Вы находитесь на странице: 1из 5

512900

287100
TENANT LENMARC MALL SURABAYA
BASEMENT
NO BRAND UNIT
1 PLAVNO Parking area

LOWER GROUND (LG)


No Tenant Unit Trade
1 TRANSMART SUPERMARKET LG.05-­‐LG.17 Supermarket
2 GARDA CENTER LG.18B Insurance
LG.18C Fasilitas Layanan Publik

3 KANTOR IMIGRASI LG.19A Fasilitas Layanan Publik


LG.18A Fasilitas Layanan Publik
4 PISON ART & FOUNDATION LG.19B-­‐21 Education (School of Fashion Designer)
5 BODY FIGHT LG.22 Fitness Center
6 LENMARC ART CENTER LG.23 Entertainment

GROUND FLOOR
No Tenant Unit Trade
BEIJING WEI
1 GF-­‐A1 Chinese Restaurant
OUTDOOR SEATING AREA
2 BCA ATM CIRCLE GF-­‐A3 ATM Service
GF.01

3 STARBUCKS COFFEE GF.01A Coffee Shop


GF.01B
4 MINISO GF.05+06+08B Japanese Household, Bags, Accessories & Cosmetics

5 WATSONS GF.07+09 Pharmacies, Healthy & Beauty Store


6 KOPI KENANGAN GF.08A Coffee Shop
7 J-­‐CO GF.10 Coffee & Donut Shop
J-­‐CO SEATING AREA GF.10A
J-­‐CO OUTDOOR SEATING AREA GF.10B

8 CAPITAL GF.12 Café & Restaurant


9 TRANSMART DEPT. STORE GF.19-­‐32 Department Store
10 TUTTO BONO GF.40-­‐42 Restaurant, Café & Lounge
TB OUTDOOR SEATING AREA

11 SHU XIANG GE GF.43 Shi Chuan Hotpot


OUTDOOR SEATING AREA
GF.45
12 CACAYO GF.48 Singaporian Restaurant
13 YOSHINOYA GF.49A Japanese Fried Rice
YOSHINOYA OUTDOOR SEATING GF.49B
AREA
YOSHINOYA OUTDOOR SEATING
AREA
14 SUPRESSO GF.50 Coffee Shop
SUPRESO SEATING AREA GF.50A
15 PANDAN GARDEN GF.50B

UPPER GROUND (UG)


No Tenant Unit Trade
1 DISTRICT 27 UG.09 Fashion Designer Area
2 ACE HARDWARE UG.A3 Home Improvement
3 MY FABLANE UG.01 Fashion
4 LENZ & LOUIS UG.05 Fashion
5 BATIK FIRST UG.07 Fashion
6 G-­‐CENTER UG.10 Hip Hop School
7 DAP (KING KOIL) UG.17-­‐18 Bedding & Mattras (under renovation)
8 SUMIBIAN UG.20 Japanese Restaurant
9 BENTOYA UG.31 Japanese Restaurant
10 FRAMOUS UG.32 Frame Store
11 SKY TECH UG.33,35 IT & Gadget Experience Store
12 CHA TIME UG.36 Beverages / Milk Tea
13 TOAST JAM UG.37 Restaurant & Café

FIRST FLOOR (LV 1)


No Tenant Unit Trade
1 INFORMA L1-­‐A1 Home Improvement
2 KITCHEN ART L1-­‐A5 Kitchenware outlet
3 MORNING STAR L1.01-­‐10 School, Church & Courses
4 URBAN ATHLETES L1.18-­‐20, 22-­‐23 Fitness Center (under renovation)
5 CREATIVE CORNER L1.21 Illustrative & Creative Outlet
6 WOODLIVING L1.25 Home Furniture
7 PEPPER FRAME L1.26 Photo Studio
8 CAMERICH L1.29A Innovative Furnishing

SECOND FLOOR (LV 2)


No Tenant Unit Trade
1 GEREJA HFC L2-­‐A2 Church
2 FOOD CHANNEL L2-­‐A6 Food Court
3 GBI FUN & JANJI JIWA COFFEE L2.01-­‐06 Church & Coffee Shop

4 PIAZA ITALIA L2.10-­‐11 Italian Restaurant


5 ATM CENTER : L2.26 ATM Service
ATM NIAGA L2.ATM-­‐02 ATM Service
ATM MANDIRI L2.ATM-­‐03 ATM Service
6 NAV L2.37 Family Karaoke
7 GANESHA ROOM Multifunction Room
8 EXECUTIVE MUSHOLA

THIRD FLOOR (LV 3)


No Tenant Unit Trade
1 CINEMA XXI L3-­‐A1 Movie Theater
2 PIAZA ITALIA L3.09 Italian Restaurant
REPORT PROGRESS PENGURUSAN SURAT LAIK FUNGSI ( SLF )
Time Schedule
No List Perijinan SLF Freq Perpanjanngan Keterangan 2019 2020
Okt Nov Des Jan Feb Mar Apr Mei Jun Jul Ags Sep Okt Nov Des
Rekom Dinas pemadam (Proses perpanjangan
1 1 tahun EST EST Ijin TPS B3 terbit
Kebakaran rekom yg lama)
akhir Jan / Awal Feb
2 Rekom Dinkes 6 bulan (Done) 2020

Rekom DLH Ijin Tidak ada keterangan


3 (Proses pengurusan ijin) EST
Lingkungan perpanjangan
Rekom DLH Ijin TPS
4 5 tahun (Proses pengurusan ijin) Sudah dilakukan EST
limbah B3
survey oleh Damkar
Surabaya
5 Rekom DLH IPAL 5 tahun (Proses pengurusan ijin) EST

Tidak ada keterangan EST Ijin Pembuangan Air


6 Rekom Disnaker Prov (Done) Limbah (IPAL) terbit akhir
perpanjangan EST Ijin lingkungan Feb / Awal Maret 2020
Rekom Dinas Pekerjaan Tidak ada keterangan terbit akhir Nov /
7 (Done) Awal des 2019
Umum perpanjangan
Rekom Dinas
8 5 tahun (Done)
Perhubungan
EST pengajuan SLF akhir
9 Surat Laik Fungsi 5 tahun (Proses pengurusan ijin) EST Maret / Awal April 2020

DETAIL PROGRESS SURAT LAIK FUNGSI ( SLF ) BDP


Ijin Lingkungan (IL) Ijin TPS Limbah B3 Ijin Pembuangan air limbah (IPAL) Rekom Dinas pemadam kebakaran
Sudah dilakukan survey oleh tim DAMKAR
Hari senin (14-10-2019) Surabaya (31-10-2019), Selanjutnya menunggu
sudah diajukan ke UPTSA Semua persyaratan administrasi & teknis feedback dari tim DAMKAR Surabaya
untuk proses asistensi Semua persyaratan sudah dilengkapi
administrasi oleh administrasi & teknis
konsultan sudah dilengkapi,
sudah tahap proses
administrasi pengajuan
verifikasi teknis oleh
DLH Surabaya.

Noted : Noted : Noted :


Pengajuan IPAL menunggu penerbitan IL
Menunggu feedback dari Pengajuan verifikasi yang baru
DLH Surabaya, Jika tidak teknis, Menunggu
ada comment dari DLH, penerbitan IL yang baru
Sesuai schedule (est 1
bulan) IL yang baru akan
terbit
Menunggu feedback dari
DLH Surabaya, Jika tidak
ada comment dari DLH,
Sesuai schedule (est 1
bulan) IL yang baru akan
terbit

Вам также может понравиться