MATERIAL REQUISITION FOR FLOW Rev.: 0
SWITCHES
1. SCOPE
This document includes the technical and commercial requirements for flow
switches within the scope of Reconstruction Of The International Airport
Astana.
2. DEFINITIONS
Supplier: The Bidder becomes the Supplier when his Bid is accepted and a
Purchase Order or a Supply Agreement is made between the Bidder and the
Contractor.
Bid: Technical and commercial proposal presented by the bidder including all
the requirements of this document.
Contract: The main Contract between the Employer and the Contractor.
3. TECHNICAL REQUIREMENTS
The supplier shall deliver the digital (electronic) files of all engineering
documents (including installation operation and maintenance manuals, where
applicable) in all transmissions (i.e. from the initial “for approval” versions until
“as-built” stage.
4. COMMERCIAL REQUIREMENTS
Applicable commercial contract documents are presented in Appendix II.
Page 1 / 5
Doc. No. Reconstruction Of The International Airport Prep.By:
Astana
MATERIAL REQUISITION FOR FLOW Rev.: 0
SWITCHES
APPENDIX – I
All flow switches under the scope of this specification shall in all respects be
suitable for reliable and continuous operation in the service conditions at the
Astana Airport.
Low: -40°C
High: +50°C
1.2. Effluent:
2. CONSTRUCTION:
2.2. Connection:
Size of the process line on which the instrument will be mounted is listed in
Appendix II. The Bidder shall clearly indicate the size and type of the
intermediate piece required to be installed on the process line for each
instrument in his bid.
2.2. Paddle:
Page 2 / 5
Doc. No. Reconstruction Of The International Airport Prep.By:
Astana
MATERIAL REQUISITION FOR FLOW Rev.: 0
SWITCHES
2.3. Sensitivity:
A flow switch shall be supplied with two outputs. NO (not open) and NC (not
closed)
2.5. Protection:
The flow switches and terminal boxes provided shall be explosion-proof and
suitable for operation in Zone 0 as per CENELEC/IEC and Class I Division 1
as per NEC 505. Marking shall be EEx ed IIA T3.
3.1. General:
Check analysis shall be carried out for materails used for indicator-
transmitters.
4. MARKING:
Page 3 / 5
Doc. No. Reconstruction Of The International Airport Prep.By:
Astana
MATERIAL REQUISITION FOR FLOW Rev.: 0
SWITCHES
5. DOCUMENTATION:
Supplier shall insure that the connection threads are not damaged during shipment.
Page 4 / 5
Doc. No. Reconstruction Of The International Airport Prep.By:
Astana
MATERIAL REQUISITION FOR FLOW Rev.: 0
SWITCHES
APPENDIX-II
COMMERCIAL DOCUMENTS
1. BID BASIS
The Bidder will propose their best prices, best possible delivery, transport and
payment.
Data Sheets for the below listed pumps are attached to this Material Requisition.
3. COMPLIANCE STATEMENT
The Bidder shall certify submittals forwarded to SMLA with the following certifying
statement: "I hereby certify that the (equipment) (material) (article) shown and
marked in this bid is that proposed to be incorporated with Astana Airport
Reconstruction Project, is in compliance with the attached specification and is
submitted for the SMLA approval”.
If there is discrepancy between bid and specification, Bidder shall clearly mention in
this statement.
Bidder must sign and stamp all the pages of specification and its attachments and
provide with the compliance statement.
Bids submitted without compliance statement and signed and stamped specification
will not be evaluated.
Page 5 / 5