REPORT
On FIELD MISSION
MASCARA
May, 2011
TABLE OF CONTENTS
I. Introduction....................................................................................................3
II. Global Planning..............................................................................................4
III. Detailed Tasks / Actions..............................................................................5
1. Day 1............................................................................................................5
1. Day 2............................................................................................................5
2. Day 3............................................................................................................5
3. Day4.............................................................................................................5
4. Day 5............................................................................................................5
5. Day 6............................................................................................................5
IV. Conclusion....................................................................................................6
I. Introduction
May, 2011
22 23
Scheduled
Trajet Alger -Mascara DT de la ville de MASCARA
Work
Done Work Trajet Alger -SIG + DT de la ville de SIG DT de la ville de MASCARA
May, 2011
24 25
DT de la route MASCARA-TIGHENNIF et de
Scheduled DT de la ville de MOHAMADIA + visite et DT
TIGHENNIF + DT et visite des sites O29X032 &
Work du site O29X081
O29X139
DT de la route MASCARA-TIGHENNIF et de
DT de la ville de MOHAMADIA + visite et DT
Done Work TIGHENNIF + DT et visite des sites O29X032 &
du site O29X081
O29X139
May, 2011
26 27
Scheduled DT de la ville de BOUHNIFIA + visite et DT des
Trajet Mascara-Alger
Work sites O29X037 & O29X124
DT de la ville de BOUHNIFIA + visite et DT des DT de l’autoroute Est-Ouest tronçon
Done Work
sites O29X037 & O29X124 MASCARA et RELIZANE + Trajet vers Alger
We notice small sections with bad level, bad quality and also these events:
We observe also good result concerning serving band distribution as 74.8% for
DCS band.
We notice small sections with bad level, bad quality and also these events:
Important information to notice is below sections are outside the Mascara city
A request for remove them was sent to Q voice team for next campaigns.
We observe also a good result concerning serving band distribution as 73.5% for
DCS band.
3. Day 3 : 24/05/2011 (DT on TIGHENIF and visit of sites O29X032 & O29X139)
DT of TIGHENIF Town and below snapshots of Level, quality and serving Band:
We notice small sections with bad level, bad quality and also these events:
P2 & P3: pb due to swaped site O29X064 (swaped during implementation of re-
azimut Wo, waiting correction)
HO Fail Call Drop
Same as P2 & P3
Same as P1
We notice small sections with bad level, bad quality and also these events:
target cell)
P3: bad level due to delay HO between 29263 & 29393 due to cong on target
cell and pb Quality due also to serving cell new site accepeted recently
Hopping not yet implemented
HO Fail
Serving cell 29679 & target 29445 (Pb of Cong on target cell)
5. Day 5: 25/05/2011 (DT on BOUHNIFIA and visit of sites O29X037 & O29X124).
DT on BOUHNIFIA Town and below snapshots of Level, quality:
No problem detected (good level, good quality and no events)
We notice a bad level on EL GAADA (village near to site) due to coverage pb and also we
observe 2 LAC on this area (check of LAC distribution and HO audit will be done)
The goal of this visit is to check antenna, because this cell has a problem of CSSR
and HO incoming CDR and it normally due to the offset of the both antennas
according to the BSS NOC Engineer, locking separate antennas (antenna 1 (4trx),
antenna 2 (2trx )), the KPIs are improving.
As shown in the photos below the antennas of the sector are shifted horizontally
(one on one foot and one on the other foot of the pestle)
We wait West Radio Team to check this case and check of feeders.
IV. Conclusion
- The mission took place in a good framework and all Scheduled Work were done.
- After knowledge of the terrain and cities of mascara, problem solving will be more
objective and easier especially problems related to design.
- All WO sent are done, and actions related to coverage problems are supported by west
radio team.