DESIGN INFORMATION

1. Type of Structure 3. Reference Codes


A. Special Moment Resisting Frame
MNBC 2016 /ACI 318-09, UBC 97, AISC LRFD 93
2. Design Load
OWNER/APPLICANT
A. Dead Load

4. Designed Material Strengths


(1) Super Dead Load A. Concrete Strength
PROJECT
f ' = 2500 psi [f =3205 psi] PROPOSED 3 STORYED
c cu R.C.C BUILDING

BLOCK NO.
(2) Wall Load
1 B. Steel Reinforcement
2" Thick Brick wall) LOT NO.

f = 50,000 psi
y TOWNSHIP MDY

SUBJECT
B. Structural Steel
f = 36 ksi , f = 58 ksi GENERAL NOTES
B. Live Load y u

SHEET NO
SCALE

G-01
5. Structural Analysis & Design Software DATE 26-02-2020

L.A / S.L.A / R.S.E / PE

A. ETABS V 9.7.1 / ETABS 2016


C. Wind Load
B. RCDC V7
(1) Wind Speed = 100 mph

(2) Exposure Type ='B'

(3) Exposure From Diaphragm

(4) Important Factor = 1

D. Earthquake Load

(1) Over Strength Factor R = 8.5

(2) Soil Type = 'SD '

(3) Seismic Zone Factor = 0.4


Standard Bar Hooks
db db
db OWNER/APPLICANT

Bend dia = 6db

12db
Bend dia = 6db
12db

4db

db
Main Reinforcement
PROJECT

(a)
PROPOSED 3 STORYED
4db R.C.C BUILDING
(b)
db db
(c)
No.8 (25mm)
BLOCK NO.
Bend dia = 4db bar or smaller
6db

Bend dia = 4db


12db

No.5 (16mm)
No.6,7 or 8 bars db ldh LOT NO.
bar or smaller
(16mm to 25mm)
Bend dia = 4db
6d
b (a) 4 db for No.3 through 8 bars TOWNSHIP MDY

Stirrup & Tie (b) 5 db for No.9 through 11 bars


(c) 6 db for No.14 through 18 bars SUBJECT

Fig. Details of standard hooks GENERAL NOTES


Development Length of Standard Hooks ( l dh )

l hb = basic development length for standard hooks SCALE


SHEET NO

l dh = development for standard hooks Modification factors (to multiply) :


G-02
. DATE 26-02-2020
l dh = lhb x modification factor (i) If side cover of main bars 2.5in. clear, and for 90
hook if clear cover on bar extension also 2.0in ................... 0.7 L.A / S.L.A / R.S.E / PE
lhb = fy
db 50 f 'c (ii) If hook is enclosed within closed
stirrups at spacing 3d b along l dh ................................................ 0.8
Basic Development Length of Standard Hooks ( l hb )
(iii) Reinforcement in
f y (ksi) .............................................................. A s, required / As, provided
excess of that required
40 50 60
Note : Minimum l dh = 8d b 6in
2.5 16.0d 20.0d 24.0d

3.0 14.6d 18.3d 21.9d

3.5 13.5d 16.9d 20.3d


End Anchorage Lengths

(A) Using Standard Hooks (B) Using Alternative Method (based on total length-less desirable and only for use
when space is not adequate for standard hook ldh )
(a) Beam - Column Connections (b) Beam - Girder Connections
( using standard hooks ) ( using standard hooks ) (a) Beam - Column Connections (b) Beam - Girder Connections OWNER/APPLICANT
( using alternative method ) ( using alternative method )

la1 > l > 8d or 6 in.


dh b
la1 > l > 8d or 6 in.
dh b la 2
> ldh + 14 d b

> ldh + 11 db
l a2 > l dh + 14 d b

lb2 > ldh + 14 d b


clear cover clear cover
> 2 in. > 2 in. PROJECT
(50 mm) PROPOSED 3 STORYED
Primary beam R.C.C BUILDING
Column
(girder)

2
lb
Column Primary beam BLOCK NO.

clear cover clear cover (girder)


lb1 > l dh > 8d b or 6 in.
lb1 > l dh > 8d b or 6 in. > 2 in. > 2 in. LOT NO.
> 6 in. or 8 d b
> 6 in. or 8 d b
TOWNSHIP MDY

Note : Modification factors may be applied to lhb values to find l dh values. SUBJECT

GENERAL NOTES
Note : In case the width of column or primary beam (girder) is not large enough to
Note : In most cases under gravity loads only, for the bottom bars, a standard hook with > 6 in.
containdhl but it is desired to keep the same bar size , then , as an alternative ,
insidethe column or primary beam is recommended even though it is allowed SHEET NO
the following less desirable method of anchoring based on total length may SCALE
not to use the hooks at all ; l may be neglected for such a case. For cases
be used [ Sect. (B) ] . If it is still impossible to place the hook in the girder , b2 G-03
with possible stress reversal , l must be provided , however. DATE 26-02-2020
reduce the bar size in order to reduce the required anchorage length. b2
L.A / S.L.A / R.S.E / PE

Anchorage Length Available in a Primary Beam (Girder)


1.875 in.

b
l max b + h - 5.875 - 2.5 d b (in.) (for the outermost layer)

l max l max b
h

Secondary
l
2 in.(50 mm)

beam Secondary max b


beam
Primary beam Primary beam ( Girder )
2 in. d b = diameter of main bar, in.
(50 mm) clear ( Girder )
h, b = depth and width of primary beam, respectively, in.

Ref : (1) U Nyi Hla Nge ; "Refresher Course And Field Reference Manual For Site Engineers & Inspectors " ; 1st edition, 2010.
(2) U Nyi Hla Nge ; "Reinforced Concrete Design " ; 1st edition, 2010.
L/3 L/3
3" 2" Top Bar Top Bar 2"
A

h
h
min
12"
A
Bottom Bar 2h x x x
2h
Lapping Area ( Bottom Bar Only ) Temp. & Shr. Steel x = spacing
6"min
L For slabs, Section A - A
Maximum Spacing
cut-off point cut-off point cut-off point cut-off point
L1 /4 L1 /3 L2 /3 L2 /3 = 3h (or) 18" ( one - way slab - for main steel )
OWNER/APPLICANT
= 2h (or) 18" ( two - way slab - for main steel )
L1 L2 = 5h (or) 18" ( for temp. & shr. steel )

( 1 ) Do not splice more than 50% of the total at any section Fig. SLAB TYPICAL DETAIL Note : For 40/50 ksi ,
( 2 ) Do not splice any bar within the cantilever span A s (min) = 0.002 bh ( = temp. & shr. steel )
( 3 ) Lapping length = 40 x Main bar diameter
For 60 ksi , PROJECT
0.25 x ( smaller of C 1 or C 2 ) A s (min) = 0.0018 bh ( = temp. & shr. steel ) PROPOSED 3 STORYED
C1 R.C.C BUILDING
s < 6 x longer bar diameter

s0
BLOCK NO.
N1 /2 bars on each side
12mm (both layers)
LOT NO.
C2
s

TOWNSHIP MDY

Elevation Plan SUBJECT

Fig. TRANSVERSE REINFORCEMENT REQUIREMENTS FOR GENERAL NOTES

N2
LONGITUDINAL BEAM REINFORCEMENT OUTSIDE A CONFINED COLUMN CORE

CONCRETE COVER SHEET NO


Concrete Protection for Reinforcement ( net concrete cover ) SCALE
The following minimum thickness of concrete cover outside of the outermost steel are specified. G-04
Not exposed directly to weather or Exposed directly to weather or DATE 26-02-2020
Particulars
not in contact with ground in contact with ground
N1
L.A / S.L.A / R.S.E / PE
_ 3 in. ( Side & End cover ) N2 /2 bars on each side
Footing
N1, N2 = number of slab rebars cut off at opening
3 in. 2in. but 112 in. for No.5 (16mm)
Slab and Walls 4 and smaller bars

Beams and columns 11 in. 2 in.


2
Floor Level
If concrete is poured in direct contact with the ground without the use of forms, a cover of at least 3 in. shall be provided.
However, it may be reduced, but not to be less than 2in. , if at least 3 in. thick (1:3:6) lean concrete is placed under the footing.
T10 @ 150 mm c/c (Links)
2 - T10 (Top & Bottom)
BAR SPACING ( for maximum size of aggregate 1 inch ) A

min
6"
Links

Type of member Minimum clear spacing Maximum c/c spacing A


Note : Clear distance between layers of 8" 8"
6"
Beam 113" _ beams reinforcement must not be
min min

6"
less than 25.4 mm. and the bars
Column 112 d b (or) 112" _
in the upper layer should be Section A-A
3h (or) 18" (one-way slab) place directly above those in the
3" lower layer .Bars in beams must
Slab/Stair (to save labour) 2h (or) 18" (two-way slab) be placed symmetrically about
Floor Level
Temp.& shr.steel : 5h (or) 18" the vertical centerline.

Width of Opening

Ref : (1) U Nyi Hla Nge ; " Refresher Course And Field Reference Manual For Site Engineers & Inspectors " ; 1st edition, 2010. LINTEL DETAIL
(2) U Nyi Hla Nge ; " Reinforced Concrete Design" ; 1st edition, 2010.
0.3 L1 0.3 L1 * Beam Splice Column Splice

D
R.C column
or R.C wall < 12 ( total +ve As ) cutoff
0.125 L1 0.125 L1 Splice Length
L1
Simplified Cutoff Points
* If adjacent spans are different in span lengths, use the larger of the two. OWNER/APPLICANT
9D
( 1 ) Do not splice more than 50% of the total at any section.

( 2 ) Do not splice any bar within the cantilever span.


( 3 ) Lapping length = 40 x Main bar diameter.
Exterior column with large offset PROJECT
PROPOSED 3 STORYED
R.C.C BUILDING
Splice Location for Beams
BLOCK NO.
Splice Length

splice
Lap
>2h >2h
If 3" or more, use dowel bar LOT NO.

S
h

S
2
TOWNSHIP MDY

in exterior joints
Not more than s
Splice Zone

S
2
SUBJECT

splice
Lap
Fig. Splice Location for Top Bars
GENERAL NOTES
Top bars are not to be spliced: Offset bend
Closed tie

s
* Within joints.
* Within a distance of twice the member depth from the face of the joint. Dowel bar SHEET NO
SCALE
* At locations where analysis indicates flexural yielding caused by inelastic lateral displacements of the frame.
G-05
DATE 26-02-2020
Compression Development Length (, ldc ) Splice Length
Splice Zone
L.A / S.L.A / R.S.E / PE
ldc 0.02f y
= 0.0003f y
db
f'c

h
Modification factors ( to multiply ) :
Splice Length (i) A s, required / A s, provided
>2h
Lc /3 Lc /3 Lc /3
Lc (ii) If confined, i.e., if No.4 ties at not more than 4 in. c/c
Fig. Splice Location for Bottom Bars spacing is provided, may be modified with 0.75

Bottom bars are not to be spliced: (iii) ldc > 8 in. (in all cases)

* Within joints.
* Within a distance of twice the member depth from the face of the joint. Tension Development Length , ( ld ) Splice Length
* At locations where analysis indicates flexural yielding caused by inelastic lateral displacements of the frame. ld fy
= (for < 20mm bars) As, required
* At the beams that supporting the secondary beams, if possible. db f'c
Modification factors = (to multiply)
As, provided
* At mid span. ld fy (for > 22mm bars) l d > 12 in. (in all cases)
=
db f'c
* For top bars multiply by 1.3 (Modify if applicable)

Ref : (1) U Nyi Hla Nge ; "Refresher Course And Field Reference Manual For Site Engineers & Inspectors " ; 1st edition, 2010.
(2) U Nyi Hla Nge ; "Reinforced Concrete Design " ; 1st edition, 2010.
Special Moment - Resisting Frame Detailing

Beams

'
min
=3 c/ y 200/ y _ 34 As, reqd
; As, min < Lap splice confined and located
outside potential hinge area
_ = 0.025
max
_
M n.l Min. 2 bars continuous Mn.r _ 2h
> Hoop or spiral OWNER/APPLICANT
reinforcement

d/4
- s_
<
+ 4" PROJECT
M n.l >_ M n.l/2
PROPOSED 3 STORYED
+ - R.C.C BUILDING
M n.r >_ M n.r/2
+ _
Mn or Mn >_ (max. Mn at either joint) /4
BLOCK NO.

' Note: Transverse reinforcement not shown for clarity LOT NO.
1= 0.85 for c 4000psi
'
= 0.80 for c 5000psi
TOWNSHIP MDY

SUBJECT

Fig. Flexural requirements for beams Fig. Lap splice requirements for beams
GENERAL NOTES

SHEET NO
SCALE
Special Moment - Resisting Frame Detailing contd.
G-06
DATE 26-02-2020

d/4 L.A / S.L.A / R.S.E / PE


Beams contd. 8x smallest long. bar diameter
_
s< 6db ( >
_ 3in. ) extension 6db extension
24x hoop bar diameter Detail B
12"

A
_ 2"
< stirrups with seismic hooks
Hoops

h
Detail A Detail C

Consecutive crossties shall have their 90'


2h s<_d/2 hooks on opposite sides
B
Transverse renforcement A
determined in accordance with
ACI Sec. 21.5.4 at both ends C C
A

Single - and two -piece hoops


Where hoops are required lateral
support for longitudinal bars per ACI Fig. Hoop reinforcement for beams
Sec. 7.10.5.3
s <_ 6"

Section A
Special Moment - Resisting Frame Detailing contd. Special Moment - Resisting Frame Detailing contd.
Columns Columns

OWNER/APPLICANT

l0 A
A
6 x longitudinal bar diameter maximum spacing
S outside of l 0
6" PROJECT
PROPOSED 3 STORYED
R.C.C BUILDING
pg

BLOCK NO.

Tension lap splice within center Larger of C1 or C2 )


LOT NO.
half of member center half of l0 Clear height /6
member length enclosed with Section A 18"
TOWNSHIP MDY
transverse reinforcements per
ACI Sec. 21.6.4
SUBJECT

GENERAL NOTES
0.25 x (smaller of C1 or C2 )
maximum spacing
S 6 x smallest longitudinal bar diameter within l 0
S0
l0 SHEET NO
SCALE

G-07
DATE 26-02-2020

L.A / S.L.A / R.S.E / PE

6db extension maximum


Fig. Longitudinal reinforcement requirements _ 3in.
6db > 0.3 s bc [ ( Ag /Ach ) - 1 ] ( f'c /f yh) spacing within
Ash * _
>
and splice in columns 0.09 s bc f'c /f yh l0
Provide additional
trasversereinforcement
if thickness > 4"

* Provisions of 21.6.5 must also be satisfied


bc = dimension of column core (out to out ) in the direction x
perpendicular to the legs that constitude Ash C2
x
Alternate 90' hooks
Ach = cross sectional area of column core, measured out to out of x_
< 14" on concrete
stirrup steel x x x
h x = max. value of x on all column faces
_ s = 4+ [ ( 14 - h x )/3 ] <
4" < _ 6"
0
C1

Section A-A
Fig. Transverse reinforcement requirements for columns (rectangular hoops)
Structural Integrity Requirements

(-As)/6 (At least 2 Bars)


< 3"
(-As)
OWNER/APPLICANT

Max : slope = 1:6

Minimum (+As)/4
At least 2 Bars (+As) PROJECT
PROPOSED 3 STORYED
R.C.C BUILDING

BLOCK NO.

> 3" LOT NO.

Ld TOWNSHIP MDY

SUBJECT

lap splice
lap splice
Max : slope = 1:6 Max : slope = 1:6
GENERAL NOTES

U.B.L U.B.L
SHEET NO
SCALE

development
Simplified Cutoff Point

tension
length
G-08
DATE 26-02-2020

L.A / S.L.A / R.S.E / PE


L/3 L/3
COLUMN OFFSET

L/8 L/8 L/8

#10 @ 3" c/c #10 @ 3" c/c Max : slope = 1:6


Ld
< 3" > 3"
h

2h 2h

BEAM OFFSET