Nominal

BTS Planned Planned


BTS Current Batch
Priority List Cell Name SITECODE SITENAME Customer Code BSC Configuration A-bis Links today A-bis Links End of Ph3 BSC Load Implementation Remarks
Configuration Number
in phase 3 Date
Grey AARNAIZ_1 HW completed - antenna to be
01MBD004 CityLand Dela Rosa Condo AARNAIZ JGSUMMIT_1 S222 S444 OK OK OK 6 6/4/2004
Black AARNAIZ_3 replaced
Black BANGKAL_3 01MAK018 South Star Plaza BANGKAL JGSUMMIT_1 S222 S444 OK OK OK 7 6/8/2004 Done
HW completed - transmission
Black DELAROSA_1 01MBD013 Shangrila Hotel DELAROSA JGSUMMIT_1 S111 S444 OK OK OK 6 6/4/2004
pending
Grey FTI_1 01TGG001 Sunshine Plaza Mall FTI JGSUMMIT_2 S222 S444 OK OK OK 6 6/4/2004 Done
Contractual Upgrade HW completed - transmission
Black LAPAZMLA_2 01MAK012 Mervin II Bldg. LAPAZMLA RPR2 S222 S444 OK (reconfigure multidrop) NOK(*) 6 6/3/2004
MAK001 to RPR pending
Grey OLYMPIA_2
01MAK001 KBC Bldg. OLYMPIA RPR2 S322 S444 OK OK NOK(*) 6 6/3/2004 Done
Black OLYMPIA_3
Black PLAINVIEW_3 01MDY003 Matriano's PLAINVIEW RPR2 S222 S444 OK OK NOK(*) 6 6/3/2004 HW completed - Abis rehosting
Grey SUCATRD_2 01PQY007 8414 Bldg. SUCATRD JGSUMMIT_2 S222 S444 OK OK OK 7 6/8/2004 Done
Contractual Upgrade
Grey URBANAVE_1 01MBD008 Federal Hardware Water Tank 2 URBANAVE JGSUMMIT_1 S111 S444 OK MAK009 to MAK917 and OK 6 6/4/2004 Done
MAK917 to MAK021
Grey WILSON_2 01SNJ101 Elt Bldg. WILSON LIBIS1 S223 S444 OK OK NOK(*) 7 6/7/2004 Done
black SANMARTIN_3 01MTP201GI Solid City Compound SANMARTIN JGSUMMIT_2 S222 S444 OK OK OK 7 7/8/2004 Done
Contractual Upgrade.
Villamor to Sunshine (4x2) to
black MALIBAY_3 01PSY002 Reanns bldg. MALIBAY JGSUMMIT_2 S222 S444 OK OK implementation ongoing
(16x2) & Sunshine to Molave
(4x2) to (16x2)
Contractual Upgrade. JKN to
Jacinto (8x2) to (16x2) &
black DRAGONFLY_1 01OTG001 IDC Building DRAGONFLY LIBIS3 S111 S444 OK OK implementation ongoing
Jacinto to DSS (8x2) to
(16x2).
Non Nominal - Digitel

Priority BTS Current


Week Cell Name SITECODE SITENAME Customer Code BSC Remarks
List Configuration

22 Black WESTRIANGLE_2 01QZN029 Outcom Billboard WESTRIANGLE LIBIS2 S222 done on June 4
22 Black REMEDIOS_3 done on June 4
22 Black REMEDIOS_1 01EMT002 Dolores Bldg REMEDIOS RPR2 S111 done on June 2
22 Black PAZGUAZON_1 01PDC001 Honda Cars Manila PAZGUAZON RPR2 S112 done on June 2
22 Grey PADREFAURA_3
01EMT001 Equitable Bank Ermita PADREFAURA done on June 2
22 Black PADREFAURA_2 RPR2 S111
22 Grey MAKATIAVE_3
01MAK003 The Atrium Bldg. of Makati MAKATIAVE done on June 2
22 Black MAKATIAVE_1 JGSUMMIT_1 S333
22 Grey PEREA_2 01MAK201 Mayfair Mansion PEREA JGSUMMIT_1 S433 done on June 14
23 Black BCDA_3 01MAK402 BCDA BCDA JGSUMMIT_1 S111 done on June 20
24 Black DONARODRIGUEZ_2 01NML002 Mariwasa Sales Corp. Bldg DONARODRIGUEZ LIBIS2 S111 done on June 24
25 black NAGA1_1 02NAA001 Digitel Site - Naga City NAGA1 NAGA S222 done on July 12
25 black TAMBO_1 01PQY008 Yotolvo Corporation TAMBO JGSUMMIT_2 S111 TRE still not operational
26 MASAMBONG_1
Black 01QZN026 Queen Bee Garment Factory MASAMBONG LIBIS4 S121 done on July 14
26 MASAMBONG_3
Non Nominal - Alcatel

Priority BTS Current Proposed New BTS Equipment needed


Week Cell Name SITECODE SITENAME BSC A-bis Links today A-bis Links End of Ph3 BSC Load BTS and PS Contractual Item Comment Digitel Implementation
List Configuration Reconfiguration (not in the contract)

22 Black ROXASDIST_1 01QZN001 Digitel Tel-Off LIBIS2 S444 S777 OK OK OK ADBAVE (S444 to S777) none OK on hold - HR trial
Contractual Upgrade MTP201
22 Additional PRESSDRIVE_2 31PQY304 SITE 14 JGSUMMIT_2 S111 S222 OK OK SANCHEZMIRA (S111 to S222) none OK done
to PQY007
Contractual Upgrades
22 Additional MARTINEZ_3 MAK011 to MAK019 and
MAK019 to MAK003
31MDY301 CTF TOWER RPR2 S111 S222 OK OK BAGONGSILANG (S111 to S222) none Implemented on 04/06/2004 OK done
Non Contractual Upgrades
22 Black MARTINEZ_2 MAK003 to MBD002 and
MBD002 to JGSUMMIT
22 Grey JABONEROS_2 01BBD019 474 Bldg RPR2 S111 S444 OK OK NOK(*) GENSEGUNDO (S111 to S444) none OK done
Fernandina Condominium (Suites
22 Black GENMCARTHUR_1 01CBO001 LIBIS2 S222 S444 OK OK OK QPAREDES (S222 to S444) none OK done
Hotel)
Non Contractual upgrade
22 Black CUPANG_1 01MTP101 RB Building JGSUMMIT_2 S444 S777 OK OK GUADIXDRIVE (S444 to S777) none OK on hold - HR trial
MTP101 to PQY007
Non Contractual upgrade
22 Grey COMMERCEAVE_1 01MTP002 NOL Tower JGSUMMIT_2 S444 S777 OK OK UNITED (S444 to S777) none OK on hold - HR trial
MTP101 to PQY007
OK (reconfigure current config S222/ upgrade to
22 Grey CAVITECITY_1 02CVT001 Digitel Site - Cavite City CALAMBA_2 S111 S444 OK (reconfigure multidrop) OK none OK
multidrop) S444 not necessary
22 Grey CABUYAOLGN1_3
02CYO001 Alcasaba's Lot CALAMBA_1 S111 S444 OK OK OK ADELANTADO (S111 to S333) none OK done
22 Grey CABUYAOLGN1_1
22 Grey ANGELES2_3 02ANL002 PG Pawnshop BALAGTAS_2 S222 S444 OK OK OK C5ROAD (S222 to S444) none OK HW completed - to remove multi drop
TRX Upgrade is possible without transmission
Non Contactual Upgrade: Non Contactual Upgrade:
23 Black PSCOVAL_3 01PSG101 Oval Track Light Tower A LIBIS3 S112 S444 OK STAMONICA none upgrade but the rule of 25% of spare capacity is OK done. 07082004
01PSG017-01PSG001 01PSG017-01PSG001
not fulfilled

Contractual Upgrade Temporarily Guillermo Bldg. is homed to


(01PSY005-01TGG001 (4x2 JG.Summit BSC where MW radio is still have
Approved WORAP TRE UPGRADED / For Abis
25 black CRIVERA_2 01BLR001 Guillermo Bldg JGSUMMIT_2 S322 S444 OK (temporarily) to 16x2), 01TGG001- OK BARITAN (S222 to S444) NONE enough capacity and BTS can be upgraded, but
received 07/12/04 rehosting
01PQY003 (4x2 to 16x2) after when it is homed to Molave BSC, the links must
it is homed to Molave BSC be upgraded

Contractual upgrade
Contractual upgrade TRE upgrade can be accommodated after the
(01MRK005-01MRK003 Approved WORAP TRE UPGRADED / Contractual
25 black SANMATEORZL2_3 02SMO002 Digitel Site - San Mateo LIBIS2 S111 S444 (01MRK005-01MRK003 (4x2 OK NARRABLVD(S111 to S444) NONE contractual upgrade of the link, remove multidrop
(4x2 to 8x2)) end of received 07/12/04 E1 upgrade
to 8x2)) end of Phase 3. between 01SMO002 and 02ROD001
Phase 3.
Connection via cable, no MW radio, remove
Approved WORAP TRE UPGRADED / Multidrop to
25 black XROBGALMALLA_2 01PSG904_A Robinson's Galleria Mall_A LIBIS1 S211 S444 OK OK OK TUNASAN(S112 to S444) NONE multidrop between 01PSG904IA and
received 07/12/04 be removed
01PSG901IA
S121 1 CS03, 1 TRAD
No nearest contractual item. BTS type(MB01)
25 black OK OK none ON HOLD ON HOLD
can only accommodate 6 TREs maximum
MULTINATIONAL_2 31PQY302 OCHOA REALICA BUILDING JGSUMMIT_2 S111 OK
Approved WORAP
25 black DONE 07/14/04
PHILCOA_1 received 07/09/04
31QZN307 PHILIPPINE COCONUT AUTHORITY LIBIS2 S111 S222 OK OK OK JPANGANIBAN(S111 to S222) NONE
Approved WORAP
25 black DONE 07/14/04
PHILCOA_2 received 07/09/04
S112 none 1 CS03, 1 TRAD
No nearest contractual item. BTS type(MB01)
25 black UPDILIMAN_3 31QZN308 VIRATA HALL LIBIS2 S111 OK OK ON HOLD ON HOLD
can only accommodate 6 TREs maximum
OK
OK. Bts
Approved WORAP TRE UPGRADED/Multidrop to
26 Grey AGNO_1 01ALA002 Orden's Lot JGSUMMIT_2 S222 S444 OK. OK. cutover(TSU14 , APLAYA(S222 to S444) none
received 07/09/04 be removed
PCM3)
OK. Bts
Approved WORAP
26 Grey BFHOMES_1 01PQY006 Mars Square Bldg. JGSUMMIT_2 S222 S444 OK. OK. cutover(TSU10, LIFEHOMESUBD(S222 to S444) none DONE 07/12/04
received 07/09/04
PCM3)
OK. Multi-drop between
OK. Multi-drop between
01QZN031 and OK. Bts Approved WORAP TRE UPGRADED/Multidrop to
26 Black CUBAO_1 01QZN031 ACT LIBIS2 S121 S444 01QZN031 and 31QZN301 SIGNALVILL(S111 to S444) none
31QZN301 must be cutover(TSU4, received 07/09/04 be removed
must be taken out
taken out PCM4)
NO.(01QZN031-01QZN004
(4x2 to 8x2), 01QZN004- Approved WORAP
26 Black GILMOREAVE_3 01NML001 Seneca Plaza LIBIS2 S111 S444 OK. OK KALAWAAN(S111 to S444) none DONE 07/14/04
01QZN028 (8x2 to 16x2) received 07/09/04
non-contractual upgrade
Approved WORAP TRE UPGRADED/Multidrop to
26 Black STATERESITA_1 01QZN021 CTK Inc. LIBIS2 S123 S444 OK. OK. BALIUAG3(S222 to S444) none
received 07/09/04 be removed

OK.02TGU503-02ENL001
(4x2 to 8x2), 02ENL001-
02RMA508 (4x2 to 8x2),
02RMA508-32SMS501 (new
link 16x2), 32SMS501-
Approved WORAP implementation ongoing/ target
26 Grey TUGUEGARAO1_2 02TGU001 JC Comm. Bldg SANTIAGO_CITY S111 S444 OK. 02TMI001 (new link 16x2), OK MARAGONDON(S111 to S444) none
received 07/09/04 date July 20
02TMI001-02ILN502 (4x2 to
16x2), 02ILN502-02SAO001
(new link 16x2), 02SAO001-
02SGO001 (new link
16x2).contractual upgrade

27 black EASTKAMIAS_1 31QZN301 AJ BLDG. Approved WORAP implementation ongoing/ target


LIBIS2 S111 S222 OK OK BINANGONAN2(S111 to S222) none
27 black EASTKAMIAS_3 31QZN301 AJ BLDG. received 07/16/04 date July 20
28 black MARIKINAHTS_3 01MRK004 Lagman's Lot LIBIS2 S211 S444 OK OK None LOS BANOS(S111 to S444) none Waiting Work Order Approval PM-EP # 639-04