Well Design
Kedalaman pemboran total 4733.78 ft
I. Conductor Trayek
Kedalaman = 0 – 500 ft
Bit Size = 20”
Casing size = 16”
II. Surface Trayek
Kedalamaan = 0 – 2000 ft
Bit size = 14 ¾“
Casing size = 13 3/8”
III. Intermediet Trayek
Kedalaman = 0 – 4717.38 ft
Bit size = 12 ¼“
Casing size = 9 5/8”
IV. Shoe Track
Kedalaman = 16.4 ft

Menentukan volume suspensi semen trayek intermediet


Trayek Intermediete Casing
Penyemenan dilakukan sampai ke permukaan, maka :
1. Volume annulus casing – casing ( 9 5/8” inner casing ; 13 3/8 outer casing)
Kedalaman = 2000 ft
Kapasitas annulus casing – casing = 0.0622 bbl/ft (drilling data handbook)
V(casing – casing) = 0.0622 bbl/ft x 2000 ft
= 124 bbl
2. Volume annulus casing – hole annulus ( 9 5/8” casing ; 12 ¼ “ bit)
Kedalaman = 2717.38 ft
Kapasitas annulus casing – hole = 0.0558 bbl/ft
V(casing – hole) = 0.0558 bbl/ft x 2717.38 ft
= 151.62 bbl
3. Volume shoe track ( Diameter bit 12 ¼ “ = 1.02 ft)
Kedalaman = 16.4 ft
π
Vshoe track = x (Dbit)2 x kedalaman
4
π
= x (1.02 ft)2 x 16.4 ft
4
= 2.38 bbl
4. Volume excess open hole
= 50% x V(casing – hole)
= 50% x 151.62 bbl
= 75.81 bbl
5. Volume suspense semen total
= V(casing – casing) + V(casing – hole) + Vshoe track + Volume excess open hole
= (124 + 151.62 + 2.83 + 75.81) bbl
= 354.26 bbl
= 14878.92 gal
= 2380.62 cuft

Menentukan Volume Suspensi Semen untuk Lead dan Tail Slurry


1. Volume lead slurry
Kedalaman = 0 – 2000 ft
Volume lead slurry = V(casing – casing) = 124 bbl
2. Volume tail slurry
Kedalaman = 2000 – 4733.78 ft
Volume tail slurry =
= V(casing – hole) + Vshoe track + Volume excess open hole
= (151.62 + 2.83 + 75.81) bbl
= 230.29 bbl

Menentukan sack semen yang dibutuhkan


Volume slurry = 2380.62 cuft
Yield slurry = 1.22 cuft/sack (based on API standard untuk class A)
Jumlah sack semen yang dibutuhkan
Volume Slurry
=
Yield Slurry
2380.62 cuft
= 1.22cuft /sack
= 1951.33 sack