Вы находитесь на странице: 1из 40

Vietnam’s professional company in foundation engineering

Vietnam’s leading corporate in underground and infrastructure construction in 2020


SHAFT GROUTED TECHNIQUE
AGENDA

A. REFERENCE PROJECT IN VIETNAM

B. SHAFT GROUTED BORED PILE DESIGN

C. SHAFT GROUTED BORED PILE CONSTRUCTION

D. QUESTION & ANSWER


A. REFERENCE PROJECT IN
VIETNAM
SUNRISE CITY PLOT V
-6 Tower 31-34 storeys+ 02 basement levels
-Barrette:
- 111 nos. barrette 0,8m x 2,8m x 53m
- 164 nos. shaft grouted barrette 0,8m x 2,8m, 1,0m x 2,8m,
depth 61m - 72m.
VINCOM B

-Tower 28 storeys + 6 basement levels

-Barrette:
- 138 nos. SGBR 1.5m x 2.8m, depth 54-78m.
VINCOM A
-Tower 8 storeys + 6 basement levels

-Barrette:
- 68 nos. SGBR 1.5x2.8m, sâu 47m – 60m.
- 4 nos. barrette 0.8x2.8m, sâu 47m.
AN PHÚ 2

- 25 storeys+ 2 basement levels


-Piling:
-30 nos. SGBR0.8 x 2.8m, 1.0x2.8m,
1.2x2.8m, depth 55m to 60m.
-18 nos. bored pile D1.0m, depth 54m.
CHỢ ĐŨI

- 18 storeys + 3 basement levels.

-Piling:
-29 nos. SGBR0.6 x 2.8m, 0.8x2.8m, 1.2x2.8m,
depth 50m - 54m.
-02 nos. barrette 0.6 x 2.8m, depth 48m.
SAIGON CENTER PHASE 2&3
- 48 storeys+ 5 basement levels.

- Piling:
-117 nos. SGBR1.0x2.8m, 1.2 x 2.8m, 1.5x2.8m,
1.0x4.0m, 1.5x4.0m, 1.0x6.0m, 1.2x6.0m,
1.5x6.0m, depth 64m - 85m.
-22 nos. SGBP D1.0m, D1.5m, depth 56m- 64m.
LANDMARK 81
- 81 storeys+ 3 basement levels

- Piling:
-28 nos. SGBR1.2mx2.8m, depth 85m
-31 nos. barrette1.2mx2.8m, depth 85m – 90m
-84 nos. barrette1.0mx2.8m, depth 85m – 90m
ĐẠI QUANG MINH
- 18 storeys+ 4 basement levels.

- Piling

- 45 nos. SGBR0.8x2.8m, 1.0mx2.8m, 1.5mx2.8m,


1.5mx4.0m, depth 62-71m.
- 17 nos. barrette 0.8mx2.8m, depth 62m.
- 203 nos. BP D1.2m - D1.5m, depth 66-72m.
E.TOWN CENTRAL
- 26 storeys+ 5 basement levels

- Piling:
-17 nos. SGBR1.0mx2.8m, sâu 46-65m
-1 nos. barrette1.0mx2.8m, sâu 68m
-18 nos. SGBR1.0mx6.0m, sâu 62-65m
-14 nos. BP D1.2m, sâu 58-77m
VINHOMES GOLDEN RIVER

- 38-50 storeys+ 3 basement levels.


-Piling:
-232 nos. barrette 0.8mx2.8m, 1.0mx2.8m,
1.2mx2.8m, depth 60-68m
-93 nos. SGBR1.0mx2.8m, 1.2mx2.8m, depth 70m
-144 nos. BP D1.0m-D1.2m, depth 60-64m
THE ONGOING-PROJECT OF FECON
Project:
EMPIRE CITY MU4 & MU7

Client:

Consultant:

Package:

TEST PILE & MASS PILING


B. SHAFT GROUTED BORED PILE
DESIGN
(EUROCODE 7 BS EN 1997-1:2004)
PILE CAPACITY

 Geotechnical capacity

 Structural capacity
GEOTECHNICAL CAPACITY

 Skin friction

 End-Bearing
SHAFT GROUTING - EFFICIENCY

 Increase soil tightness around the pile body.

 Restore and improve the horizontal pressure of soil during piling


construction.

 Increase skin friction between pile and soil.


SKIN FRICTION (Cohesive and Cohesionless soil)
 Cohesive soil

Based on alpha method of O'Neill and Reese (1999)


Unit skin resistance: qs = a.cu
where: a is adhesion shaft factor
For cu/pa ≤ 1.5: a = 0.55
For 1.5 ≤ cu/pa ≤ 2.5: a = 0.55 - 0.1(cu/pa - 1.5)
pa is atmospheric pressure pa = 101.00 kPa
The suggest value of a factor for bored pile: 0.45 ≤ a ≤ 0.55.
For shaft grouting segment : a = 1
SKIN FRICTION (Cohesive and Cohesionless soil)
 Cohesionless soil

Based on b-method of O'Neill and Reese (1999)


Unit skin resistance: qs = bs'v
where: For N60 ≥ 15: b = 1.5 - 0.245 √(z)
For N60 < 15: b = (N60/15) [1.5 - 0.245 √(z)]
The suggest value of b factor for bored pile: 0.25 ≤ b ≤ 0.55
z is depth below ground at mid-depth of soil layer (m)
s'v is vertical effective stress (kPa)
For shaft grouting segment: b = 0.55
Unit skin resistance is limit at 150 kPa for normal bored pile, 260 kPa for Shaft grouted bored pile
EXAMPLE FOR DESIGN
Project:
EMPIRE CITY MU4 & MU7

Client:

Consultant:

Package:

TEST PILE & MASS PILING


ADDRESS: Thu Thiem, District 2, Ho Chi Minh city, Vietnam
http://empirecitythuthiem.com.vn/ PACKAGE LOCATION

MU 4 Plot
MU 7 Plot
Normal Bored pile Shaft grouted Bored pile

Bore hole

Capacity: Grouting

Pile Geotechnical capacity


(Ton)
NBP 1260 tấn
D1.2m x 83m
SGBP 1260 tấn 62m
D1.2m x 62m

83m
Design Design Shaft Grouting
Type of pile Diameter Quantity Depth
Resistance R1 Resistance R4 Length
m nos. m T T m
BP - D1200 1.2 121 83 1650 1260
SBP - D1200 1.2 121 62 1650 1260 27
C. SHAFT GROUTED BORED PILE
CONSTRUCTION
CONSTRUCTION SEQUENCES
CASING INSTALLATION

DRILLING

1ST DESANDING

STEEL CAGE INSTALLATION

2ND DESANDING

CONCRETING

WATER CRACKING

SHAFT GROUTING
Jean Lutz
CONCRETE
COVER
MAIN BAR
GROUT

SOIL CONCRETE
SIDE SIDE
GROUTING TUBE
PICTURES FROM EMPIRE CITY SITE
FECON
D. QUESTION & ANSWER