(1)TIME BETWEEN (2)NO TIMES (3)PROB (4) CUM PROB (5)RAN NO INT
REC MACHINE FAILS OBSERVED
0.5 5 0.05 0.05 01--05
1 6 0.06 0.11 06--11
1.5 16 0.16 0.27 12--27
2 33 0.33 0.6 28--60
2.5 21 0.21 0.81 61--81
3 19 0.19 1 82--100
TOTAL 100 1
14-25 ANSWER
(A) SIMULATION OF PROPOSED MANTENANCE SYSTEM CHANGE OVER A 15-GENERATOR BREAKDOWN PERIOD
(5)Time
Repairperson (6)Random
(2) Random (3) Time Free to No. For
(1) Breakdown Number for Between (4) Time of Begin Repair
Number Breakdown Breakdowns Breakdown Repair Time
1 69 2.5 2:30 2:30 37
2 84 3 5:30 5:30 77
3 12 1.5 7:00 7:00 13
4 94 3 10:00 10:00 10
5 51 2 12:00 12:00 2
6 36 2 14:00 14:00 18
7 17 1.5 15:30 15:30 31
8 2 0.5 16:00 16:00 19
9 15 1.5 17:30 17:30 32
10 29 2 19:30 19:30 85
11 16 1.5 21:00 21:00 31
12 52 2 23:00 23:00 94
13 56 2 1:00 1:00 81
14 43 2 3:00 3:00 43
15 26 1.5 4:30 4:30 31
(B) THREE HILLS CURRENT SIMULATED MAINTENAMCE COST WITH ONE REPAIRPERSON PER SHIFT IS $4,320.00. BY ADDING
COSTS ARE LOWERD TO $2,820.00. THREE HILS SHOULD ADD A SECOND REPAIRPERSON IN EACH SHIFT.
COST LABOR:
2 REPAIRPERSON $30.00/HR EACH=$60/HR
HRS. DAY 1 (00:00-24:00) 24
HRS. DAY 2 (00:00-5:30) 5.5
TOTAL HOURS 29.5
$60.00(29.5) $1,770.00
COST DOWNTIME:
HRS.DOWN 14
COST PER HR. $75.00
$75.00(14) $1,050.00
Patient Appointment
Adams 9:30
Brown
Crawford
Dannon
Erving
Fink
Graham
Hinkel
14-15 ( C )
AVERAGE 15
(J22/J7)
RDER POINT =5
(7) LOST SALES (8) ORDER? (9) RAN NO (10) LEAD TIME
0 NO
0 NO
0 SI 6 1
2 NO
0 N0
0 SI 63 3
0 NO
0 NO
3 NO
0 NO
5
0(23)=$23.00
WN PERIOD
(9)Number
(7)Repair (8)Time Hours
Time Repair Machine
Required Ends down
1 3:30 1
1 6:30 1
0.5 7:30 0.5
0.5 10:30 0.5
0.5 12:30 0.5
0.5 14:30 0.5
1 16:30 1
0.5 16:30 0.5
1 18:30 1
1.5 21:00 1.5
1 22:00 1
1.5 0:30:00 1.5
1.5 2:30 1.5
1 4:00 1
1 5:30 1
14 14
S $4,320.00. BY ADDING A SECOND REPAIRPERSON PER SHIFT