Вы находитесь на странице: 1из 2

Material Purchase For Pune Site

Description of Goods Rail Type Unit

1 Grinding Stone Nos


2 Closing pins 5% excess of schedule quantity of portions Nos
10 gms for each portion & 10% extra on overall
3 Asbestos powder Kg
quantityVV
4 Chisle 5 Nos Nos
5 Asbestors Gloves 2 Pairs Pair
6 Crucible fork 7 Nos Nos
7 Crucible stand 7 Nos Nos
8 3 Pins lead wire 30 mts Mtr
9 Blue goggles 10 Pairs Pairs
10 Grand Goggle 2Pairs Pairs
11 Stop watch (Steel body) 5 Nos Nos
12 Adjustable spanner 3 No Nos
13 Coal shovel 4 Nos Nos
14 Crusible ring 3 pairs Nos
15 Hot set 8 Nos Nos
16 Plier 4 Nos Nos
17 Rain Guard 12 Nos Nos
18 Steel wire brush 12 Nos Nos
19 Mould pressure (clamp) 1 No Nos
Pyrometer / Thermal chalk for measurement of rail
20 4 No Nos
temp
21 Mirror with handle (150 x 100mm) 7 No Nos
22 Mould cover (plates) 4 No Nos
23 Universial mounting with vapourizer holder One set per 200 portions Nos
24 Crucible charge One for 100 portions (as a apare) Nos
25 Manganse powder 100 gms per portions Kg
26 sodium silicate 10 gms per portions Kg
27 Complete crucible with cap 9 Nos Nos
28 Rail Guard 8 Nos 605
29 Torch holder 4 Nos 605
e
Qty in Extra Total To Be
Status Stock
nos. qty Qty Purchase
61.00 0 61.00 61 Pending OK
605 30 635 635 Pending 0

605 6 6 Pending Ok
605 5 5 5 Done Done
605 2 2 2 Pending OK 1 Nos Pending
605 7 7 7 Pending OK
605 7 7 7 Pending Ok
605 30 30 30 Done Done
605 10 10 10 Done Done
605 2 2 2 Done Done
605 5 5 5 Pending 0
605 3 3 3 Pending Ok
605 4 4 4 Done Done
605 3 3 3 Pending Done
605 8 8 8 Pending 0 4 Nos Send
605 4 4 4 Done Done
605 12 12 12 Pending 0
605 12 12 12 Pending 0 5 Nos Send
605 1 1 1 Pending 0

605 4 4 4 Pending 0
605 7 7 7 Pending 0
605 4 4 4 Pending 2
605 3 3 3 Pending Ok
605 6 6 6 Pending OK
605 60 60 60 Pending Ok
605 6 6 6 Pending Ok
605 9 9 9 Pending OK
8 8 8 8 Pending 2
4 4 4 4 Pending 0 2 Nos Send