Вы находитесь на странице: 1из 10

IAS LOOTAH CONTRACTING

GARDENCITY 132/11 KV SUBSTATION PROJECT

BBS - IDT
Structure IDT PART OF STRUCTURE : FULL Total Rebar Quantity : 89.421 MT
Shape dimensions (mm)
Shape
No of Spacing Nos of bars in Total Nos of Dia of Unit code No of Cutting Total Weight
Sl.No Description Membe Length steel weight Length
(mm) each member bars (AS per A B C D E F Lap (kg)
rs/Face (mm) (kg) BS8666) (mm)

0 0.000
WALLS ( FROM-3.940 to +10.500/+12.700) 0.000 0 0.000
1 W4 (IDT1,2,3)-Vertical 6 11800 150 79 474 16 1.580 21 300 14440 800 2 17140 12838.495
2 W4 (IDT1,2,3)-Binder 6 13900 150 93 558 12 0.889 0 11800 1 12400 6150.400
3 U Bar ( dowels & Corner bar) 6 13900 150 93 558 12 0.889 21 1100 220 1100 2420 1200.320
4 W4 (IDT1,2,3)-Vertical 2 3605 150 25 50 16 1.580 21 300 14440 800 2 17140 1354.272
5 W4 (IDT1,2,3)-Binder 2 13900 150 93 186 12 0.889 0 3600 3600 595.200
6 U Bar ( dowels & Corner bar) 1 13900 150 93 93 12 0.889 21 1100 220 1100 2420 200.053
7 Link bar(spacer) 39 13900 450 31 1219 12 0.889 31 100 100 220 150 570 617.796
8 W10-WALL-Vertical 2 28125 150 188 376 16 1.580 21 300 16640 800 3 20140 11966.641
9 W10-WALL-Binder 2 16100 150 108 216 12 0.889 0 28125 4 30525 5860.800
10 U Bar ( Corner bar) 2 16100 150 108 216 12 0.889 21 1100 220 1100 2420 464.640
11 Link bar(spacer) 31 16100 450 36 1125 12 0.889 31 100 100 220 150 570 570.000

CORBAL
10 Corbal main bar 6 11800 150 79 474 16 1.580 C1 1400 775 220 583 300 800 4078 3054.644
11 Binder 6 1385 150 10 60 16 1.580 0 11800 1 12600 1194.667
12 U- bar at End (Both Direction) 3 10 30 16 1.580 21 1100 500 1100 2700 128.000
13 TRB01 (400x900)- Top U bar 2 3 6 20 2.469 21 5200 820 1500 7520 111.407
13 TRB01 (400x900)- Top Main bar 1 3 3 20 2.469 0 24225 3 27225 201.667
14 TRB01(400x900)- Bot Main bar 1 3 3 20 2.469 0 28425 3 31425 232.778
15 TRB01 (400x900)- Side Main bar 2 4 8 12 0.889 0 28425 3 30225 214.933
16 TRB01(400x900)- Ring 1 28425 125 228 228 12 0.889 63 820 320 120 2840 575.573

PARAPET
1 Vertical U Bar 1 48530 150 324 324 12 0.889 21 2300 120 2300 4720 1359.360
2 Binder 2 1500 200 8 16 12 0.889 0 48530 5 51530 732.871
3 Corner- U bar 6 1500 200 8 48 12 0.889 21 1000 200 1000 2200 93.867

PLINTH (8100x2500x3940) TOC:+0.400


1 Vertical (pheriferi) 3 21200 150 142 426 16 1.580 23 800 4340 800 1 6740 4537.268

1 of 10
IAS LOOTAH CONTRACTING
GARDENCITY 132/11 KV SUBSTATION PROJECT

BBS - IDT
Structure IDT PART OF STRUCTURE : FULL Total Rebar Quantity : 89.421 MT
Shape dimensions (mm)
Shape
No of Spacing Nos of bars in Total Nos of Dia of Unit code No of Cutting Total Weight
Sl.No Description Membe Length steel weight Length
(mm) each member bars (AS per A B C D E F Lap (kg)
rs/Face (mm) (kg) BS8666) (mm)

2 Horizantal bar - longer bar 6 3940 150 27 162 16 1.580 21 800 8000 800 9600 2457.600
2 Horizantal bar-shorter bar 6 3940 150 27 162 16 1.580 21 800 2400 800 4000 1024.000
3 Top bar - Longer bar 3 2500 150 17 51 16 1.580 21 800 8000 800 9600 773.689
4 Top bar -shorter bar 3 8100 150 54 162 16 1.580 21 800 2400 800 4000 1024.000
5 Link bar vertical X&Y-direction 12 8000 600 14 168 16 1.580 31 300 100 4240 300 1 5740 1523.864
6 Link bar horizantal x axis-z direction 41 3940 600 7 284 16 1.580 21 300 2400 300 3000 1344.000
7 Link bar horizantal y axis-z direction 12 3940 600 7 84 16 1.580 21 300 8000 300 1 9400 1247.763

Trench Walls
IDT-1
1 IDT 1-W5 (ALL-BF) 6 18160 150 122 732 12 0.889 21 600 4340 200 1 5740 3734.827
2 IDT1-W5 Wall dowels 20 3940 150 27 540 12 0.889 11 600 900 1500 720.000
3 IDT1-W5 Wall Binder -132kv Cable trench 2 3940 150 27 54 12 0.889 0 3650 3650 175.200
4 IDT1-W5 Wall corner U Binder -132kv Cable trench 2 3940 150 27 54 12 0.889 21 600 220 600 1420 68.160
5 IDT1-W5 Wall below slab 2 3940 150 27 54 12 0.889 0 3610 3610 173.280
6 IDT1-W5 Wall at trench location 2 3940 150 27 54 12 0.889 0 3000 3000 144.000
7 IDT1-W5 Wall at manhole -binder- ubar 2 3940 150 27 54 12 0.889 21 1450 220 1450 3120 149.760
IDT-2
1 IDT2-W5 (ALL-BF) 6 15710 150 105 630 12 0.889 21 600 4340 200 1 5740 3214.400
2 IDT2-W5 Wall dowels 16 3940 150 27 432 12 0.889 11 600 900 1500 576.000
3 IDT2-W5 Wall Binder -132kv Cable trench 2 3940 150 27 54 12 0.889 0 3650 3650 175.200
4 IDT2-W5 Wall corner U Binder -132kv Cable trench 2 3940 150 27 54 12 0.889 21 600 220 600 1420 68.160
5 IDT2-W5 Wall below slab 2 3940 150 27 54 12 0.889 0 3610 3610 173.280
6 IDT2-W5 Wall at trench location 2 3940 150 27 54 12 0.889 0 3000 3000 144.000
IDT-3
1 IDT3-W5 (ALL-BF) 6 15710 150 105 630 12 0.889 21 600 4340 200 1 5740 3214.400
2 IDT3-W5 Wall dowels 16 3940 150 27 432 12 0.889 11 600 900 1500 576.000
3 IDT3-W5 Wall Binder -132kv Cable trench 2 3940 150 27 54 12 0.889 0 3650 3650 175.200
4 IDT3-W5 Wall corner U Binder -132kv Cable trench 2 3940 150 27 54 12 0.889 21 600 220 600 1420 68.160
5 IDT3-W5 Wall below slab 2 3940 150 27 54 12 0.889 0 3610 3610 173.280
6 IDT3-W5 Wall at trench location 2 3940 150 27 54 12 0.889 0 3000 3000 144.000

2 of 10
IAS LOOTAH CONTRACTING
GARDENCITY 132/11 KV SUBSTATION PROJECT

BBS - IDT
Structure IDT PART OF STRUCTURE : FULL Total Rebar Quantity : 89.421 MT
Shape dimensions (mm)
Shape
No of Spacing Nos of bars in Total Nos of Dia of Unit code No of Cutting Total Weight
Sl.No Description Membe Length steel weight Length
(mm) each member bars (AS per A B C D E F Lap (kg)
rs/Face (mm) (kg) BS8666) (mm)

Cable Trench
1 Dowels for Trench - on main wall/plinth 6 12090 150 81 486 12 0.889 11 800 1000 1800 777.600
2 U-bar- B1&B2 3 13090 150 88 264 12 0.889 21 1000 200 1000 2200 516.267
3 Distributor Bar 6 1200 150 8 48 12 0.889 0 13090 13090 558.507
4 Vertical Bar - EX/F 3 16090 150 108 324 12 0.889 31 200 100 1250 800 2350 676.800
5 Vertical Bar - Int 3 16090 150 108 324 12 0.889 23 200 1150 800 2150 619.200
3 Distributor Bar 6 1000 150 7 42 12 0.889 0 16090 16090 600.693
2 B1 (400x400) -Beam Main Bar 3 6 18 20 2.469 21 350 2800 350 3500 155.556
2 B1 (400x400) -Ring 3 2800 100 6 18 10 0.617 51 320 320 120 1520 16.889

Suspended Slab
2 CIS-01 Slab - Dowels on Mainwall/ plinth top & Bot 12 2375 150 16 192 10 0.617 11 800 1000 1800 213.333
2 CIS-01 Slab - B1& T1 bar 6 3610 150 25 150 10 0.617 21 800 2375 800 3975 368.056
2 CIS-01 Slab - T1& T2 bar 6 2375 150 16 96 10 0.617 0 3610 3610 213.926
B02- Main bar-Dowels 6 12 72 16 1.580 11 800 1000 1800 204.800
B02- Main bar 6 6 36 16 1.580 0 3610 3610 205.369
B02 (300x500)-Ring 6 3600 150 24 144 10 0.617 51 220 420 120 1520 135.111
HB02- Main bar 9 6 54 16 1.580 0 3400 3400 290.133
HB03- Main bar 6 4 24 16 1.580 0 3400 3400 128.948
Ring- HB02 (300x200) 9 3400 150 23 207 10 0.617 51 220 120 120 920 117.556
Ring- HB02 (220x200) 6 3400 150 23 138 10 0.617 51 140 120 120 760 64.741

DUCTBANK- EXTRA BARS


Ducts passing through EET
1 Stifferner beam (300x500)- Mainbar 9 4 36 20 2.469 0 3475 3475 308.889
2 Stifferner beam (300x500)- Ring 9 3475 150 24 216 12 0.889 51 220 420 120 1520 291.840
3 vertical-Extrabars at Sleeve location 9 20 180 16 1.580 0 1950 1950 554.667
4 Horizantal-Extrabars at Sleeve location 9 8 72 16 1.580 0 7390 7390 840.818
Ducts passing to 11KV from Grid-5
1 Stifferner beam (300x500)- Mainbar 3 4 12 20 2.469 0 4000 4000 118.519
2 Stifferner beam (300x500)- Ring 3 4000 150 27 81 12 0.889 51 220 420 120 1520 109.440
3 vertical-Extrabars at Sleeve location 3 20 60 16 1.580 0 1950 1950 184.889
4 Horizantal-Extrabars at Sleeve location 3 8 24 16 1.580 0 7390 7390 280.273

3 of 10
IAS LOOTAH CONTRACTING
GARDENCITY 132/11 KV SUBSTATION PROJECT

BBS - IDT
Structure IDT PART OF STRUCTURE : FULL Total Rebar Quantity : 89.421 MT
Shape dimensions (mm)
Shape
No of Spacing Nos of bars in Total Nos of Dia of Unit code No of Cutting Total Weight
Sl.No Description Membe Length steel weight Length
(mm) each member bars (AS per A B C D E F Lap (kg)
rs/Face (mm) (kg) BS8666) (mm)

Ducts passing to inside IDT


3 vertical-Extrabars at Sleeve location 6 12 72 16 1.580 0 2000 2000 227.556
4 Horizantal-Extrabars at Sleeve location 6 8 48 16 1.580 0 2000 2000 151.704
4 Corner bars at Sleeve location 6 8 48 16 1.580 0 2000 2000 151.704

DUCTBANK- Encasement
1 U bar 3 5500 150 37 111 16 1.580 21 1500 700 1500 3700 649.007
2 Distributor 3 2100 150 14 42 12 0.889 0 5500 5500 205.333

CORBAL AT BASEMENT
1 U-Bar for Plinth side 3 14500 150 97 291 16 1.580 21 1000 200 1000 2200 1011.674
2 U-Bar for wall side 3 14500 150 97 291 16 1.580 21 800 400 200 1400 643.793
3 Binder Bar 6 4 24 12 0.889 0 14500 14500 309.333

Total Rebar 89420.795

4 of 10
Formula A B C D E F

0 A 1 0 0 0 0 0

11 A+B 1 1 0 0 0 0

15 A+C 1 0 1 0 0 0

21 A+B+C 1 1 1 0 0 0

23 A+B+C 1 1 1 0 0 0

24 A+B+C 1 1 1 0 0 0

26 A+B+C 1 1 1 0 0 0

31 A+B+C+D 1 1 1 1 0 0

34 A+B+C+E 1 1 1 0 1 0

35 A+B+C+E 1 1 1 0 1 0

51 2A+2B+2C 2 2 2 0 0 0

63 2A+3B+2C 2 3 2 0 0 0

98 A+2B+2C 1 2 2 0 0 0
B C
A E
D
C1 F
A+B+C+D+E+F 1 1 1 1 1 1

32 A+B+C+D 1 1 1 1 0 0
BASEMENT COLUMNS & WALLS
Internal Ext wall Total
size upto BASEMENT- GF GF -FF FF-RF Nos
26 31
1 C1 400x600 400x600 400x600 4 4
2 C1A 400x600 400x600 400x600 5 5
3 C1B 400x600 400x600 400x600 1 1
4 C1C 400x600 400x600 400x600 3 3
5 C1D 400x600 400x600 400x600 2 2
6 C1E 400x600 400x600 400x600 4 4
7 C1E' 400x600 400x600 400x600 4 4
8 C1F 400x600 400x600 400x600 2 2
9 C2 600x500 600x500 600x500 5 1 6
10 C2A 600x500 600x500 1 1
11 C2B 690x500 600x500 1 1
12 C3 600x600 600x600 600x600 1 2 3
13 C3A 600x600 600x600 600x600 5 5
14 C3B 600x600 600x600 600x600 1 1
15 C4 500x400 5 5
16 C5 700x600 700x600 700x600 1 1
17 C5A 700x600 700x600 700x600 4 4
18 C6 400x400 400x400 1 1
19 C7 700x450 700x450 700x450 1 1
20 C8 300x400 3 3
21 FC -1 Nos 400x400
Remarks