UNTUK KONDISI NORMAL PROJECT

Changes

VARIATION initiated
Go to S.C 3.3 Verbal/etc
(by Engineer S.C 13.1)

EI
Request Contractor (Co) to submit
PROPOSAL (~ RVO; ~ Estimate)
(Kalau yakin atas efeknya) Krn EI tdk selalu VO (see 3.3)

OR

Comply to submit Proposal w/


NO EFFECT EFEK EFEK
Programme modif (8.3) + Cannot do + Reason
On Terhadap terhadap
Evaluation Proposal for Variation
T (time) + C (cost) C
Saja
(VO)
OR C
T+C
(VO)
Rate
Bentuk bisa VE (13.2) Bukan VE
(datang dari Co) (berarti sesuai arahan Eng.)
Prelim C Disruption C
BQ New

Eng Respond As Soon As


Practicable
whether Perlu
disepakati
durasi nego

Not Approved Comments Approved VO


VO SOP VO SOP Claim SOP
SOP

S.C 13.3
Jadi tidak ada ON/STARTS
Claim Mechanism disini VO Mechanism/SOP
(krn Cost & EOT sdh disetujui)

& murni masuk ke See last paragraph 13.1


Payment Mechanism / SOP Co do VO works when :
Yaitu sesuai %progress & S.C 14.6, etc
28d + 28d  Eng. Instruct a Variation (EI),
or
 Eng approves a Variation
Note : Untuk semua yang sifatnya belum fixed : (ini membuat rancu krn ini berlaku umum & tidak
 Untuk kondisi Project TIDAK NORMAL  New rate merujuk kpd 13.3 VO Mechanism / SOP untuk
(EI tidak explicity status for Variation)  EOT Proposal ~ pada Fidic 2017 dihilangkan)
maka EI/PMI di-treat dengan cara  Proposal/RVO/Estimate
memberi NOTICE yaitu Notice of  Etc
Variation = Claim, yang artinya Harus masuk ke SOP Proposal/ RVO, agar Krn Co bisa argue bahwa pilih untuk di approve
menggunakan CLAIM Mechanism / SOP fair & perlu ada limit durasi untuk propses dulu VO nya baru kerja (krn ada kata “or” diatas
 Mechanisme = Procedure = SOP nego (F.2017 sudah ada) sehingga Co boleh pilih)
Fidic 99 General & Particular Condition at Thamrin 9 in relation to Variation Works
procedure (starts from received PMI)

42d repetititve (not explicitly mentioned in s.c


20.1)
Therefore, can be applied AS SOON AS
PRACTICABLE (see #)

Respond
Contractor (C) C negative
Serve Notice of PM have
received PMI to Submit Detail
28d Variation 14d 42d to respond
sign Claim # (for
* *
* GC 20.1 GC 20.1 Evaluation) GC 20.1 para
6

Respond
positive

C submit Monthly
Contractor (C) IPC
Progress
submit for issued by Payment
?d Statements (s.c 14d 28d
Evaluation PM to due
14.3)
# PC 14.6 Employer PC 14.7 b
##

* Notes:
 Since there is Employer’s note in the PMI ‘the instruction in does not constitute any adjustment to cost and or time’ therefore TOTAL PM once
received the hardcopy to sign then put his note first in every PMI as follows: “in this PMI has a potential Cost and or Time effect”. Even there is
no Employer’s note as above but is a compulsary for TOTAL PM to put the said note for early protection. And if necessary can add in “the
variation detail will be submitted in due course”
 Then afterwards Commercial / TOTAL submitting the Notice of Variation (template already provided) as in accordance with Sub-Clause 20.1 to
comply with 28 days time bar
 Within 14d afterwards C submit detail claim
 Then within 42d PM shall to respond with approval or disapproval and detailed comments
 PM gave respond positive (Approval) then can go to ## Monthly Progress Statement
 The above procedure quiet different to my previous mechanism as sent to PGW (therefore I made a dark box as above left side)

# Notes: ## Notes:
 C submit for Evaluation according to Clause 12 [Measurement & Evaluation]. In s.c 12.3  Content of Contractor Monthly Progress
last para that ‘until such time as an appropriate rate or price is agreed or determined, the Statements submission includes Variations (s.c
PM shall determine a provisional rate or price for the purposes of Interim Payment 14.3 a)
Certificates (IPC)’.  At this stage means considered VO
 In reality, works has been done at this stage therefore according to s.c 14.3 (a) that Recommendation by QS and await PM
‘estimated contract value of the Works executed including Variations’ is entitled (able to acceptance or comments or disapproval
certify / payable) including PM certification (considered within 14
 Refer to s.c 13.3 [Variation Procedure] part thereof ‘The PM shall, as soon as days)
practicable, after receiving such proposal or otherwise, respond with approval, 
disapproval or comments’
 For ‘?d‘ based on TBP’s monitoring table that has happened in months duration after the
Works done – it is consider too long
 pursuant to General Condition Sub-Clause 1.3, 3.3 and 1.13 The Contractor expects to
have response/resolution without delay