CONTENTS
1.0 SCOPE
2.0 SAFETY
3.0 PLANTS, EQUIPMENTS AND MANPOWER
4.0 WORK PROCEDURE
Page No :
METHOD STATEMENT FOR BOLT Revision : 0
AND NUT FASTENERS Prepared : 20th
RECTIFICATION WORK March 2019
1.0 SCOPE
This document enumerates the plan and execution activities remedial work for
bolt and nut fasteners rectification Link Bridge for Amber home building within Aster
project.
2.0 SAFETY
Conditions and precautions listed in the project specifications shall be followed as
minimum.
All staff involved in the project shall be inducted on the safety, health and
environmental issues associated with the work.
Only trained personnel with relevant experience shall be allowed to handle
machinery.
Appropriate barriers and other safeguards shall be provided as required by the
nature of and location of the works. All operations shall be carried out in
accordance with the safety requirements.
All field personnel will use PPE safety requirements like safety shoes, helmets,
cover all, dust mask, etc as required.
Page No :
METHOD STATEMENT FOR BOLT Revision : 0
AND NUT FASTENERS Prepared : 20th
RECTIFICATION WORK March 2019
3.2 MANPOWER
Supervising Engineer
Supervisor
Skilled Workers
Unskilled Workers