BSP 7.0 MT Expansion- List of Major and Balance Packages as on 17.02.

2018

SL. PKG NO Package Name Major/ Draft TS FTS Price Bid Contract Turn Non-
NO. Balance Issued Opened Signed key Turnkey
(T) (N-T)
T NT T NT T NT T NT T NT

Major
1 001-SE-01 Coke Oven Battery no. 11 M 1 1 1 1 1
2 001-SE-02 Coke Oven Machines M 1 1 1 1 1
3 001-SR-03 COB-11 - Silica Bricks & Mortar M 1 1 1 1 1
4 001-SR-04 COB-11 - Fire Clay Bricks & Mortar` M 1 1 1 1 1
5 001-SR-05 COB-11 - Insulation Bricks & Mortar M 1 1 1 1 1
6 002 CDCP M 1 1 1 1 1
7 003A COB-11 - By Products proper & H2S M 1 1 1 1 1
8 010 BF # 8 M 1 1 1 1 1
9 011-01A Boiler Pkg M 1 1 1 1 1

10 011-01B Steam Turbine M 1 1 1 1 1

11 011-01C DM Plant M 1 1 1 1 1

12 012 Turbo Blowers and Auxiliaries M 1 1 1 1 1


13 020 Second Sintering Machine (360 m2) in SP-3 M 1 1 1 1 1
14 025 BOF Shop Technological Package M 1 1 1 1 1
15 025A Secondary Steel Refining 1 1 1 1 1
16 026 Continuous Casting Shop – Technological Package. M 1 1 1 1 1

17 027 Hot Metal Desulphurization (2 Nos.) M 1 1 1 1 1


18 029A/1 Main Cranes for BOF and CCP(Above 100 T)-7 M 1 1 1 1 1
CRANES.
19 029A/2 Main Cranes for BOF and CCP(Above 100 T)-10 M 1 1 1 1 1
CRANES.
20 033A Civil Works for BOF, CCP Shop. M 1 1 1 1
1
21 033A1 Pilling works M 1 1 1 1 1
22 033B Structural Works for BOF, CCP Shop. M 1 1 1 1 1
23 046 Bar and Rod Mill. M 1 1 1 1 1
24 047 Universal Rail Mill. M 1 1 1 1 1
25 049-3 Reheating Furnaces for Universal Rail Mill. M 1 1 1 1 1
26 049-1 Reheating Furnaces Bar & Rod Mill, M 1 1 1 1 1
27 051A/1 Civil Works for Bar & Rod Mill M 1 1 1 1 1
28 051B/1 Structural Works for Bar & Rod Mill M 1 1 1 1 1
29 052A Civil Works for Universal Rail Mill M 1 1 1 1 1
30 052B Structural Works for Universal Rail Mill M 1 1 1 1
1
31 060 Augmentation of ore handling plant part - A M 1 1 1 1
1

32 061 New ore handling plant part - B M 1 1 1 1 1


33 062 New coal handling plant M 1 1 1 1 1
34 064 Fuel and Flux Crushing and Screening Systems for M 1 1 1 1
SP-III (Residual of Base Blending has been merged 1
with Pkg 063)
35 070 Augmentation of MSDS-I, III, IV, V and VI along with M 1 1 1 1
associated HT network, 11 KV switch boards linked
in MSDS buildings and the new transformer repair 1
shop
36 071A HT S/S For all major packages. M 1 1 1 1 1
37 114 Centralized Compressed Air Station – Part-A (for M 1 1 1 1
relocation of compressed air station No. 2) 1

38 003C BOD Plant M 1 1 1 1 1


39 029B1 Main Cranes for BOF and CCP(Below 100 T) M 1 1 1 1 1
40 029B2 EOT Cranes, Repair Trollies & Under Slung Cranes M 1 1 1 1
1
-SMS-III
Total 40 Nos. M 33 7 33 7 33 7 33 7 33 7

Balance
1 021A New Cold sinter Screening System & Hearth Layer B 1 1 1 1 1
Feeding Arrangement, Sampler (including
electricmotors) & Dismantling of existing Lab
Building
2 021B Lime Dosing alongwith tankers & compressor, B 1 1 1 1 1
Sinter cooler (Sealing & segregation Chute), PU/PE
liners in bunkers (12Nos.)
3 021C Replacement to B.W.F. & belt weigh scales, Load B 1 1 1 1 1
cell mounting of mix bins above roll feeders (4Nos.)
PLC/PC based automation & control as well as
instrumentation including N2 network for control
valve actuation (including electrics of 021A & B as
required) complete with associated civil work.

4 021D Plant dedusting including dust disposal & handling, B 1 1 1 1 1


water supplies & other utilities along with
associated electrics(for new cold sinter screening
slag.)

5 011-02 Enabling Works of 011-01 B 1 1 1 1 1

file:///conversion/tmp/scratch/472271567.xls Page 1 of 3
SL. PKG NO Package Name Major/ Draft TS FTS Price Bid Contract Turn Non-
NO. Balance Issued Opened Signed key Turnkey
(T) (N-T)
6 011-03 Relocation of SMS Repair shop & SMS Testing B 1 1 1 1
laboratory 1

7 025B Sandwhich Panel for SMS Area B 1 1 1 1


1

8 026A 100T Trailer B 1 1


1

9 028 Lime Calcination Plant B 1 1 1 1 1


10 029C Lift in SMS 1 1 1 1 1
11 030 Cranes for Rolling Mills B 1 1 1 1 1
12 030A 5T EOT Cranes for URM B 1 1 1 1
13 031 Hot Metal Handling System (Torpedo) B 1 1 1 1 1
14 032 LPG Storage and Distribution System B 1 1 1 1 1
15 037 Centralized Telecommunication System for full B 1 1 1
expansion including Basic Internal Telecom 1
Facilities for Bar & Rod Mill , URM & Rail Welding
1
16 038-01 Augmentation facilities of Material Handling system B 1 1 1 1
for SMS-II 1

17 038-03 Gas cleaning plant rectification B 1 1 1


18 038-05 Combined blowing of Argon/ Nitrogen in Converters B 1 1 1
19 038-06 Modernisation of BOF automation system and B 1 1
replacement of existing electrics and
instrumentation facilities and analog electrical drive 1
system

20 038-12 Dedusting of Lime facilities at +47m level. B 1 1 1 1 1


21 070A MSDS(Additional) 1 1 1 1
22 071B Power factor compensating equipment. B 1 1 1
23 075 Interplant fuel gas and industrial gases piping for all B 1 1 1 1
1
units
24 075A Energy Mointoring B 1 1 1 1 1
25 075B Buffer Vessel B 1 1 1 1 1
26 076 Gas mixing and boosting stations B 1 1 1 1
1
077-01 Water supply system for BOF, CCP including B
reheating furnaces (beyond battery limit)(RPN
Issued)
27 077-01A Balance Turnkey Pkg, B 1 1 1 1 1
28 077-01A1 Balance Civil Works of Essential Facilities B 1 1 1 1 1
29 077-01A2 Balance Civil Work for WTP-2 B 1 1 1 1 1
30 077-01D Structural Work for EOHT B 1 1 1 1 1
31 077-01F Structural gallery for BOF & Caster B 1 1 1 1 1
32 077-01G TEMPORARY SUPPLY OF DM WATER &
INDUSTRIAL WATER FOR DIRECT AND INDIRECT
COOLING WATER CIRCUITS of BOF, SRU and CCP B 1 1 1 1 1
of SMS-III
077-02 Water supply system for Bar and Rod Mill and B
Universal Rail Mill including reheating furnaces
(beyond battery limit)
33 077-02A Balance Turnkey Pkg, B 1 1 1 1 1
34 077-02B1 Civil Work for WTP-5 B 1 1 1 1 1
35 077-02B2 Erection for Balance Mechanical Equipment B 1 1 1 1 1
36 077-02B3 Civil & Structural for WTP-1,2,3,4,6&7 including Pipe B 1 1 1 1
1
cum Cable Gallery and Tunnel.
37 077-02B4 Erection of Balance Electrical and Automation B 1 1 1 1 1
38 077-02C-1 Civil work for RCC Overhead Tanks(2 Nos.) for URM B 1 1 1 1
1
& BRM.
078 Make water supply system augmentation(RPN B
Issued)
39 078A Balance Turnkey Pkg. B 1 1 1 1
40 078B1 Balance Piping Work -STB B 1 1 1 1 1

41 078B2 Civil Works for balance Piping and Cable Gallery - B 1 1 1 1 1


STB
42 078B3 Structural Work for balance piping and Cable B 1 1 1 1 1
Gallery - STB
43 078C Civil Work for IWPH,DWPH,MWPH & ECRs B 1 1 1 1 1

44 078D Erection of Balance Mechanical Equipment B 1 1 1 1 1

45 078E Erection of Balance Electrical Equipment B 1 1 1 1 1

46 090A Laboratory Equipment B 1 1


1

47 095B Railway tracks at peripheral yard, works stations, B 1 1 1 1 1


rolling mill posts, plate mill yard, MGR system from
Maroda Station, BF-8 to SMS-III, SGP yard, billet
dispatch yard.
48 096 Route Relay Interlocking or Solid State Interlocking B 1 1 1
System including construction of signal buildings at
peripheral yard, BF-8 to SMS-III, Works Station No. 2
and rolling mill post no. 2

49 098-II Procurement of Mobile Road Transport B 1 1 1 1


Equipment (Truck, Dumper Cement Tanker etc.,

file:///conversion/tmp/scratch/472271567.xls Page 2 of 3
SL. PKG NO Package Name Major/ Draft TS FTS Price Bid Contract Turn Non-
NO. Balance Issued Opened Signed key Turnkey
(T) (N-T)
50 098-III Procurement of Fire Tender. B 1 1 1 1
51 098-4 Procurement of fire extinguishers for service B 1 1 1
1
building beyond respective packages 1
52 099A RAIL & Road Weigh Bridge B 1 1 1 1 1
53 099B Hot Metal Rail Weighbridge(Re-Tender)
54 100-2 Roads B 1 1 1 1 1
55 100-3 Storm water draingae system. B 1 1
1
56 100-4 Road Toping
57 110 Survey of new sites and soil testing. B 1 1 1 1 1
58 111-01 Construction of Flyovers and Road Network. B 1 1 1 1 1
59 113 Relocation of TSS and construction power. B 1 1 1 1 1
60 114A CAS for Mills 1 1 1 1 1
61 116A PSS Stores. B 1 1 1 1 1
62 116B1 Installation of LT Substation in Tap Hole Mass Shop. B 1 1 1 1
1

63 116B2 Tap hole Mas Shop(with LT Supply). B 1 1 1 1 1


64 117 Project building and other site offices and stores B 1 1 1 1 1
65 117A Internate Networking B 1 1 1 1 1
66 118 Dismantling Works – PART-A B 1 1 1 1 1
Dismantling Works – PART-B
(Sub packages A to I)
67 118R LT Substation-50B and Replacement of existing B 1 1
substation -9B& 9H(Retendered) 1

68 119-01 Relocation of Mech.repair Shop & Quenching car B 1 1 1 1 1


repair shop in c b-11 area. (Civil,Strl,Gl& T &
dismantling)
69 119-02 Relocation of Mech.repair Shop & Quenching car B 1 1 1 1 1
repair shop in c b-11 area.(Electrical)
70 119-03 Relocation of Mech.repair Shop & Quenching car B 1 1 1 1 1
repair shop in c b-11 area.(Technological Services)

71 120 Construction of Bulk Stores. B 1 1 1 1 1


72 121 Rail Welding of long Rail Lines. B 1 1 1 1 1
73 123 Ferro-alloys Storage Yard B 1 1 1 1
74 124 Refractories for BOF & CCP ( excl. Special B 1 1 1 1
Refractories) 1
75 125-01 ACVS for BOF & CCP, B 1 1 1
1 1

76 125-02 ACVS for Bar & Rod Mill , URM & Rail welding B 1 1 1 1
1

77 126-01 Gas & Water based Firefighting System for BOF & B 1 1 1 1
CCP, 1

78 126-02 Gas & Water based Firefighting System for Bar & B 1 1 1 1
Rod Mill , URM & Rail Welding 1

79 127 Illumination ,Earthing & Lightning protection system B 1 1 1


for SMS-3(BOF,CCP,HMDS &SRU) (Inside Shops) 1
(Retendered) 1
80 127A Dewatering Pump B 1 1
1

81 127B Balance Electrical in SMS-III B 1


1

82 128 Illumination ,Earthing & Lightning protection system B 1 1 1 1


for Bar & Rod Mill , URM & Rail Welding (Inside 1
Shops)

83 129-A BOF & CCP Area Repair Shop B 1 1 1


84 129-B CCP Mould Area Repair Shop(Equip. 1) B 1 1 1
85 131A BOF & CCP Equipment erection B 1 1 1 1 1
86 134 Pneumatic conveying for sample conveying B 1 1 1 1 1
87 136 Area Lighting of plant premises B 1 1 1
88 137 Procurement of Wagons 20 nos B 1 1 1 1 1
89 138 Fire Station Building B 1 1 1 1
90 140 Pipe Conveyor from RMP-III to RMP II & RMP-III to B 1 1 1 1
Sinter Plant for Lime 1

91 142-01 Roll Shop for URM B 1 1 1 1 1


92 142-02 CNC Machine B 1 1 1 1 1
93 144 Rerouting of existing Ash Slurry Pipeline. B 1 1 1 1 1
94 145 PWN connectivity B 1 1 1 1
95 047-01 Drop Test Facility for URM B 1 1 1 1 1
Total (75 Nos.) 57 36 56 36 45 34 37 34 57 36

Major 33 7 33 7 33 7 33 7 33 7
Balance 57 36 56 36 45 34 37 34 57 36
Total 90 43 89 43 78 41 70 41 90 43
133 132 119 111 133