Вы находитесь на странице: 1из 2

DATE:

CHECKLIST‐502                             
TIME:
BILL OF MATERIAL VERIFICATION
Reference Doc. No:

Sr. No PROJECT DETAILS:

1 PRODUCT DETAIL QUANTITY (OK/NOT OK) SPECIFICATION  (OK/NOT OK) REMARKS (IF ANY)


2 PV PANEL

3 STRUCTURE WITH ALL PARTS ‐ MMS
4 INVERTER 

5 AC CABLE 

6 DC CABLE
7 COMMUNICATION CABLE & CONNECTOR
8 PVC PIPE & ACCESSORIES

9 DWC CONDUIT & ACCESSORIES

10 LUG
11 CABLE TERMINATION  SLEEVE
12 ACCESSORIES  GLAND
13 NUT‐BOLT SET
14 CABLE TRAY ACCESSORIES

15 STAND, CAGE, CANOPY AND ACCESSORIES

16 EARTH STRIP

17 EARTHING MATERIAL &  EARTH PIT COVER

18 ACCESSORIES CHEMICAL COMPOUND 
19 Cu ROD

20 CABLE TIES

21 LIGHTNING ARRESTER WITH COMPLETE PARTS

22 EARTH STRIP SADDLE & INSULATOR 
23 DATA LOGGER SYSTEM
24 MECHANICAL FASTENER/SCREW/RIVET/STS
25 P.U FOAM
26 SEALANT
27 ELECTRICAL TAPE
OTHER MATERIAL 
28 FERRULE
29 SAFETY ITEM
30 UPVC SOLVENT
31 ACCB‐ACDB PANEL
32 MODULE CLEANING SYSTEM
REMARKS/COMMENTS:

EPC/CONTRACTOR SSE

SSE‐QC‐ELE‐502 REV‐0
…………………………                                                        
Date: 20.11.2019 PAGE A4
SIGNATURE

Вам также может понравиться