Вы находитесь на странице: 1из 3
JICA Assisted Yamuna Action Plan Project (III) JICA Loan No. ID-P 215 —— NJS Consultants Co., Ltd. (Japan) Rega, Office: 1-44, Shibaura, home Minato-ca, Tokyo-105-0023, sw ne-consultants com, Tel 81-9-6324-434, Fax 1-3-6324-4345 ‘TRANSMITTAL SHEET TS Ref, No. PMCIYAP-II/ DIB/K3/2020/495 Date26" February” 2020 Project Name ‘Rehabilitation and Up-gradation of Kondliz Phase I (45.5 MLD), Phase II (113.7 MLD) & Phase HI (45.5 MLD) Wastewater Treatment Plant (WWTPa) with effluent standards of BOD -10 mg/l, TSS - 10 mg/l or better under YAP (III) In Consortium with ‘AECOM India Pvt. Ltd. ‘TTI Consulting Engineers India Pvt. Ltd. NJS Engineers India Pvt. Led. Executing Agency /Client | Delhi Jal Board, Delhi (Contractor Mis Triveni Engineering & Industries Lid.~ GST Envo Lid- M/s Gharpure Engineering & Construction Pvt. Ltd.JV) To, CC Client Address ‘The Executive Engineer (C) DRIX ‘The Executive Engineer (SDW) IV Delhi Jal Board (Govt. of NCT of Delhi) | Delhi Jal Board (Govt. of NCT of Delhi) Jagriti Pump House, Near Karkardooma | Kondli STP, Near Mayur Vib, Phase-II, Crossing, Shahdara, Delhi ~ 110 092 Dethi-110 096 E-mail: eeedr9ram@gmaiLcom E-mail: eesdw4.dib@nic.in Ref. Contractor Letter. No, | 3.1/PXD1320/DJB-Kondli/STP/D&B/6S3- 17/02/2020 654-655-656 Ref, DIB Letter No. Nil Nil Sub Document Revision | Recommended Category 1. PXD-1320-13-113-A02 (1 Document) o “co Sub. Document Reference | > pxpp.1320-13-113-B02 (2 Sheets) a “cr 3. PXD-1320-13-113.C02 (1 Sheet) o “ 4, _ PXD-1320-13-113-D02 (1 Sheet) a “or I. Design Calculation of Plant Water Sump near CCT for Phase - T (10 MGD) ‘Wastewater Treatment Plant (PXD-1320-13-113-A02) (Total - 1 Document) 2. Civil GA & RIF Details of Plant Water Sump near CCT for Phase - I (10 MGD) Wastewater Treatment Plant (Civil GA of CCT Showing) (PXD-1320-13-113-B02) (Total - 2 Sheets) Civil RUF Details of Plant Water Sump near CCT for Phase - I (10 MGD) Wastewater Treatment Plant (VE Details of CCT Showing) (PXD-1320-13-113-C02) (Total - 1 Sheet) 4, Arch. Details of Plant Water Sump near CCT for Phase - I (10 MGD) Wastewater ‘Treatment Plant (R/F Details of CCT Showing) (PXD-1320-13-113-D02) (Total - 1 Document Subject Tite 3. Sheet = Document Receiving Date | 19/01/2020 aos Review Date 26102/2020, EES Zip Reviewed b; ‘Mr. Rajat Garg Te SY, Enclosure: PMC Comments Sheet Aitached (2 Pages) ; ‘Approved by S$ Suraj Aggarwal Deputy Project Manager ‘Aeknowledgement (Received the above) Note: Recommended category description Category Description “A”. ‘Recommended for Approval “Br. ‘Recommended for Approval subject to incorporation of comments as marked “Cr. Returned with comments & resubmission required. =D. ‘Retained for Information onl ‘roject Ofie: 404, 4 Foor, 12 Gagandasp Building, Rajendra Place, New Delhi 110 008, CIN: F03629 Package K3 Design Calculation of Plant Water Sump near CCT for Phase-I | PXD-1320-13-113-A02 | (Rev. -1) (10 MGD) Wastewater Treatment Plant Civil GA & RF Details of Plant Water Sump near CCT for | PXD-1320-13-113-B02 | (Rev. -I) Phase - I (10 MGD) Wastewater Treatment Plant (Civil GA of CCT Showing) (2 Sheet) Civil R/F Details of Plant Water Sump near CCT for Phase - | PXD-1320-13-113-C02 | (Rev. -1) (10 MGD) Wastewater Treatment Plant (R/F Details of CCT Showing) (1 Sheet) 4, | Arch. Details of Plant Water Sump near CCT for Phase - I (10 | PXD-1320-13-113-D02 | (Rev. -1) MGD) Wastewater Treatment Plant (R/F Details of CCT Showing) (1 Sheet) ‘Comments Sheet (TS Ref No PMC/Y AP-II/DJB/K3/2020/475) “Triveni reply dated 17- | PMC Observations Dated 26- SNo. PMC Observations (Rev. 0) 02-2020 (Rev. 1) 02-2020 (Rev. 1) Design Calculation PXD-1320-13-113-A02 1. [As per Page No 800 of CA, Cl 3.3] Compliance not | As discussed during the meeting (xxxvi), All Control Room & Pump | submitted. held on 06-02-2020. Please Houses shall be provided with toilet of incorporate the Toilet block minimum size of 3m x 2m accordingly separately and submit the the drawings along with design drawing of toilet block. calculations. 2 [As per the design calculations cl 44, Not incorporated. Design of walls, 33% increase in permissible stresses duc to EQ effect is allowed. Please clarify? ES In Moment calculations, Add May along with Mx & My. a In Seismic calculations, Sizes of sump is not considered as per actual sizes. Drawing PXD-1320-13-113-B02 3. [Polythene sheet of 1 Kgim2 shall be | Compliance not | Not incorporated. provided. submitted. 6 [Ramp shall be provided along with Not incorporated. Rolling shutter. 7. | Modify the drawing as per Comment No ‘See reply of Point no 1 1 Drawing PXD-1320-13-113-CO2 8, _ | In Base Slab, Bottom reinforcement of 10 | Compliance not | Not incorporated. dia @200 c/e (B/W) shall be provided. _| submitted. 9, | In Wall WIS, outer reinforcement shall be [ Not incorporated 10#@200 +10#@200. | 10. | In BRS, Main Reinforcement shall be 3- Not incorporated. 20% instead of 3-16%, 3-10% vertical stirrups shall be provided. Page 1 of 2 Triveni reply dated 17- | PMC Observations Dated 26- So. PMC Observations (Rev. 0) 02-2020 (Rev. 1) 02-2020 (Rev. 1) Drawing PXD-1320-13-113-D02 Il. _| Revise drawing as per comment No 1. ‘Compliance not 12. | Plinth protection shall be shown on boih | submitted ‘Not incorporated | side of de chlorination chamber. 13. | As per CA, Flooring in Pump House shall ‘Not incorporated bbe cement concrete flooring with metallic hardener topping. 14, | As per CA, dado of 2.1 m high irom Hoor Not incorporated. in glazed ceramic tiles of size 300mm x 200 mm shall be provided. TS, | Notes shall be provided relevant to this Not incorporated building. Notes related to other building shall not be provided. 6 As per CA, Provide Stainless steel cat ladder to non accessible roof top of building. Change Elevations according Note: ‘All design and drawings and construction shall be in fall compliance with the requirement of contract specifications including addendum and corrigendum. Recommendation: | Category “C”: Returned with comments & Resubmission required. Raat Gog (Rajat Garg) Page 2 of 2

Вам также может понравиться