Вы находитесь на странице: 1из 14

PMCC Item No Item Description Category Remark Package

LBE-VAF No. 347: On 26 Sep, 2018 during site surveillance at Elementary Schools (E1, E2 &
KGs) it was observed that contractor (Sinohydro) Proceeded with water proof system
(ignoring/missing) scupper drains (SD) Openings as shown in IFC drawings which all
PMCC0 Need to discuss with PID manager to
26167 completely closed in Zones (B,C & D) also stair cases upper roof which against IFC typ. ARCHITECTURAL
2 details drawing. This is a Violation of IFC drawings HA-030254 Sheets (1-5) HA-03019903 close based on Water prrofing WIRs
(typical details), HA-030255 Sheets (1-10). Contractor should Investigate the root cause for
repeating the same for above schools & provide the required corrective action.

LBE-VAF No. 431: On Nov-17, 2018 During site suveillance in KESS Package Schools
specifically: Package E1-Sub-Zone C & D Girl's Elementary School Corridor BC-109, BC-112 in
Ground Floor, BC-206 in First Floor, BC-303 in Second Floor Package E2-Sub-Zone C Girl's
Elementary School Corridor BC-109, it is noticed ongoing coating activities improperly such
as : 1. Wall coating commencement without dust removing, substrates of substances that
could impair bond of the various coatings should be cleaned prior coating applications. 2.
PMCC0 All accessories around door opening should be installed, covered by joint compound and WIR #
26171 ARCHITECTURAL
2 inspected prior coating applications. 3. Gaps around door frame opening should be uniform 34825,35055,34429,34683,36971
and not more than 12mm. 4. Joint between dry-walls and cement wall should be uniform.
5.Excluded area around door frame opening should be inspected and approved prior
coating application. 6. Area around door frame opening should be filled by cement mortar
layers not to be filled putty which is not approved procedure and should use suitable
accessories. Contractor is advised to take immidiate action and do the needful in order to
prevent this violation in other areas. This Violation to Specification Sec. 09 91 00.

LBE-VAF No. 432: On Nov-22, 2018 During Site Surveillance in KESS Package E1Boys and
Girls Schools Specifically Sub-Zone B 1st Floor Stair Room # 218, It is observed that Gypsum
PMCC0 26172 Board dry wall was installed in wrong location against IFC Drawin, Contractor is advised to ARCHITECTURAL WIR #36289
2
take immediate actionand do the needful in order to prevent this violation in other areas.
This is Violation to IFC# HA-030266002

LBE-VAF No. 467: On Dec 23, 2018 During Site Surveillance in Package KESS E1, E2 and SN
Boys & Girls School Specified: SN Girls School North, east and courtyard elevation. SN Boys
School North and South elevation. E1 Boys School East Elevation E2 Boys School Courtyard
PMCC0 Sub-Zone C elevation. E2 Girls School Courtyard Sub-Zone D elevation, it was observed
2 26181 surface hair lines discoloration in precast pane;s, Contractor has to repair all defective ARCHITECTURAL precast panel crack to be rectified
panels or surface imperfections. Contractor is advised to take immediate action and do the
needful in order to prevent the violation in order areas. This violation to Specification 03 45
clause 2.3 G and 3.2 E, F.

LBE-VAF No. 473: On Dec 23, 2018 During site surveillance in KESS Package E1, E2 Boys &
Girls School Specifically between Grid line (G-G,4) & (8-6) Ground Floor and 1st Floor Gym
PMCC0 hall, it is observed Conflict between structural and architectural IFC about the gap behind Final inspection glass partition has to
2 26183 dry-wall which located in the Gym hall area, Structural IFC shown clear gap despite in ARCHITECTURAL be raised .
architectural IFC Section the gap is closed with concrete slab and flooring tiles, ontractor is
advised to take immediate action and do the needful in order to prevent the violation in
order areas. This violation to IFC# HA-030714003, HA-030255005, HA-031106002.

LBE-VAF No. 474: On Nov 12, 2018 During site surveillance in KESS Package E1, E2
Elementary Boys & Girls School Specifically: Sub-Zone A Room# 212 1st Floor It was noticed
PMCC0
26184 conflict between architectural and structural approved IFC Drawings (Planted column ARCHITECTURAL Technical issue
2 between Grid Line "2.2-C.3" is exit in structural drawings whereas missed in architectural
drawings). Contractor is advised to take immediate action and do the needful in order to
prevent the violation in order areas. This violation to IFC# HA-030252, HA-030714.
LBE-VAF No. 347: On 26 Sep, 2018 during site surveillance at Elementary Schools (E1, E2 &
KGs) it was observed that contractor (Sinohydro) Proceeded with water proof system
(ignoring/missing) scupper drains (SD) Openings as shown in IFC drawings which all
PMCC0 19744 completely closed in Zones (B,C & D) also stair cases upper roof which against IFC typ. ARCHITECTURAL Need to discuss with PID manager
7 details drawing. This is a Violation of IFC drawings HA-030254 Sheets (1-5) HA-03019903
(typical details), HA-030255 Sheets (1-10). Contractor should Investigate the root cause for
repeating the same for above schools & provide the required corrective action.

LBE-VAF No. 405: Despite of site observation No. 41 dated on Wednesday 31-Oct, 2018.
During site surveillance at Boy's Elementary School (E2), It was observed that the (EJ)
PMCC0 Expansion Joint of precast panels is shifted & not align with the existing (EJ) Expansion Joint WIR#
7 19745 of Precast concrete foundation for boundary wall elevation No. (1). After verifying the ARCHITECTURAL 44966,44967,44968,44969,44970,44
drawings found that the location of existing (EJ) Expansion joint of precast Concrete 972,44973,44974,44975,44976
Foundation is not located as shown in drawing. This is clear violation of boundary wall
drawings (Sino Hydro) has to provide the corrective action.

LBE-VAF No. 450: Despite of Proactive on May 10, 2018 During Site Surveillance on Dec 03,
2018 in KESS Package E1 School Girls & Boys Specifically between Grid Line (C-G) & (5) 1st
PMCC0 Floor GYM Hall, it is observed exposed plaster decorative shape which is not per IFC
7 19756 drawing Contractor SH has proceeded with putty and primer neither final inspection of ARCHITECTURAL WIR # 37029 ,WIR # 38393 ,
Plaster nor pre-paint inspection has been conducted. Contractor is advised to take
immediate action and do the needful in order ro prevent this violation in other areas. this
Violation to IFC# HA-0311060 002, Schedule Q 1.8.

LBE-VAF No. 465: On Dec 23, 2018 During Site Surveillance in Package KESS E2 Boys School
Ground Floor Sub-Zone D Room# 176 and Electrical Room 168, it has observed that
contractor SH has commenced in putty and coating activities around door opening with
PMCC0 following comments: 1- Without Inspection approval. 2- Non-right angle at corner edges. 3-
19760 Filling the joint between frame and wall by cement mortor. 4- Gap not provided neither as ARCHITECTURAL WIR #44378
7
approved RFI nor standard code SDI. Contractor is advised to take immediate action and do
the needful in order to prevent the violation in order areas. This Violation to approved IFC
Drawings, Project Specification and Schedule Q 1.8.

LBE-VAF No. 467: On Dec 23, 2018 During Site Surveillance in Package KESS E1, E2 and SN
Boys & Girls School Specified: SN Girls School North, east and courtyard elevation. SN Boys
School North and South elevation. E1 Boys School East Elevation E2 Boys School Courtyard
PMCC0 Sub-Zone C elevation. E2 Girls School Courtyard Sub-Zone D elevation, it was observed
19761 ARCHITECTURAL precast panel crack to be rectified
7 surface hair lines discoloration in precast pane;s, Contractor has to repair all defective
panels or surface imperfections. Contractor is advised to take immediate action and do the
needful in order to prevent the violation in order areas. This violation to Specification 03 45
clause 2.3 G and 3.2 E, F.

LBE-VAF No. 473: On Dec 23, 2018 During site surveillance in KESS Package E1, E2 Boys &
Girls School Specifically between Grid line (G-G,4) & (8-6) Ground Floor and 1st Floor Gym
hall, it is observed Conflict between structural and architectural IFC about the gap behind
PMCC0
19765 dry-wall which located in the Gym hall area, Structural IFC shown clear gap despite in ARCHITECTURAL Glass partiton WIR to be raised.
7 architectural IFC Section the gap is closed with concrete slab and flooring tiles, ontractor is
advised to take immediate action and do the needful in order to prevent the violation in
order areas. This violation to IFC# HA-030714003, HA-030255005, HA-031106002.
LBE-VAF No. 474: On Nov 12, 2018 During site surveillance in KESS Package E1, E2
Elementary Boys & Girls School Specifically: Sub-Zone A Room# 212 1st Floor It was noticed
PMCC0 19766 conflict between architectural and structural approved IFC Drawings (Planted column ARCHITECTURAL technical issue
7 between Grid Line "2.2-C.3" is exit in structural drawings whereas missed in architectural
drawings). Contractor is advised to take immediate action and do the needful in order to
prevent the violation in order areas. This violation to IFC# HA-030252, HA-030714.

LBE-VAF No. 467: On Dec 23, 2018 During Site Surveillance in Package KESS E1, E2 and SN
Boys & Girls School Specified: SN Girls School North, east and courtyard elevation. SN Boys
School North and South elevation. E1 Boys School East Elevation E2 Boys School Courtyard
PMCC0 Sub-Zone C elevation. E2 Girls School Courtyard Sub-Zone D elevation, it was observed
9 28970 surface hair lines discoloration in precast pane;s, Contractor has to repair all defective ARCHITECTURAL precast panel crack to be rectified
panels or surface imperfections. Contractor is advised to take immediate action and do the
needful in order to prevent the violation in order areas. This violation to Specification 03 45
clause 2.3 G and 3.2 E, F.
SubSystem Required For Start-Up Scope Equipment Tag No. UserId Department Requested By Completion

SOUTH DHAHRAN HOME OWNERSHIP NOT


NO SCOPE Girls Elementary LIMJOCRR
PROJS DEPT COMPLETED

SOUTH DHAHRAN HOME OWNERSHIP NOT


NO SCOPE Girls Elementary LIMJOCRR
PROJS DEPT COMPLETED

NO SCOPE Girls Elementary LIMJOCRR SOUTH DHAHRAN HOME OWNERSHIP NOT


PROJS DEPT COMPLETED

SOUTH DHAHRAN HOME OWNERSHIP NOT


NO SCOPE Girls Elementary LIMJOCRR PROJS DEPT COMPLETED

SOUTH DHAHRAN HOME OWNERSHIP NOT


NO SCOPE Girls Elementary LIMJOCRR PROJS DEPT COMPLETED

LIMJOCRR SOUTH DHAHRAN HOME OWNERSHIP


NOT
NO SCOPE Girls Elementary
PROJS DEPT COMPLETED
NO SCOPE Boys Elementary LIMJOCRR SOUTH DHAHRAN HOME OWNERSHIP NOT
PROJS DEPT COMPLETED

SOUTH DHAHRAN HOME OWNERSHIP NOT


NO SCOPE Boys Elementary LIMJOCRR PROJS DEPT COMPLETED

SOUTH DHAHRAN HOME OWNERSHIP NOT


NO SCOPE Boys Elementary LIMJOCRR PROJS DEPT COMPLETED

SOUTH DHAHRAN HOME OWNERSHIP NOT


NO SCOPE Boys Elementary LIMJOCRR PROJS DEPT
COMPLETED

SOUTH DHAHRAN HOME OWNERSHIP NOT


NO SCOPE Boys Elementary LIMJOCRR
PROJS DEPT COMPLETED

LIMJOCRR SOUTH DHAHRAN HOME OWNERSHIP


NOT
NO SCOPE Boys Elementary
PROJS DEPT COMPLETED
NO SCOPE Boys Elementary LIMJOCRR SOUTH DHAHRAN HOME OWNERSHIP NOT
PROJS DEPT COMPLETED

SOUTH DHAHRAN HOME OWNERSHIP NOT


NO SCOPE KESS- Girls Special Needs School LIMJOCRR PROJS DEPT COMPLETED
Completion Date Initiator Agreement Number of Rejections 5 Day Notification PMT Close Date Agreement Date Initiator Remark

NOT COMPLETED 02/20/20 DISAGREE 8 DISAGREE 03/12/20 contractor to close LBE no 347.

NOT COMPLETED 02/20/20 DISAGREE 7 DISAGREE 03/12/20 contractor to close LBE no 431.

NOT COMPLETED 02/20/20 DISAGREE 6 DISAGREE 03/12/20 contractor to close LBE no 432

NOT COMPLETED 02/20/20 DISAGREE 6 DISAGREE 03/12/20 contractor to close LBE no 467

NOT COMPLETED 02/20/20 DISAGREE 6 DISAGREE 03/12/20 contractor to close LBE no 473

NOT COMPLETED 02/20/20 DISAGREE 6 DISAGREE 03/12/20 contractor to close LBE no 474
NOT COMPLETED 02/18/20 DISAGREE 1 DISAGREE 03/12/20 E2 - Boys Elementary

NOT COMPLETED 02/18/20 DISAGREE 2 DISAGREE 03/12/20 Not complete / not close.

NOT COMPLETED 02/18/20 DISAGREE 1 DISAGREE 03/12/20 E2 - Boys Elementary

NOT COMPLETED 02/18/20 DISAGREE 2 DISAGREE 03/12/20 Not complete / not close.

NOT COMPLETED 02/18/20 DISAGREE 2 DISAGREE 03/12/20 Not complete / not close.

NOT COMPLETED 02/18/20 DISAGREE 1 DISAGREE 03/12/20 E2 - Boys Elementary


NOT COMPLETED 02/18/20 DISAGREE 1 DISAGREE 03/12/20 E2 - Boys Elementary

NOT COMPLETED 02/23/20 DISAGREE 4 DISAGREE 03/12/20 not yet done,,, ,


PMT Remarks Chairman Remark Refrance Item# Refrenced Drawing /Standard Violation ETC

Included on Item 26195 All Areas Scope of work/Schedule Q

Included on Item 26195 All Areas Scope of work/Schedule Q

Included on Item 26195 All Areas Scope of work/Schedule Q

Included on Item 26195 All Areas Scope of work/Schedule Q

Included on Item 26195 All Areas Scope of work/Schedule Q

Included on Item 26195 All Areas Scope of work/Schedule Q


Included in Item no 19783 All Areas Scope of work/Schedule Q

Included in Item no 19783 All Areas Scope of work/Schedule Q

Included in Item no 19783 All Areas Scope of work/Schedule Q

Included in Item no 19783 All Areas Scope of work/Schedule Q

Included in Item no 19783 All Areas Scope of work/Schedule Q

Included in Item no 19783 All Areas Scope of work/Schedule Q


Included in Item no 19783 All Areas Scope of work/Schedule Q

included in item 28992 All Areas Scope of work/Schedule Q


01/06/00014/WIR/ 44966
01/06/00014/WIR/ 44967
01/06/00014/WIR/ 44968
01/06/00014/WIR/ 44969
01/06/00014/WIR/ 44970
01/06/00014/WIR/ 44972
01/06/00014/WIR/ 44973
01/06/00014/WIR/ 44974
01/06/00014/WIR/ 44975
01/06/00014/WIR/ 44976
01/06/00014/WIR/ 44966
01/06/00014/WIR/ 44967
01/06/00014/WIR/ 44968
01/06/00014/WIR/ 44969
01/06/00014/WIR/ 44970
01/06/00014/WIR/ 44972
01/06/00014/WIR/ 44973
01/06/00014/WIR/ 44974
01/06/00014/WIR/ 44975
01/06/00014/WIR/ 44976