Contents
1 Introduction .......................................................................................................................................... 3
1.1 SP-1190 Requirements for F&G Mapping ..................................................................................... 3
2 Information to be Provided to the 3rd Party Service Provider .............................................................. 4
2.1 Documents / Files / Inputs to be provided ................................................................................... 4
2.2 Fire & Gas Philosophy ................................................................................................................... 4
2.3 Selection of Detector technology ................................................................................................. 4
2.4 Selection of Toxic / Flammable Sphere Sizes ................................................................................ 5
2.5 Fire / Gas Zones............................................................................................................................. 8
2.6 Clipping Zones ............................................................................................................................... 8
3 Information to be Provided by the 3rd Party Service Provider .............................................................. 9
3.1 Agreement with PDO Prior to full mapping commencing ............................................................ 9
3.2 Mapping Outputs Required .......................................................................................................... 9
4 Appendix 1 Fire / Gas Zones & Detector Selection ............................................................................. 10
Abbreviations:
AL 1 / 2: Alarm Level 1 / 2
1 Introduction
This document provides guidance on what information should be provided to third party service
providers for 3D F&G Mapping Studies which are to be conducted for PDO facilities.
Historically SGSi (Shell Global Solutions) was the third party service provider which carried out the
Fire & Gas Mapping studies for PDO projects. However, there are alternative service providers
available in the market, the use of which can result in a schedule and cost benefit for PDO.
Typically the latest version of the Shell Fire, Gas and Smoke Detection Systems, DEP 32.30.20.11-
Gen shall be referenced when conducting F&G Mapping Studies. However, there are some areas
where the DEP is insufficiently clear / concise to ensure a consistent approach.
It is not the intention of this document to replicate the F&G DEP, the DEP still applies in its entirety
within PDO. The intention is to provide the following specific information, which should be
included within each contract document, to have consistency of approach across the assets.
The coverage and limitations need to be understood for all our facilities, which allows PDO to
manage its risk effectively. Where mapping identifies areas where coverage is less than the DEP,
the risk of failing to detect a release, or failure of executive action should be included in the asset
risk register.
Toxic H2S Point Detectors to be Metal Oxide semi-conductors Type(Version 40 DEP 32.30.20.11,
Section 4.6.1)
Limitations on the different equipment types need to be fully understood by the PDO team requesting
the mapping. Each vendor will have different specifications and characteristics. These specifications
and limitations can impact the mapping and the number and location of detectors. An oversight at this
stage can invalidate the mapping, if an alternate vendor product with different characteristics is
selected.
Issues to be addressed / agreed with the mapping contractor prior to conducting the mapping are:
Flame detector field of view and sensitivity settings, for both new and existing developments to
ensure the coverage settings are appropriate.
Acoustic detector range and suitable process conditions for each make of detector which is to
be used in the mapping exercise
The DEP States a Toxic Sphere of 8m, but it makes no reference to the concentration of the sphere at
that dimension. During the Harweel 2AB F&G Mapping exercise, SGSi advised that the concentration is
80ppm at 8m.
Within the DEP, there is no guidance on whether to map at Alarm Level 1, 2 or at some other
concentration. During the Harweel 2AB study, SGS advised that the mapping was to be conducted with
a 40ppm, 12.5m cloud.
Currently PDO sets it H2S point detectors at the following Alarm Levels:
The DEP states that Alarm Level 2 must be 40ppm. At the 40ppm H2S contour, the diameter of the
sphere is 12.5m, which has been used for the PDO Critical Sour Facilities. Guidance provided by SGSi has
been to maintain the 12.5m diameter cloud size irrespective of the current PDO Alarm Level 2 set point
of 20ppm.
To ensure alignment within PDO, all PDO toxic point detectors are to be mapped at 40ppm, 12.5m cloud
diameter, even if the existing plant trip point is 20ppm. This is a conservative approach, as mapping at
20ppm, would mean the use of a larger target cloud. When the plant is fully mapped, and the mapping
solution fully implemented, the operational trip set point can be raised to 40ppm in compliance with the
DEP.
The current DEP uses the following ALARM Levels for H2S Line Of Sight detectors
The set points of the H2S Line of Sight Detectors that are approved for use in PDO and in use within
Greater Birba, are:
The same toxic sphere is used for mapping both Toxic Point and Toxic Line of Site detectors. However,
for LOS activation we look at the sum of the H2S concentration through the 2D chord. Inferred
calculations show that the LOS detectors effectively will reach Alarm Level 1 (100ppm-m) at the outer
edge of a 20m diameter sphere. LOS Mapping is conducted using Alarm Level 1 as recommended by
SGSi. Therefore a 20m diameter sphere will be used as the basis for the Toxic Line of Sight mapping
exercise. It will not be used for point detection mapping.
Therefore typically, all flammable mapping is to be carried out using the standard DEP Spheres for
flammables based on congestion. The Flammable sphere defined in the DEP is 100% LFL at the outer
edge / contour (5m, 7m or 10m). However, for the mapping, the cloud size to be used is based on the
actual Alarm Level 2 setting of the facility; which as of most recent DEP, of Feb 2016 stands at 40% LFL.
This means that flammable cloud diameter used in the mapping will be greater than that noted in the
DEP, as the LFL decays to 40% LFL, based on the process fluids at site and Alarm Level 2.
Historically, within PDO Alarm Level 2 may have been set to 60 % LFL. In the case of any modification to
existing facilities where the percentage (%) flammability may not align with the current DEP (i.e. Not
40% LFL), the cloud diameter is to be modified to align with the % flammability in use at the site, taking
account of the typical flammability limits of the streams in the particular unit.
Page 6 F&G Mapping Guidance Printed 23/06/16
Revision: 2.0
Petroleum Development Oman LLC Effective: June -16
The current DEP typically uses the following Alarm Levels for Flammable Line Of Sight detectors.
Alarm level 1 of 1 LFL –m, means that there is a concentration of 1LFL distributed over the entire path
length (not each metre). For example, if the path length is 100m , and the LFL of the gas was 50,000ppm
then the total concentration through the cloud, over the 100m path is 50,000ppm. If the cloud was
homogeneous over the 100m, that would mean each linear metre of the 100m path would contain
500ppm.
However, as discussed above the flammable cloud to be mapped is not homogenous, and will decay in
concentration from the release point to the 40% LFL.
This shall be applied for all PDO facilities. The mapping setting for Flammables LOS is Alarm Level 2, not
Alarm Level, 1 as used for Toxic LOS.
For Flammable LOS, the same cloud is used for mapping, as the point detectors. However, for LOS
activation we look at the sum of the flammable concentration through the 2D chord, based on the same
sphere.
Prior to mapping commencing, the calculation and size of the flammable cloud, presenting the following
details will be provided to PDO and agreed in writing:.
For Point Mapping; Cloud Diameter to LFL, AL1 LFL & AL2 LFL
For LOS Mapping, using the same Cloud Diameter to LFL (as for point mapping), provide the
radius / diameter distance(m) to chord concentration of 2LFL-m, & 1LFL-m.
All related calculations are to be provided within the F&G Mapping Report.
The Fire / Gas Zones need to be identified and subsequently defined taking account of the hazards
present in the facility. Prior to mapping all relevant information must be available and logically
organised. For this purpose a matrix / template with associated guidance notes is available in Appendix
1. Completion of the matrix will provide an auditable trail that full consideration of the detection
required has been conducted. The Fire / Gas Zone matrix must be formally agreed by PDO Technical
Safety Engineer, prior to mapping commencing by the vendor.
The Clipping Zones shall be reviewed & agreed by PDO prior to the F&G Mapping commencing.
F&G detection philosophy details, such as detector voting and coverage criteria.
Flammable Point Mapping: Flammable sphere size AL2 LFL points.
Flammable LOS Mapping: Flammable Sphere - distance to the chord which reaches AL2 in
LFL-m for LOS.
Toxic LOS Mapping: Toxic sphere - distance to chord which reaches AL1 in ppm-m for LOS.
Fire / Gas Zones.
Clipping Zones.
Instrument ranges, such as ‘Field of View’ for Flame Detectors & Acoustic .
Completion of the matrix in Appendix 1.
Each fire hazard zone should be regarded carefully where the detection is required and also
record the assumptions where the detection is not required.
For each fire hazard zone where the detection is required, determine whether full area coverage
is required or focused detection (identify the process source/release) is required by mark-up
drawing demonstrating fire/flammable/toxic areas with different colour codes on plot plan.
Process Product
HP (Liquid/Gas): If the liquid/gas streams handling toxic/hydrocarbon components in the equipment
are more than 4 barg, it should be considered as high pressure stream.
LP (Liquid/Gas): If the liquid/gas streams handling toxic/hydrocarbon components in the equipment
are more than 4 barg, it should be considered as low pressure stream.
Vapor pressure: Is the liquid component generates sufficient vapor pressure to form a flammable
cloud. A rule of thumb, if any stream has RVP (Reid Vapor Pressure) more than 2.5, gas detectors to
be considered. Check the box with “Yes” if it has sufficient vapor pressure.
Flame Detection
Required: Check with Yes/No if the flame detection is appropriate for the stream/equipment. Follow
the Fire & Gas Philosophy/Design Basis for requirements and methodology for considering the flame
detection.
Jet Fire: Check with Yes/No if the flame detection is required for a jet fire scenario. Yes, Fire Size will
normally be considered as per DEP, if not, please specify.
Pool Fire: Check with Yes/No if the flame detection is required for a pool fire scenario. Yes Fire Size
will normally be considered as per DEP, if not, please specify.
Gas Detection
Required: Check with Yes/No if the gas detection is appropriate to the stream/equipment.
Ultra Sonic: Ultrasonic gas leak detection (UGLD) is required only for gaseous streams handling
above 4barg as per section 4.3.6 of DEP 32.30.20.11-Gen.
Check the box with Yes/No accordingly. Also, check the vendor data sheet of UGLD for confirmation
on the limitation of the pressure. Check the F&G Philosophy & background noise.
Inferred Detection: Refer section 4.3.2 of DEP 32.30.20.11-Gen. for implementing if it is applicable
in the project.
Conventional (Flammable): Check with Yes/No in the designated boxes, if the streams are
appropriate to provide the flammable gas detection.
Conventional (Toxic): Check with Yes/No in the designated boxes, if the streams are appropriate to
provide the toxic gas detection.
Mapping (Flammable/Toxic)
Flammable Accumulation Points: Determine the accumulation cloud size required (5/7/10m) at LFL.
Normally for less congested areas, such as open areas of onshore gas processing plants, a 10m cloud
size to be considered. Refer Table 6-1 in DEP 32.30.20.11-Gen. & Section 2.4.2 of this document for
more details.
Flammable Accumulation LOS: Determine the accumulation cloud size required (5/7/10m) at LFL.
See section 2.4.2.
Toxic Accumulation Points: Refer to the section 2.4.1, the default toxic cloud size is a 12.5m
diameter sphere at 40ppm..
Toxic Accumulation LOS: Refer to Section 2.4.1. 20m sphere at 100ppm-m.
Jet Release Flammable: This type of mapping shall not be conducted without the Approval of MSE4.
If the mapping requires flammable gas jet release, provide FRED files to the Fire & Gas Mapping
consultant for those streams/equipments which are modelled during FEA (Fire, Gas Dispersion &
Explosion Assessment) study.
Jet Release Toxic: This type of mapping shall not be conducted without the Approval of MSE4. If the
mapping requires toxic gas jet release, provide FRED files to the Fire & Gas Mapping consultant for
those streams/equipments which are modelled during FEA (Fire, Gas Dispersion & Explosion
Assessment) study.
Additional Indicators
CCTV at Flame Detector: Refer to the CCTV layout which is normally prepared by Telecom
department and also provide the co-ordinates from of the CCTV locations from the PDMS model to
the consultant, so that the coverage will be determined for each Fire Hazard Zone (FHZ) and also
other information such as CCTV tilt angles, positions in case of emergency event.
Consider gas release cameras?
Notes
Any other information to be addressed apart from the information provided above.
Fill the appropriate data/information in the cells provided or check with Y/N
Equipment Details A B C D E F G H
Process Stream 1 2 3 4 5 6 7 8
HP (Liquid/Gas) Pressure >4 barg
LP (Liquid Gas) Pressure < 4 barg
Process
Product Can the liquid component generate
Vapour Pressure sufficient vapour pressure to form
a flammable cloud?
Equipment Details A B C D E F G H
Process Stream 1 2 3 4 5 6 7 8
Conventional Is Flammable gas detection
(Flammable) appropriate
Conventional
Is Toxic gas Detection appropriate
(Toxic)
Flammable
Select appropriate cloud size
Accumulation
required (5/7/10m)LFL at AL2.
Point
Flammable Select appropriate cloud size
Accumulation required (5/7/10m)LFL at AL2
LOS through chord
Toxic
Accumulation Cloud of 12.5m diameter at 40ppm.
Mapping Point
(Flammable Toxic
/ Toxic) Accumulation 20m cloud diameter at 100ppm-m.
LOS
Equipment Details A B C D E F G H
Process Stream 1 2 3 4 5 6 7 8
CCTV at Gas
Alarm
Notes