIDE GATE BEFORE IT LEAVE
PLANT
REQUIREMENTS
DO DON’T
1.COMMINUACTE TO CONCERN PARTY REGARDING RACK 1. START THE JOB BEFORE FDE GUIDE LINES ARE
LIKE CIVIL FOR PWI , ELECTRICAL FOR LIGHTS AND FOLLOWED WITHOUT JOB SPECIFIED PPE.
EOT CRANE MAINTENANCE 2. MOVE AROUND CLAIM SHELL WITHIN ITS OPERATING
2.CONDUCT RISK ASSESSMENT BEFORE STARTING JOB RANGE OF BOOM AREA .
3. TOOL BOX TALK MUST BE CONDUCTED.
4.E NSURE PROPER ILLUMINATION IN THE AREA OF 3.LET INEXPERIENCE PERSON OPERATION OF CLAM
WORK AND OUT SIDE SHELL , RESIDUAL CLEANING OR TARPAULIN REMOVAL
5.A LL THE PERSONS SHOULD HAVE ESSENTIAL PPE , ACTIVITY .
6. CIVIL ( PWI) SHOULD CHECK AND INSURE TRACTS
READY FOR RAIL MOVEMENT .
PROCEDURE
3.E MPTY OUT WAGOANS THROUGH 1.ONCE LOCO GET SEPARATE OUT 1.WHILE OPERATING CLAIM SHELL
CLAIM S HELL CLAIM SHELL STARTS EMPTY OUT OR EOT, NO PERSONS ARR
MATERIAL FROM WAGONS , WHILE ALLOWED NEAR WAGONS WHICH IS
WAGONS LIES OUT OF COVERED UNLOADING GOING ON .
GANTRY WILL BE COVERED 2.ALL SAFETY MEASURES INCLUDING
2.WAGONS OF COAL AND PET COKE USE OF STANDARD TOOLS LIKE
WHICH WERE SHIFTED IN COVERED PHAWADE , RODS ETC TO BE USED.
GANTRHY WILL BE EMPTY OUT NY 3.STIRCLASE SHOULD BE USED TO
EOT CRANES. CLAIM INSIDE THE WAGONS AFTER
3.RESIDUAL CLANING OF LEFT OVER OPENING SIDE GATE
MATERIAL DONE MANUALLY BY 4.PERSONS OF RESIDUAL CLEANING
CONTRACTOR LABOURS BY OPENING JOB SHOULD ONLY BE ALLOWED
SIDE GATE OF WAGONS AFTER CLAIM SHELL BUCKET OUT
4.ONCE CLEANING JOB WAS AND SHOULD BE DULY INFORMED.
COMLITED CHECKING DONE BY THIRD
PARTY SUPERVISIOR .