Management and Service Science (MASS), 2011 International Conference on

Management and Service Science, Wuhan, China

Project Management and Project Integration Management


In Relationship with Service Marketing

Rashad Yazdanifard 1 Tshepo Molamu 2


Faculty of Information & Communication Technology, Faculty of Information & Communication Technology,
Limkokwing University of Creative Technology, Limkokwing University of Creative Technology,
Cyberjaya, Malaysia Cyberjaya, Malaysia
rashadyazdanifard@yahoo.com tshepomolamu@yahoo.com

Bitner, Fisk and Brown [4] suggest that the major


Abstract– The ne w economy made it necessary for output from the services marketing literature up to 1980
researchers to focus on service marketing due to products was the definition of four services characteristics:
not being successful on their own. Marketing techniques intangibility, inseparability, heterogeneity and
have changed from traditional which was based mostly on perishability of which made services marketing
goods only, goods and services to services only which make different from the marketing of products. Service
it even easier for service marketing to succeed since its marketing projects is a venture undertaken to
ne w and have higher demand. Therefore this article
e xplains what service marketing is, factors leading to
accomplish a service within a specific duration of time
projects success. It explains the project processes and gives and following specific objectives.
re asons why projects fail . The article is based on a
literature review that presents the relationship between II. SERVICE MARKETING STRATEGIES
se rvice marketing, project management and project
integration management. Studies of service firms suggest that the exporting
behavior of service operators is influenced by a number
Keywords – Service Marketing, Project Management, of environmental factors, but that the impact of these
Project Integration Management, Project Processes, project factors is likely to be stronger for service firms than for
failure. manufacturing firms, also indicate that barriers to the
international marketing of services are mostly due to the
I. INTRODUCTION close cultural relationships between a society and the
services offered in that society’ [7]. Services firms
Economy has made business organizations should apply a customization on performance strategy
marketing format to change from products only to either since it is not costly due to its benefits being more
both products and services or services only. Therefore higher compared to products.
to start with what a service exactly is; a definition from There are several strategies that if a service firm
American Marketing Association, Committee of follows them, they can find their way through a market
Definitions [1, p. 21]defines service as activities, place. According to An-Shin Shia and Jason C. Hung
benefits and satisfactions, offered for sale or provided in [2], here are some of them; Pricing strategy, Channel
connection with the sale of goods whereas Quinn, strategy, Promotional strategies, Human capital
Baruch and Paquette [16] refers to it as all economic strategy, Service cost strategy.
activities whose outputs are not physical products or
construction. According to Jeffrey Tarter [8], the sale of III. PROJECTS PROCESSES
services generally means buying the time and skills of a
live person such as a lawyer, an accountant, an auto Rebecca Dozier [17] indicates the five project
mechanic. Therefore personal chemistry quite processes as; The Initiating process, Planning processes,
reasonably plays a role in our choice of service Executing processes, Control processes and Closing
providers, to make judgments among services’ quality, processes.
according to Parasuraman A, Zeithaml V.A, and
L.L.Berry [14], customers use five dimensions such as, A. Project Initiation
reliability, responsiveness, assurance, empathy, and Rebecca Dozier [17] indentifies the initiating process
tangibles which are based on the comparison between as a process which identifies that a project should begin
the expected and perceived quality. and that resources should be committed to it. According
to Upravljanje projektima [20], project initiation are 1. Control measures
processes carried out to approve and define the scope of The use of control procedures is an important factor
a new phase or project or that can result in the in the project’s success. According to Shai Rozenes,
continuation of halted project work. Gad Vitner, Stuart Spraggett[18], findings showed that
the success level of a project implementing a specific
B. Project Planning control method is related to the level of risk measured
Projects need to be planned for better results, by situational factors. Another factor is risks; they must
therefore to test the value of a project plan, the PMPQ always be taken care of as they can cause project
(Project Management Planning Quality) model is used collapse. Shai Rozenes, Gad Vitner, and Stuart
which evaluates the overall quality of the project Spraggett [18] indicate the two common risks that have
planning. The model is based on the processes to be a major significant impact on project effectiveness: (1)
performed during the planning stages of a project, by the team’s lack of general expertise; and (2) lack of
both the project manager and the organization to which clear role definitions for team members. The success
the project manager belongs to [13]. According to performance of a project depends on appropriate
Simon Buehring [19], a good planning is lead by planning.
understanding the projects objectives. An abstract plan Control cycle include, planning, measuring,
can be produced which can serve as the starting point monitoring and taking corrective action. Typically,
for all planning problems that differ only in the number projects utilize a control system, which monitors the
or amount of resources present and thereafter, based on difference between the planning variables and the actual
the actual resource availability will be allocated results. Project control systems show the direction of
resources to produce an executable plan [3]. According change in preliminary planning variables compared
to Rebecca Dozier [17], planning processes involves with actual performance [18].
devising and maintaining a workable s cheme to
accomplish the project objectives. 2 .Project management Techniques
Simon Buehring [19] indicates the top 7 project
C. Project Execution management success practices as follows, define the
Executing processes is where the actual project Scope and Objectives, Define the Deliverables, Project
work is done. It involves people coordination and other Planning, Communication, Tracking and Reporting
resources to carry out the plan [15]. Project Progress, Change Management, Risk
Management. According to Merrill S.K, PMP [11],
D. Project Control Process Project integration management refers to the processes
Control processes monitors, measures and takes and activities needed to integrate the various elements
corrective action when necessary to ensure project of project management, which are identified, defined,
objectives are met. These processes focus on combined, unified, and coordinated within the Project
influencing future results rather than fixing past Management Process Groups. Marc Hirshfield and
mistakes [17]. According to PMBOK3 [15, p. 28], it Peggy Daniels Lee [10] states that; gaining physician
means guaranteeing that project objectives are met by and administrative commitment to the project and
monitoring and measuring progress and taking ensuring that enough time is spent on project planning
corrective action when necessary. improves the chances of project success.

E. Project Closure V. WHY PROJECTS FAIL?


Rebecca Dozier [17], Closing processes to formalize
project acceptance and bring it to an end. It is during Nadim F. Matta and Ronald N. Ashkenas [12], if
this process where significant historical information managers fail to predict everything that might fall
about the project is generated, PMBOK3 [15, p. 28] through the cracks, those tracks will not converge
defines it as formalizing acceptance of the project or successfully at the end to reach the goal. Respondents
phase and bringing it to an orderly end. of a research carried out by the Coverdale Organization,
Cushing [6], identifies key factors in project failures as
IV. PROJECT SUCCESS AND PERFORMANCE the estimation mistakes, unclear project goals and
objectives, and project objectives changing during the
Project management and project integration project. Cynthia K. West [6] identified the four
management are very important roles in project success, common risks as; Lack of Visibility of all Projects,
Shai Rozenes, Gad Vitner, Stuart Spraggett[18], Unclear Project Objectives, No Visibility into Resource
explains the control measures technique while Simon Workload and Gaps in Communication. According to
Buehring [19] gives the top 7 project management Lisa Anderson [10] there are three stumbling blocks to
success practices. Furthermore, Merrill S.K, PMP [11] project success as; lack of clearly designated project
and Marc Hirshfield and Peggy Daniels Lee [10], gives leader, lack of clear expectations and goals and lastly
their views on project success and performance issues. common communication challenges.
VI. DISCUSSION and project integration management; this result from
good and well skilled project managers working
For an organization to go global or worldwide it together with project team members.
starts with good marketing strategies and service Project integration management is an important role
business just like product one needs those for a good in any project's success. It ensures that all of the
business foundation. A service marketing project is a elements that are necessary to complete a successful
temporary enterprise undertaken to create a unique project come together. On the other hand project
service within a specific duration. Therefore for the management is also an important and a basic aspect in
project to succeed it has to enforce project management every project for its success. It covers all the five
factors, such as the control measure and planning projects processes of which if correctly followed, leads
techniques, project integration management to projects success. From project process, project
Project planning is the backbone of the whole managers manage risks during planning process which
project; this gives project managers the responsibility to is one of the main factors leading to project failure,
have main focus on it. From planning, managers can hence showing the importance of the project planning
identify the risks that might happen and be able to phase.
provide alternatives to avoid them or reduce the chances The overall responsibility of the project, whether it
thereby reducing the changes of product failure. A good fails or succeed is based on the project managers. They
project planning leads to a project success. are the one to define the project objectives, make the
Every project carried out undergoes five project plan, ensure the work is done by demanding for process
processes. Project initiation is done for beginning and report and make corrections where necessary well in
defining project objectives and for establishment of the time. They have to make sure both stakeholders and
appropriate and quality environment required to team members as well as team leaders are involved in
complete a certain project. After understanding the every step.
project objectives, project planning must be done by
project managers, presenting all aspects needed for the REFERENCES
project such as the people, environment and materials
needed as well as the time required. Most work is done [1] American Marketing Association, Committee of
in executing process where activities are now Definitions, p. 21, 1960.
performed. It will then pass to control process to [2]. An-Shin Shia and Jason C. Hung, “Marketing
monitor and correct any necessary mistakes and finally strategies of Sunhow appliances in Taiwan”, Volume 9,
the closing project that ends the whole project once the No.8 (Serial No.86), August 2010.
deliverable is produced. Project integration [3] Biplav Srivastava, Subbarao Kambhampati, Minh B.
management and project management are very Do, “Planning the project management way: Efficient
important roles in every project success. They include planning by effective integration of causal and resource
the role of skilled project managers working together reasoning in RealPlan”, Department of Computer
with stakeholders as well as project team to ensure that Science and Engineering, Arizona State University,
projects objectives are met. Tempe, AZ 85287-5406, USA Received 27 July 2000;
received in revised form 9 January 2001.
VII. CONCLUSION [4] Bitner M.J., Fisk R.P. and Brown S.W. “Tracking
the Evolution of the Services Marketing Literature”,
Service marketing is very important in the society to Journal of Retailing, 69, 1, 61 – 103, 1993.
enhance human life. This means buying and selling of [5] Cushing, K. “Why projects fail”. Computer Weekly,
deliverables that are hired and used within a specific November 21, 2005, 58. 2002.
time, cannot be touched or felt (intangible), cannot be [6] Cynthia K. West, “Four Common Reasons Why
taken away from the provider, last for a specific time Projects Fail”, 2010.
and cannot be stored like products for later use. These [7] Henry F.L. Chung, “Analysing marketing
deliverables needs good marketing strategies and customization strategies in Australasian firms: a
customer service to reach many customers and for the framework for services and goods exporters”, Asia
provider to keep in trend. Pacific Business Review, Vol. 16, No. 4, October 2010,
Service marketing just like any marketing strategies, 505–525.
it has projects of which they undergoes the project [8] Jeffrey Tarter, “Service Marketing: The
processes such as; the initiating process which the first Relationship Factor”, Produced by the association of
process , followed by planning processes, executing support professionals, 2002.
processes, controlling processes and closing processes [9] Lisa Anderson, “Top three causes of project
to bring the project to an end. In every project there is a failure”, May 2010.
possibility of failures and risks, therefore due to this, [10]. Marc Hirshfield and Peggy Daniels Lee, “Critical
planning is required for a successful result. Project Success Factors for Healthcare Software
planning as the second project process contributes Implementations”, 2009.
highly in projects success and so is risk management
[11] Merrill K.A, “Project Integration Management”,
Project Management Tutorial Series, November 21,
2007.
[12] Nadim F. Matta and Ronald N. Ashkenas, “why
good projects fail anyway?”, 2003.
[13] Ofer Zwikael, Shlomo Globerson, “Benchmarking
of project planning and success in selected industries”,
Benchmarking: An International Journal, Vol. 13 No. 6,
pp. 688-700, 2006.
[14]. Parasuraman A., Zeithaml V.A. and Berry L.L. “A
Conceptual Model of Service Quality and Its
Implications for Future Research”, Journal of
Marketing, 49, 41 – 50, 1985.
[15] PMBOK3, “Project Management Processes 3”,
pp.28, 1996.
[16]) Quinn, J. B., Baruch, J., & Paquette. “Technology
in Services”. Scientific American, Vol. 257, No. 6,
December, pp. 50-58. 1987.
[17] Rebecca Dozier, “Project Methodology: Critical
Element in Project Success”, Pennsylvania: Project
Management Institute, 2004 .
[18] Shai Rozenes, Gad Vitner, and Stuart Spraggett,
“Project Control: Literature Review”, September 2006.
[19] Simon Buehring, “Project Management Success
with the Top 7 Best Practices”, 2008.
[20] Upravljanje projektima, PMBoK “Terminology
Changes FlashCards”, 2004.