Вы находитесь на странице: 1из 20

LOG SHEET OF DIVERSIFIED TRAINING FOR ARCHITECTS LICENSURE EXAMINATION

SUMMARY

FIELD OF PRACTICE MINIMUM


% (MAX) CREDIT HOURS TOTAL NO. OF HOURS
ACCOMPLISHED
balance/excess

ARCHITECTURAL DESIGNING/DRAFTING, STRUCTURAL


CONCEPTUALIZATION, PLANNING & THE LIKE
30% 1152 1245 A 93

PREPARATION OF CONTRACT DOCUMENTS,


SPECIFICATION WRITING, BILL OF MATERIALS, COST
ESTIMATES, GENERAL CONDITIONS, BIDDING
25% 960 1008 B 48
DOCUMENTS, CLERK OF WORKS AND THE LIKE
FIELD SUPERINTEDENCE, PROJECT MANAGEMENT
ADMINISTRATION & THE LIKE
15% 576 592 C 16
TECHNICAL, ECONOMIC AND FINANCIAL FEASIBILITY
STUDIES, PROJECT PROMOTIONAL, PRE-DESIGN & THE
LIKES
10% 384 408 D 24
ARCHITECTURAL LAY-OUTING OF MECHANICAL
ELECTRICAL, ELECTRONIC, SANITARY, PLUMBING,
COMMUNICATIONS AND OTHER UTILITY SYSTEMS,
EQUIPMENT AND FIXTURES ARCH'L LIGTHING,
10% 384 436 E 52
ACOUSTICS ANDINTERIORS/SPACE
ARCHITECTURAL ALLIED FIELD OF PRACTICE
PLANNING,
RESTORATION/PRESERVATION AND OTHER ANCILLARY
SERVICES
10% 384 456 F 72

TOTAL 3840 4145 305

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
1. Rovi Cherish Maruyama Condo Unit Interior Fit out
Unit 723 Camella Northpoint, Bajada, Davao City
A. Clerk of Works 27 5 17 12 8 17 96

TOTAL NO OF HOURS 0 96 0 0 0

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
2. Mary Jane Te Condo Unit Interior Fit-out
Unit 2002-2003 Abreeza Place Tower 1, Bajada, Davao City
A. Clerk of Works 29 5 17 30 6 17 176
B. Assisted on site supervision and inspection 3 7 17 25 8 17 328

TOTAL NO OF HOURS 0 176 328 0 0


TOTAL NO OF HOURS 0 176 328 0 0

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
3. DEE RESIDENCE 2-STOREY RESIDENTIAL BUILDING
Las Terrazas Subdivision, Maa, Davao City
A. Clerk of Works 26 8 17 6 10 17 288

TOTAL NO OF HOURS 0 288 0 0 0

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
4. MEZZANINE PROPOSED 3-STOREY APARTMENT BUILDING
Magallanes St., Poblacion District, Davao City
A. Assisted on pre-design and feasibility studies 7 10 17 14 10 17 56
B. Preparation of architectural drawings and revisions 16 10 17 4 11 17 136
C. Architectural layouting of plumbing systems 6 11 17 7 11 17 16

TOTAL NO OF HOURS 136 0 0 56 16

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
5. ABASOLO CONDO UNIT INTERIOR FIT-OUT
Unit 2807 Abreeza Place Tower 1, Bajada, Davao City
A. Preparation of architectural interior and fitout drawings 8 11 17 11 11 17
B. Assisted in conducting site supervision and site inspection 20 11 17 29 12 17 264

TOTAL NO OF HOURS 0 0 264 0 0

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
7. JABIDO RESIDENCE 2-STOREY RESIDENTIAL BUILDING
Catalunan Pequeño, Davao City
A. Assisted on pre-design and space management studies 3 1 18 6 1 18 32
B. Assisted in preparation of schematic design and rendering 8 1 18 13 1 18 48
C. Consultation meeting with client 15 1 18 15 1 18 8
D. Preparation of architectural drawings and structural conceptuali 7 2 18 19 2 18 88
E. Preparation of architectural interiors and space planning 20 2 18 24 2 18
F. Architectural layouting of plumbing systems 26 2 18 27 2 18 16
G. Assisted in preparation of cost estimates and specification writin 13 3 18 22 3 18 72

TOTAL NO OF HOURS 136 72 0 40 16

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
6. SCOTT RESIDENCE 2-STOREY RESIDENTIAL BUILDING
Lot 1303-C, Area 10, Babak, Island Garden City of Samal
B. Assisted in revision of architectural drawings 16 1 18 23 1 18 64
C. Consultation meeting with client 24 1 18 27 1 18 32
D. Preparation of architectural space planning and interior detailing 29 1 18 2 2 18
E. Architectural layouting of plumbing, electrical and other utility s 3 2 18 6 2 18 32
A. Assisted on pre-design and space management studies 13 11 17 18 11 17 48

TOTAL NO OF HOURS 64 0 0 80 32

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
Project title: Faderan Residence
Location: Buhangin
TOTAL NO OF HOURS 0 0 0 0 0

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
8. AMAR RESIDENCE 3-STOREY WITH ROOF DECK RESIDENTIAL BU
Lamac, Consolacion, Cebu City
A. Assisted on pre-design and space management studies 28 2 18 7 3 18 56
B. Assisted in preparation of schematic design and rendering 8 3 18 12 3 18 36
C. Preparation of architectural drawings and structural conceptualiz 10 5 18 26 5 18 120
D. Preparation of architectural space planning and interior detailing 28 5 18 16 6 18
E. Architectural layouting of electrical, electronic, mechanical, plu 2 7 18 6 7 18 44

TOTAL NO OF HOURS 156 0 0 56 44

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
10. HAWKINS RESIDENCE 2-STOREY RESIDENTIAL BUILDING
Illumina Estates, Communal, Davao Ciy
A. Aided in the preparation of space management studies 28 3 18 31 3 18 32
B. Consultation meeting with client 2 4 18 2 4 18 8
C. Preparation of architectural drawings and revisions 3 4 18 16 4 18 96
D. Architectural layouting of electrical, plumbing and other utility 17 4 18 21 4 18 40

TOTAL NO OF HOURS 96 0 0 40 40
PERIOD COVERED Corresponding Number of hours of Described
PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
13. PROPOSED ONE-STOREY METERING LAB
Surseco-1, San Fernando, Bislig City, Surigao del Sur

A. Preparation of architectural drawings and structural conceptuali 25 6 18 29 6 18 40


B. Preparation of architectural space planning and interior detailing 9 7 18 12 7 18
C. Architectural layouting of electrical, electronic, mechanical, plu 13 7 18 16 7 18 24
d. Assisted in preparation of specification writing 17 7 18 20 7 18 32

TOTAL NO OF HOURS 40 32 0 0 24

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
9. PROPOSED ONE-STOREY VEHICLE SHED
Surseco-1, San Fernando, Bislig City, Surigao del Sur
A. Preparation of architectural drawings and structural conceptuali 23 3 18 26 3 18 24
B. Architectural layouting of plumbing, mechanical and electrical s 27 3 18 27 3 18 8
C. Assisted in preparation of cost estimates and specification writin 16 1 18 23 1 18 56

TOTAL NO OF HOURS 24 56 0 0 8

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
11. PROPOSED ONE-STOREY GM RESIDENCE
Surseco-1, San Fernando, Bislig City, Surigao del Sur
A. Aided in the preparation of space management studies 23 4 18 25 4 18 24
B. Preparation of architectural drawings and revisions 26 4 18 5 5 18 75
C. Architectural layouting of electrical, mechanical and plumbing s 7 5 18 9 5 18 24
D. Assisted in preparation of cost estimates and specification writin 5 1 19 15 1 19 72
TOTAL NO OF HOURS 75 72 0 24 24

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
12. PROPOSED 2-STOREY MAUSOLEUM
Forest Lake, Maa, Davao City
A. Preparation of architectural drawings and structural conceptuali 18 6 18 21 6 18 32
B. Architectural layouting of electrical, mechanical and plumbing s 22 6 18 23 6 18 16

TOTAL NO OF HOURS 32 0 0 0 16

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
14. FLORES RESIDENCE PROPOSED 2-STOREY RESIDENTIAL BUILDI
Brgy. Maquiapo, Guagua, Pampanga, Central Luzon
A. Assisted on pre-design and space management studies 21 7 18 25 7 18 32
B. Assisted in preparation of schematic design and rendering 26 7 18 30 7 18 32
TOTAL NO OF HOURS 32 0 0 32 0

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
15. PROPOSED TWO-STOREY ADMIN BUILDING
Surseco-1, San Fernando, Bislig City, Surigao del Sur
A. Assisted on pre-design and space management studies 31 7 18 6 8 18 48
B. Assisted in preparation of schematic design and rendering 7 8 18 11 8 18 40
C. Preparation of architectural drawings and structural conceptualiz 31 8 18 12 9 18 92
D. Preparation of architectural space planning and interior detailing 30 10 18 8 11 18
E. Architectural layouting of electrical, electronic, mechanical, plu 9 11 18 17 11 18 72
F. Assisted in preparation of bill of materials, cost estimates and spe 19 11 18 8 12 18 144

TOTAL NO OF HOURS 132 144 0 48 72

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
16. VUKELICH RESIDENCE TWO-STOREY RESIDENTIAL BUILDING
Mambago, Island Garden City of Samal

A. Aided in the preparation of space management studies 13 8 18 16 8 18 32


B. Preparation of architectural drawings and structural conceptualiz 17 8 18 28 8 18 80
C. Architectural layouting of plumbing systems 29 8 18 30 8 18 16
TOTAL NO OF HOURS 80 0 0 32 16

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
17. PROPOSED 3-STOREY HRM HOTEL WITH ROOF DECK
JRMSU Main, Guading Adasa St., Sta. Cruz, Dapitan City
A. Assisted in preparation of schematic design and rendering 30 6 18 1 7 18 16
B. Preparation of architectural drawings and structural conceptualiz 13 9 18 29 9 18 130
C. Preparation of architectural space planning and interior detailing 1 10 18 13 10 18
D. Architectural layouting of electrical, electronic, mechanical, plu 14 10 18 23 10 18 80
E. Assisted in preparation of specification writing 24 10 18 29 10 18 40

TOTAL NO OF HOURS 146 40 0 0 80

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
18. PROPOSED 2-STOREY INDUSTRIAL TECHNOLOGY BUILDING
JRMSU Siocon Campus, Siocon, Zamboanga del Norte
A. Preparation of architectural drawings and structural conceptuali 10 12 18 22 12 18 96
B. Architectural layouting of electrical, electronic, mechanical, plu 26 12 18 4 1 19 48
C. Assisted in preparation of specification writing 24 1 19 31 1 19 32
TOTAL NO OF HOURS 96 32 0 0 48

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
19. HERANA INN PROPOSED INTERIOR FIT-OUT
General Santos City
A. Preparation of architectural interiors and detailing 24 1 19 31 1 19

TOTAL NO OF HOURS 0 0 0 0 0

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
Project title:
Location:
TOTAL NO OF HOURS
0 0 0 0 0
PERIOD COVERED Corresponding Number of hours of Described
PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
Project title: ABC Medical Arts building Renovation

TOTAL NO OF HOURS
0 0 0 0 0
Prepared by:

Ar. Jan Philippe N. Cortes


Hope it will help! Cheers and good luck!
ION

balance/excess

93

48

16

24

52

72

305

hours of Described Total No.


OP) of hours CALCULATOR
F
NO. OF DAYS 12
HOURS PER
96 12 DAY 8
TOTAL 96
0 96

hours of Described Total No.


OP) of hours CALCULATOR n
F
NO. OF DAYS 41
HOURS PER
176 22 DAY 8
328 41
TOTAL 328

0 504
0 504

hours of Described Total No.


OP) of hours CALCULATOR
F
NO. OF DAYS 36
HOURS PER
288 36 DAY 8
0
TOTAL 288

0 288

hours of Described Total No.


OP) of hours CALCULATOR
F
NO. OF DAYS 17
HOURS PER
56 7 DAY 8
136 17
16 2
TOTAL 136
0

0 208

hours of Described Total No.


OP) of hours CALCULATOR
F
NO. OF DAYS 33
HOURS PER
32 32 4 DAY 8
264 33
0
TOTAL 264
0

32 296

hours of Described Total No.


OP) of hours CALCULATOR
F
NO. OF DAYS 4
HOURS PER
32 4 DAY 8
48 6
8 1
TOTAL 32
88 11
40 40 5
16 2
72 9
0
0
0
0
0
0
0

40 304

hours of Described Total No.


OP) of hours CALCULATOR
F
NO. OF DAYS 8
HOURS PER
64 7 DAY 8
32 4
40 40 5
TOTAL 64
32 4
48 6
0
0
0
0

40 216

hours of Described Total No.


OP) of hours CALCULATOR
F
NO. OF DAYS 8
HOURS PER
0 DAY 8
0
0
TOTAL 64
0
0
0
0
0
0
0
0
0
0
0

0 0

hours of Described Total No.


OP) of hours CALCULATOR
F
NO. OF DAYS 18
HOURS PER
56 7 DAY 8
36 4
120 15
TOTAL 144
144 144 18
44 5
0
0

144 400

hours of Described Total No.


OP) of hours CALCULATOR
F
NO. OF DAYS 12
HOURS PER
32 4 DAY 8
8 1
96 12
TOTAL 96
40 5
0

0 176
hours of Described Total No.
OP) of hours CALCULATOR
F
NO. OF DAYS 4
HOURS PER
0 DAY 8
40 5
32 32 4
TOTAL 32
24 3
32 4
0
0

32 128

hours of Described Total No.


OP) of hours CALCULATOR
F
NO. OF DAYS 7
HOURS PER
24 3 DAY 8
8 1
56 7
TOTAL 56
0
0
0

0 88

hours of Described Total No.


OP) of hours CALCULATOR
F
NO. OF DAYS 9
HOURS PER
24 3 DAY 8
75 9
24 3
TOTAL 72
72 9
0 195

hours of Described Total No.


OP) of hours CALCULATOR
F
NO. OF DAYS 4
HOURS PER
32 4 DAY 8
16 2
0
TOTAL 32
0

0 48

hours of Described Total No.


OP) of hours CALCULATOR
F
NO. OF DAYS 4
HOURS PER
32 4 DAY 8
32 4
TOTAL 32
0 64

hours of Described Total No.


OP) of hours CALCULATOR
F
NO. OF DAYS 18
HOURS PER
48 6 DAY 8
40 5
92 11
TOTAL 144
64 64 8
72 9
144 18

64 460

hours of Described Total No.


OP) of hours CALCULATOR
F
NO. OF DAYS 10
HOURS PER
DAY 8
32 4
80 10
TOTAL 80
16 2
0
0 128

hours of Described Total No.


OP) of hours CALCULATOR
F
NO. OF DAYS 13
HOURS PER
16 2 DAY 8
130 15
104 104 13
TOTAL 104
80 10
40 5
0

104 370

hours of Described Total No.


OP) of hours CALCULATOR
F
NO. OF DAYS 12
HOURS PER
96 12 DAY 8
48 6
4
TOTAL 96
0 144

hours of Described Total No.


OP) of hours CALCULATOR
F
NO. OF DAYS 4
HOURS PER
0 4 DAY 8
0
0
TOTAL 32
0

0 0

hours of Described Total No.


OP) of hours CALCULATOR
F
NO. OF DAYS 9
HOURS PER
DAY 8
TOTAL 72
0 0

hours of Described Total No.


OP) of hours CALCULATOR
F
NO. OF DAYS 0
HOURS PER
DAY 0
TOTAL 0

0 0

Вам также может понравиться