METHOD STATEMENT FOR BOLT Revision : 0


AND NUT FASTENERS Prepared : 20th
RECTIFICATION WORK March 2019

CONTENTS

1.0 SCOPE
2.0 SAFETY
3.0 PLANTS, EQUIPMENTS AND MANPOWER
4.0 WORK PROCEDURE
Page No :
METHOD STATEMENT FOR BOLT Revision : 0
AND NUT FASTENERS Prepared : 20th
RECTIFICATION WORK March 2019

1.0 SCOPE
This document enumerates the plan and execution activities remedial work for
bolt and nut fasteners rectification Link Bridge for Amber home building within Aster
project.

2.0 SAFETY
 Conditions and precautions listed in the project specifications shall be followed as
minimum.
 All staff involved in the project shall be inducted on the safety, health and
environmental issues associated with the work.
 Only trained personnel with relevant experience shall be allowed to handle
machinery.
 Appropriate barriers and other safeguards shall be provided as required by the
nature of and location of the works. All operations shall be carried out in
accordance with the safety requirements.
 All field personnel will use PPE safety requirements like safety shoes, helmets,
cover all, dust mask, etc as required.
Page No :
METHOD STATEMENT FOR BOLT Revision : 0
AND NUT FASTENERS Prepared : 20th
RECTIFICATION WORK March 2019

3.0 PLANTS, EQUIPMENT AND MANPOWER

3.1 PLANTS AND EQUIPMENTS


 Rotary-screw compressor
 Washer

3.2 MANPOWER
 Supervising Engineer
 Supervisor
 Skilled Workers
 Unskilled Workers

4.0 WORK PROCEDURE


4.1 RECTIFICATION PROCEDURE
 All bolts shall be inspected in order to verify which bolts need to rectify.
 Defected bolt shall be dismantling using rotary-screw compressor.
 Before bolt being tighten back into it position, base plate shall be clean
first and free from any object.
 Washer shall be use on both side top and down purposely to make sure no
gap between bolt and base plate
 All bolts shall be securely tightened to attach members and comply the
torque requirement.
 Torque shall be inspected and tighten accordingly following below
table:
Page No :
METHOD STATEMENT FOR BOLT Revision : 0
AND NUT FASTENERS Prepared : 20th
RECTIFICATION WORK March 2019

NORMAL DIAMETER OF BOLT(mm) BEDDING TORQUE(NM)


16 80
20 160
22 210
24 270
27 340
30 460