DOC. NO: TPL-3452-
X9690-EC-DC-6375
PROJECT : E-LOCO- MADHEPURA
Contents
1 General
1.1 Scope
1.2 IS Codes
1.3 Material properties
1.4 Site Information
3 Design philosophy
4 Analysis of structure
4.1 Basic Loads
4.2 Dead Load
4.3 Imposed Loads
4.4 Wind Load (WL)
4.5 Seismic Loads
4.6 Basic Loads & Load Combinations
5 DESIGN
5.1 Design of Columns
5.2 Design of Footings
5.3 Design of Plinth beams
5.4 Design of Slab
5.5 Design of Roof beams
5.6 Design of lintel
TATA PROJECTS LIMITED DOC. NO: TPL-
3452-X9690-EC-
PROJECT : E-LOCO- MADHEPURA DC-6375
1 General
1.1 Scope
This document covers Structural design criteria for construction of the proposed PRAYER
HALL BUILDING
1.2 IS codes
The Following IS codes have been referred
Wind Speed As per IS 875-part-3 1987 the basic wind speed considered
as 39m/sec
Soil Parameters
The net safe bearing capacity of soil is 12 t/m2
TATA PROJECTS LIMITED DOC. NO: TPL-
3452-X9690-EC-
PROJECT : E-LOCO- MADHEPURA DC-6375
FFL RL 44.30
FNL RL 41.50
3 Design philosophy
The structure will be designed for Ground Floor .The structure will be modelled as a space
frame and structural packages such as STADD PRO will be used for the design and analysis
of the structure
All reinforced concrete structures will be designed in accordance with IS:456-2000: - Codes of
Practice for Plain and Reinforced Structures”, adopting limit state method and detailing as per
IS 13920
4 Analysis of structure
Description
Load KN/m2
For Terrace
RCC Slab thk 0.15*25 3.75
Roof finishes 0.05*25 1.25
Brick bat coba 0.075*21 1.575
6.575 Kn/m2
TATA PROJECTS LIMITED DOC. NO: TPL-
3452-X9690-EC-
PROJECT : E-LOCO- MADHEPURA DC-6375
Vz = 47 m/s
Pz = 1325.4 N/m2
Say 135 Kg/m2
W (seismic weight) = Full dead load of structure + 25% /50% of imposed loads
As the building ht ( above ground level ) is less than 40m, the building will be analysed by the
seismic coefficient method .
5.2.1 Reactions
Horizontal Vertical Horizontal Moment
Force-X Force-Y Force-Z Moment-X Moment-Y Moment-Z
Node L/C Mton Mton Mton MTon-m MTon-m MTon-m
1 1 -1.374 -2.231 0.124 0.112 -0.021 2.294
2 -0.018 -3.588 -2.796 -5.731 0.035 0.038
7 0.45 31.215 1.573 1.419 -0.161 -0.377
9 -0.001 0.78 -0.014 -0.012 -0.013 0.002
2 1 -1.374 -2.231 -0.124 -0.112 0.021 2.294
2 0.018 3.588 -2.796 -5.731 0.035 -0.038
7 0.45 31.215 -1.573 -1.419 0.161 -0.377
9 -0.001 0.78 0.014 0.012 0.013 0.002
7 1 -1.817 0.634 0.01 0.013 0.002 2.7
2 -0.036 -1.02 -1.252 -4.825 0.027 0.053
7 -0.245 29.464 1.443 3.392 -0.126 0.26
9 0.002 1.192 0.155 0.373 -0.015 -0.001
8 1 -1.817 0.634 -0.01 -0.013 -0.002 2.7
2 0.036 1.02 -1.252 -4.825 0.027 -0.053
7 -0.245 29.464 -1.443 -3.392 0.126 0.26
9 0.002 1.192 -0.155 -0.373 0.015 -0.001
13 1 -1.371 2.946 0 0 0 2.292
2 -0.033 -1.788 -1.593 -3.54 -0.079 0.05
7 -0.535 29.475 2.19 1.98 0.153 0.523
9 0.002 0.637 -0.076 -0.063 0.017 -0.001
14 1 -1.371 2.946 0 0 0 2.292
2 0.033 1.788 -1.593 -3.54 -0.079 -0.05
7 -0.535 29.475 -2.19 -1.98 -0.153 0.523
9 0.002 0.637 0.076 0.063 -0.017 -0.001
23 1 -0.757 -0.75 0.002 0.002 0 2.067
2 0.028 -0.716 -0.398 -0.685 0.043 -0.008
7 0.207 4.438 0.023 0.022 0 -0.037
9 0.002 0.19 -0.004 -0.003 0 0
24 1 -0.757 -0.75 -0.002 -0.002 0 2.067
2 -0.028 0.716 -0.398 -0.685 0.043 0.008
7 0.207 4.438 -0.023 -0.022 0 -0.037
9 0.002 0.19 0.004 0.003 0 0
33 1 -1.816 -0.6 -0.001 -0.001 0 2.699
2 -0.039 -0.88 -1.095 -4.261 -0.131 0.056
7 0.122 29.477 1.469 3.436 0.125 -0.078
9 -0.004 1.192 0.158 0.38 0.014 0.004
34 1 -1.816 -0.6 0.001 0.001 0 2.699
2 0.039 0.88 -1.095 -4.261 -0.131 -0.056
7 0.122 29.477 -1.469 -3.436 -0.125 -0.078
9 -0.004 1.192 -0.158 -0.38 -0.014 0.004
TATA PROJECTS LIMITED DOC. NO:
TPL-3452-
X9690-EC-DC-
PROJECT : E-LOCO- MADHEPURA
6375
Concrete M25
SNO Footing Footing Size Details in mm Footing Reinforcement (B) Footing Reinforcement (T) No of FOOTING
Node-no columns MKD
FOOTING NODES
1 7 33 13
23
24
Y X
Z
Load 0
2 8 34 14
TATA PROJECTS LIMITED
DOC. NO: TPL-
3452-X9690-EC-DC-
PROJECT : E-LOCO- MADHEPURA 6375
Design of footing
Ox = 0.55 m
Oy = 0.63 m
BMx = 1.43 tm
bx = 1.50 m
M/bd2 = 0.10
pt = 0.02
Ast = 104.81 sqmm
Ast per metre width = 69.87 sqmm
Provide Y10-175 = 448.57 sqmm minimum Ast = 450 sqmm
pt = 0.14
Bmy = 0.82 tm
by = 1.50 m
M/bd2 = 0.05
pt = 0.01
Ast = 59.92 sqmm
Ast per metre width = 39.94 sqmm
Provide Y10-175 = 448.57 sqmm minimum Ast = 450 sqmm
pt = 0.14
TATA PROJECTS LIMITED
DOC. NO: TPL-
3452-X9690-EC-DC-
PROJECT : E-LOCO- MADHEPURA 6375
Shear Design :
tpeff. = 0.32
(A) Check for Two Way shear (ie Punching shear)
Desiged P = 6.49 t
a1 = 0.715 m
a2 = 0.565 m
t1 = 0.375 m
t2 = 0.375 m
a1 = 1.500 m
a2 = 1.500 m
_ indicates shear
section falls out
of the footing
TATA PROJECTS LIMITED
DOC. NO: TPL-
3452-X9690-EC-DC-
PROJECT : E-LOCO- MADHEPURA 6375
Design of footing
Ox = 0.95 m
Oy = 0.85 m
BMx = 12.20 tm
bx = 2.20 m
M/bd2 = 0.56
pt = 0.13
Ast = 914.82 sqmm
Ast per metre width = 415.83 sqmm
Provide Y12-150 = 753.33 sqmm minimum Ast = 450 sqmm
pt = 0.24
Bmy = 11.03 tm
by = 2.20 m
M/bd2 = 0.51
pt = 0.12
Ast = 825.31 sqmm
Ast per metre width = 375.14 sqmm
Provide Y12-150 = 753.33 sqmm minimum Ast = 450 sqmm
pt = 0.24
TATA PROJECTS LIMITED
DOC. NO: TPL-
3452-X9690-EC-DC-
PROJECT : E-LOCO- MADHEPURA 6375
Shear Design :
tpeff. = 0.32
(A) Check for Two Way shear (ie Punching shear)
Desiged P = 47.14 t
a1 = 0.615 m
a2 = 0.815 m
t1 = 0.375 m
t2 = 0.375 m
a1 = 2.200 m
a2 = 2.200 m
_ indicates shear
section falls out
of the footing
TATA PROJECTS LIMITED DOC. NO: TPL-
3452-X9690-EC-
PROJECT : E-LOCO- MADHEPURA DC-6375
5.5
Roof beam schedule
RB1 9 10 20 19 3-Y12(ST)+2-Y12(X) 3-Y12(ST) Y8-100 @ support And Y8-
250 x600 @ supp 150@ mid
49 51
RB2 3-Y20(ST)+3-Y16(X) 3-Y16(ST)+2- Y8-100 @ support And Y8-
6 26 250 x 600 @ supp Y12(X) span 150@ mid
5.6.
Portico beam schedule
T1 3-Y12(ST)+2-Y12(X) 3-Y12(ST) Y8-100
40 42 250 x300 @ supp
Load calculation :
Span Moment Mu Mu/bd² Pt Ast reqd Min Ast Dia of bar Spacing Ast pro
mm
Coefficient kN.m N/mm2 % mm² mm² mm mm²
shorter x neg 0.093 18.76 1.30 0.32 384.21 144 10 175 448.80 safe
x pos 0.071 14.32 0.99 0.24 288.40 144 10 175 448.80 safe
longer y neg 0.000 0.00 0.00 0.00 0.00 144 8 200 251.33 safe
y pos 0.043 8.67 0.60 0.14 171.15 144 8 200 251.33 safe
186.36
0.58*500*(288.40/448.80)
TATA PROJECTS LIMITED
DOC. NO: TPL-3452-
X9690-EC-DC-6375
PROJECT : E-LOCO- MADHEPURA
Load calculation :
Span Moment Mu Mu/bd² Pt Ast reqd Min Ast Dia of bar Spacing Ast pro
mm
Coefficient kN.m N/mm2 % mm² mm² mm mm²
shorter x neg 0.000 0.00 0.00 0.00 0.00 115.2 8 200 251.33 safe
x pos 0.056 5.07 0.55 0.13 124.59 115.2 8 200 251.33 safe
longer y neg 0.000 0.00 0.00 0.00 0.00 115.2 8 200 251.33 safe
y pos 0.056 5.07 0.55 0.13 124.59 115.2 8 200 251.33 safe
143.76
0.58*500*(124.59/251.33)
HBS INFRA ENGINEERS INDIA PVT LTD
#REF!
STRUCTURAL DESIGN REPORT FOR PROPOSED PRAYER HALL BUILDING
S3 Roof slab
Design of Slab
Here the aspect ratio Ly/Lx is greater than 2 hence the slab is designed as a one way way slab.
The maximum shorted span (2.32m c/c OF beams) considered for design
Load calculation :
Min
Mu Mu/bd² Pt Ast reqd Ast Dia of bar
Spacing Ast pro
2
kN.m N/mm % mm² mm² mm mm mm²
18.60 1.41 0.35 399.79 138 10 175 448.80 safe
3d MODEL
TATA PROJECTS LIMITED
DOC. NO: TPL-3452-
PROJECT : E-LOCO- MADHEPURA X9690-EC-DC-6375
FOOTING NODES
1 7 13
23
24
L
2 8 14
L
2 TATA PROJECTS LIMITED8 14
DOC. NO: TPL-3452-
PROJECT : E-LOCO- MADHEPURA X9690-EC-DC-6375
7 17 44
3
29
30
28
23
31
27
Load 0
8 18 45
Load 0
8 18 45
9 19 49
16
53
26
6
Load 0
10 20 51