Вы находитесь на странице: 1из 6

Doc. No. Reconstruction Of The International Airport Astana Prep.

By:
MATERIAL REQUISITION FOR FLOW METERS Rev.: 0

1. SCOPE

This document covers the technical and commercial requirements for the flow
metering and registering instruments to be installed in the fuel supply system
within the scope of Reconstruction of the International Airport Astana.

2. DEFINITIONS

Project: Reconstruction of The International Airport Astana

Employer: Ministry Of Transportation and Communication

Engineer: Pacific Consultant Engineering

Contractor: Alsim Alarko Sanayi Tesisleri ve Ticaret A.S acting as the


partner in charge of Siemens-Marubeni-Laing-Alarko Consortium (SMLA)

Bidder: Manufacturer, supplier, dealer or subcontractor who is invited by the


Contractor to bid for a certain procurement package, by receiving a formal
invitation letter and a material requisition (MR) document.

Supplier: The Bidder becomes the Supplier when his Bid is accepted and a
Purchase Order or a Supply Agreement is made between the Bidder and the
Contractor.

Third Party Inspector: Parties which will be nominated by the employer or


by the contractor to test, inspect, witness or expedite manufacturing process.

Bid: Technical and commercial proposal presented by the bidder including


all the requirements of this document.

Contract: The main Contract between the Employer and the Contractor.

3. TECHNICAL REQUIREMENTS

Applicable technical contract documents and specifications are included in


Appendix I.

The supplier is responsible to supply a copy of the latest revision of the


international standards referred in their engineering design documents.

4. COMMERCIAL REQUIREMENTS

Applicable commercial contract documents are presented in Appendix II.

Page 1 / 6
Doc. No. Reconstruction Of The International Airport Astana Prep.By:
MATERIAL REQUISITION FOR FLOW METERS Rev.: 0

APPENDIX – I

1. GENERAL REQUIREMENTS AND SPECIFICATIONS

General requirements related with the manufacture and supply of the flow
meters shall include:

1.1. Operating Temperature:

The flow metering and registering instruments within the scope of this
specification shall in all respects be suitable for reliable and continuous
operation in the service conditions at the Astana Airport.

Operating and design temperature range for the instruments shall be:

Low: -40°C

High: +50°C

1.2. Operating Pressure:

Operating pressure of the system is 10 barg.

Pressure design of the meters and their components shall be made


according to ASME Pressure Vessel Code Sec. VIII Div.1.

1.3. Operating Medium:

The operating medium for each flow metering instrument is given in


Appendix II.

1.4. Material:

Material offered by the Bidder shall be suitable for operation in the


above mentioned temperature range. Some of the materials referred to
in this material requisition may be used along with extra impact testing
specified in ANSI B 31.3 for low temperature utilisation of steel
material.

Page 2 / 6
Doc. No. Reconstruction Of The International Airport Astana Prep.By:
MATERIAL REQUISITION FOR FLOW METERS Rev.: 0

2. CONSTRUCTION

2.1. Operating Principle:

The flow meters within the scope of this specification shall be positive
displacement type with mechanical head. The medium being measured shall
move a rotor, placed in a measuring chamber, with vanes vertically placed
with respect to the flow direction. The fluid, while moving through the
measuring chamber, forces the vanes, made of self-lubricating material,
against the internal surface of the measuring chamber, hence minimises the
product leakage and turns the rotor.

The rotor shaft shall protrude from the chamber cover and connect,
through a calibration mechanism to the mechanical meter. Couplings shall be
magnetic drive.

2.2. Materials:

Body : ASTM A 53 Gr.A or B SCH 40 or ASTM A 216 Gr.WCB (along


with low-temperature impact testing) or ASTM A 333 Gr.6
Sch40 or ASTM A 352 LCB or ASTM A 516 Gr.55 or Gr.60

Flange : ASTM A 105 or A 106 Gr.WCB (along with low-temperature


impact testing) or ASTM A 420 WPL-6 or ASTM A 350 LF2

Rotor : Cast Iron Meehanite or approved equivalent

Vanes : Teflon

Gaskets : CAF

2.3. Installation:

Meters shall be installed in-line and horizontally.

2.4. Meter:

The meter shall be capable of recording and displaying the total


quantity of the medium transferred for each transaction in liters. The
main display shall have a display of 5 digit length and shall display the
quantity to the nearest deciliter (1/10 liter). The main display shall be
resetable through a knob located on the meter body. Furthermore,
each meter shall have a non-resetable register for recording the total
quantity of liquid that has passed through the meter.

3. ACCURACY:

The meters shall be accurate to ±0.2 % of the metered value.

Page 3 / 6
Doc. No. Reconstruction Of The International Airport Astana Prep.By:
MATERIAL REQUISITION FOR FLOW METERS Rev.: 0

4. SIZING AND CONNECTIONS:

The Bidder shall calculate the required size for the flow rates mentioned in
Appendix II hereto. The sizes given are for reference only.

The connecting flanges shall be sized and drilled as per ANSI B16.5.

5. CERTIFICATION:

Materials certificates in accordance with BS EN 10204/DIN 50049 are


required for all components and, as a minimum, shall include:

a. Chemical analysis by heat for metallic parts (material supplier’s reports)

6. DOCUMENTS TO BE PROVIDED WITH THE BID:

Following documents shall be provided by the Bidder for presentation to the


Engineer:

a. Material specifications including compliance certificates for non-metallic


parts.
b. Statement of compliance to this specification.
c. Statement of conformance to minimum temperature limit.
d. Statement of conformance to hazardous zone application.

7. MARKING:

Each flow meter shall be marked with a 100mm x 100mm stainless steel tag
plate. Pressure class and connection size shall be clearly marked on the tag
plate.

1. Supplier
2. Connection size
3. Max. Flow Capacity (m3/h)
4. Maximum Pressure (Barg)
5. Pressure Design Standard
6. Tag number

8. FLANGE PRESERVATION AND SHIPMENT:

Supplier shall insure that the flange finishes are protected from damage
during shipping and storage. The ends of socket, threaded and weld ends
fittings and flanges shall be protected by securely fastened tight fitting plastic
caps.

The meter heads shall be shipped separately from the flow meters and shall
be packed securely against impacts.

Page 4 / 6
Doc. No. Reconstruction Of The International Airport Astana Prep.By:
MATERIAL REQUISITION FOR FLOW METERS Rev.: 0

9. OPERATION AND MAINTENANCE MANUALS:

Installation and maintenance manuals for the flow meters shall be provided
by the Supplier in digital format and three fold hard-copies.

10. SPARE PARTS:

10.1 Provision

The Bidder shall prepare a comprehensive list of spare parts including


prices necessary for flawless operation and maintenance for a period of
2 years.

10.2 Availability

The Bidder shall confirm in writing that spare parts for the suggested
equipment will be available for a minimum of twelve years following sale.

11. SPECIAL TOOLS:

Where special tools are required to operate and maintain any part of the
supplied equipment, the Supplier shall provide two sets of such tools with
casing. List of special tools shall be prepared by the Supplier and shall be
subject to the approval of the Engineer.

Page 5 / 6
Doc. No. Reconstruction Of The International Airport Astana Prep.By:
MATERIAL REQUISITION FOR FLOW METERS Rev.: 0

APPENDIX-II

COMMERCIAL DOCUMENTS

1. BID BASIS

The Bidder will propose their best prices, best possible delivery, transport and
payment.

2. SCOPE OF SUPPLIES AND PRICES

The following Bill of Quantities is tentative, subject to be revised with final


detailed design documents.

FLOW RATE
S/N DESCRIPTION TAG NUMBER MEDIUM SIZE
(m3/h)
1 FLOW METER FIQ-101 JET A-1 120 6”
2 FLOW METER FIQ-106 JET A-1 30 4”

3. COMPLIANCE STATEMENT
The Bidder shall certify submittals forwarded to SMLA with the following
certifying statement: "I hereby certify that the (equipment) (material) (article)
shown and marked in this bid is that proposed to be incorporated with Astana
Airport Reconstruction Project, is in compliance with the attached specification
and is submitted for the SMLA approval”.

Certified by Bidder _____________________, Date _______


(Signature)

If there is discrepancy between bid and specification, Bidder shall clearly


mention in this statement.

Bidder must sign and stamp all the pages of specification and its attachments
and provide with the compliance statement.

Bids submitted without compliance statement and signed and stamped


specification will not be evaluated.

Page 6 / 6

Вам также может понравиться