Вы находитесь на странице: 1из 1

Correction Slips to

Indian Railways Bridge Manual, 1998

IRBM CS. NO.9 dated 27.07.2000

Add new sub-para 317 of chapter III :-

317. Approval of drawings for new lines doublings and Gauge


conversion:

In case of doublings /gauge conversions , General Arrangement


Drawings for all major bridges, bridges where linear water way is being
reduced or vertical clearances are inadequate and where construction is likely
to affect any of the existing bridges, shall be approved by Chief Bridge
Engineer . Besides this, General Arrangement Drawings for bridge
constructed on new lines , which affect the existing bridges, shall also require
the approval of Bridge Engineer.

Вам также может понравиться