ENGINEERING DESIGN BASIS
Rev No. 1
(CIVIL, STRUCTURAL & ARCHITECTURAL)
Page 2 of 53
CONTENTS
Part-A (Civil)
A.1.0 SCOPE…………….................................................................................................................... 5
A.2.0 ABBREVIATIONS, CODES & STANDARDS/ PUBLICATIONS……………………………….5
A.2.1 ABBREVIATIONS .................................................................................................................. 5
A.2.2 CODES & STANDARDS/ PUBLICATIONS .......................................................................... 5
A.3.0 DESIGN DATA ....................................................................................................................... 5
A.3.1 METEOROLOGICAL DESIGN DATA ................................................................................... 5
A.4.0 DESIGN CONSIDERATIONS ............................................................................................. 5
A.4.1 CIVIL DESIGN CONSIDERATION ....................................................................................... 5
A.4.1.1 SITE GRADING ...................................................................................................................... 6
A.4.1.2 ROADS ................................................................................................................................... 7
A.4.1.3 PAVEMENTS .......................................................................................................................... 7
A.4.1.4 SITE FINISH ........................................................................................................................... 7
A.4.1.5 STORM WATER DRAINAGE .................................................................................................. 8
A.4.1.6 OIL CATCHER……………...……………………………………………………………………...….. 8
A.4.1.7 WATER SUPPLY .................................................................................................................... 8
A.4.1.8 UNDERGROUND PIPING ....................................................................................................... 8
A.4.1.9 SEWERS ................................................................................................................................ 9
A.4.1.10 STORAGE TANK SAND PAD FOUNDATION & DYKE WALLS ....................................... 11
A.4.1.11 FENCING/COMPOUND WALL……………………………………………………………………..11
Part-B (Structure)
B.1.0 SCOPE ................................................................................................................................... 13
B.2.0 ABBREVIATIONS, CODES & STANDARDS / PUBLICATIONS ............................................. 13
B.2.1 ABBREVIATIONS .................................................................................................................. 13
B.2.2 CODES & STANDARDS / PUBLICATIONS ............................................................................ 13
B.3.0 GENERAL / DESIGN CONSIDERATIONS.............................................................................. 16
B.3.1 MATERIAL OF CONSTRUCTION........................................................................................... 16
B.3.2 LOADS .................................................................................................................................... 18
B.3.3 FLOORING DETAILS FOR BUILDINGS & SHEDS ................................................................ 21
B.4.0 SPECIFIC DESIGN CONSIDERATIONS ................................................................................ 22
B.4.1 FOUNDATION DESIGN .......................................................................................................... 22
B.4.2 RCC STRUCTURES & FOUNDATIONS ................................................................................. 25
B.4.3 STEEL STRUCTURES ........................................................................................................... 28
B.4.4 MASONRY WORKS ............................................................................................................... 30
B.4.5 SPECIFIC APPLICATIONS..................................................................................................... 31
Part-C (Architecture)
PART 1 ARCHITECTURAL DESIGN BASIS (STANDARD)
No. DESCRIPTION
C.1.0 SCOPE……………………………………………………………………………………………………………………………..33
C.1.1 REFERENCED PUBLICATIONS…………………………………………………………………………………………..33
C.2.0 STANDARD SPECIFICATIONS CODES & PRACTICES…………………………………………………………..33
C.3.0 GENERAL / DESIGN CONSIDERATIONS…………………………………………………………………………….33
C.3.1 ARCHITECTURE DESIGN…………………………………………………………………………………………………..33
C.3.2 BUILDING REQUIRMENT………………………………………………………………………………………………….33
C.3.3 BUILDING SERVICES…………………………………………………………………………………………………………36
C.3.4 AESTHETICS……………………………………………………………………………………………………………………..36
C.3.5 STRUCTURAL & CONSTRUCTION ELEMENTS……………………………………………………………………37
C.3.6 BUILDING ELEMENTS………………………………………………………………………………………………………37
Template No. 5-0000-0001-T2 Rev. 1 Copyrights EIL – All rights reserved
PART-A
(CIVIL)
A.1.0 SCOPE
This document covers engineering design basis for Civil works such as compound wall, fencing, site
grading, roads, pavements, storm water drainage, water supply, waste collection & disposal system,
tank farm dyke, tank foundations, etc.
Order of Precedence:
i) Statutory Provisions
ii) P&IDs
iii) Engineering Design Basis
iv) IS Codes/ IRC Codes
A.2.1 ABBREVIATIONS
Code Description
CBR California Bearing Ration
CRWS Contaminated Rain Water Sewer
FGL Finished Ground Level
HFL High Flood Level
HPP Highest Pavement Point
IRC Indian Road Congress
MSA Million Standard Axle
MSL Mean Sea Level
OWS Oily Waste Sewer
PCC Plain Cement Concrete
RCC Reinforced Cement Concrete
WMM Water Mix Macadam
WBM Water Bound Macadam
EWS Environment, Water & Safety
A.4.1.1.1 All the tree roots and vegetation shall be grubbed up and removed from site.
A.4.1.1.2 The grading of the area shall be done by cutting and filling with the following:
A.4.1.1.4 Plant FGL : Min. 0.6 m above Design High Flood Level of
the area or based on drainage outfall level
A.4.1.2 ROADS
ii) Road around unit 12.5 m/ 10.5 m/ 9.0 m 10.5m/ 8.5m/ 7.0m
and its primary
accesses
iii) Roads for high lift crane -------- As Per Requirement ------------
A.4.1.2.3 Radius of curve 12 m for 7.5m, 9.0m, 12.5m, 16.0 m & 19.0m &
8.0 m for 6.0m wide road
(15/20 m for four lane & high lift crane roads)
b) Compacted area
such as tank farm/
offsite areas - 0.7
A.4.1.5.2 Ditches
b) Construction
A.4.1.6 An oil catcher shall be provided on storm water ditch before it leaves the battery limit of the plant.
A.4.1.7.1.1 Storage
a. Type of reservoir Existing
b. Capacity Existing
A.4.1.7.1.2Treatment Existing
A.4.1.8.1 UG Fire water Piping shall be minimized and provided only where essential.
All underground CS pipes shall be provided with corrosion resistance protection.
A.4.1.9 SEWERS
A.4.1.9.1General
S. No. Philosophy
1 Storm water drains shall not be combined with oily water drains. However within the paved
area of the unit where rain water is likely to get contaminated with oil, the same shall be
discharged in the CRWS.
2 OWS/ CRWS from within process unit and tank farm area shall be collected in pits/sumps
and subsequently pumped to EFFLUENT TREATMENT PLANT (ETP).
3 Process Unit Area: It is expected that floor wash of identified equipment area of process
units shall have accidental oil contamination. The floor wash of contaminated area shall
be collected in a CRWS pit through a network of catch basin and pipes and shall be sent
to ETP by pumping. Baffle wall shall be provided both for incoming pipe & outgoing
discharge to storm water drain. After 15 minutes, it shall be routed to storm water open
drain. Rotary Lobe pumps with floating suction shall be provided in CRWS Sump to ensure
earliest removal of Floating oil.
RCC drain with HDG (Hot Dipped Galvanized) grating shall be provided all around the unit
pavement to collect non-contaminated water. This drain shall be connected to main plant
drain.
4 Tank farm Area drainage shall be provided in such a way that the storm water discharge
shall be either sent to storm water open ditch or to the oily waste sewer (OWS) by
providing triple valve pit outside the dyke wall depending on its contamination. The
contaminated rain water discharge from tank farm shall be a released through gravity
sewer at controlled rate to OWS by operating the valve system.
5 All underground C.S. pipes shall be provided with corrosion resistance protection for
service temperature upto 60oC as per specification.
6 Corrosion resistant protection given to underground CS pipe shall extend up to min. 500
mm. above/ beyond grade.
7 Transformer oil shall be drained to RCC pit as per electrical Design Basis/ requirement.
8 All CBD lines with service temperature more than 60oC shall be provided with painting as
per specification for Shop & Field painting.
2 Sanitary Sewer
2.1 Toilet block upto Inspection chamber CI pipes
2.2 Gravity main & lateral RCC class PI pipes
2.3 Pressure main CI pipes
PART-B
(STRUCTURAL)
B.1.0 SCOPE
This document specifies the design criteria and loads that shall be taken into account for the civil-
structural design of all industrial plant and non-plant structures and buildings pertaining to the
project.
B.2.1 ABBREVIATIONS
Code Description
DBE Design basis earthquake
EDB Engineering design basis
FBEC Fusion bonded epoxy coating
FFL Finished floor level
FGL Finished grade level
FOS Factor of safety
HPP High point of pavement
MCE Maximum considered earthquake
MOC Material of construction
NA Not applicable
PCC Plain cement concrete
POSD Plant Operations & Safety Department
RCC Reinforced cement concrete
SBC Safe bearing capacity
TMT Thermo-mechanically treated
UOM Unit of measurement
Note: The above list is suggestive and not exhaustive. Apart from these basic codes any other
related code shall also be followed wherever required. All codes & standards shall be latest
revision with all amendments issued there to.
Notes:
a) Blind floor below air cooler shall be in RCC over metal decking (left-in/ sacrificial
shuttering)
b) Roofing & side cladding shall be as per Part- C (Architecture) Design Basis.
c) Buildings shall have RCC floors & masonry infill walls, however blast-resistant buildings shall
have RCC walls. Material of construction of masonry shall be as per Part- C
(Architecture) Design Basis.
d) Material of construction for buildings shall be as per Part –C (Architecture) Design Basis.
e) Electro-forged galvanized grating shall be used for flooring at all operating floors, unless
RCC floor is required from operations considerations (e.g. blind floor below air coolers
supported on technological structure & pipe rack, plant & non-plant buildings), however
chequered plate shall be provided for walkway along crane girders.
i) Concrete for structures, supporting transfer line & two phase flow line above 6" diameter.
ii) Vermiculite for all other structures, however fire-proofing upto minimum 1.8 m from HPP shall
be in concrete.
B.3.2 LOADS
The weight of all permanent construction, including foundation, walls, floors, roofs, partitions, fire-
proofing, stairways and fixed service and other equipments including all fixtures, platforms, ladders
and attached piping but excluding their content. If piping weight is not indicated separately or
included in the weight of the equipment, the same shall be taken as 10% of the operating weight
of the equipment. Component of soil backfill weight over foundation slab shall be considered as
foundation dead load.
The dead load of panels in sub-station & control room shall be considered as 7.0 kN/Sq.m. The
dead load of false ceiling & false flooring shall be considered as 0.75 kN/Sq.m. wherever
applicable.
The unit weight of materials in general, should be in accordance with IS:875 Part-1.
Live loads shall, in general, be as per IS:875 Part-2. However, the following minimum live loads
shall be considered in the design of structures to account for maintenance and erection as well:
Note:
a) Live load on various types of roofs shall be as per requirements given in IS:875 Part- 2.
All equipment foundations & supporting structures shall be designed for Hydro-test loads. Hydro-
test shall be considered for one equipment at a time. Further, under hydro-test condition the wind
force shall be taken as 25% of normal wind loading. Seismic forces shall not be considered while
hydro-testing.
Operating loads shall include the maximum designed equipment inventory in the operating
cycle of the plant. For silos, the contents shall be considered as operating loads.
a. Actual load as given by piping department, for structures other than pipe racks.
Structures subjected to impact or vibratory loads shall be designed as per the provisions of
IS:875 Part-5 & IS:2974.
These are temporary loads (i.e. monorail, etc.) and are not to be combined with wind loads/
Seismic loads.
Wind loads shall generally be as per IS:875 Part-3 except for switch yard structures &
transmission towers for which IS:802 shall be applicable.
Note: To account for surface area of piping, platforms and other attachments fixed to the
equipment the surface area of the equipment (vessel/ column) exposed to wind shall be increased
by 20% or as specified in the mechanical data sheet of the equipment.
Seismic forces shall be based on IS: 1893 (Part- 1 & 4) and Project specific
recommendations & Response Spectra (Document No. B015-000-16-54-DB-0001), whichever is
more stringent.
Note:
a) Flooring details as given above shall be adopted for the non-suspended ground floor slabs
for buildings & sheds only as categorized for various flooring types.
b) Flooring Type I shall be considered for Control Rooms, Satellite Rack Rooms, Sub
Stations, Pump Houses, Utility Compressor Houses, Parking Areas, Stores, Porches.
c) Flooring Type II shall be considered for Ware Houses, Workshops, Cement Godowns, Fire
Stations, Process Compressor Houses.
d) Flooring Type III shall be considered for Administration, Laboratory, Canteen, Time Office, Gate
House, Training Centre, Guest House, Residential buildings.
e) Floor finish for all the above three types of flooring shall be as per Engineering Design
Basis- Part-C (Architecture).
h) Outdoor pavements shall be as per Engineering Design Basis – Part-A (Civil). However 20 mm
gap to be provided between floor slab and equipment foundation/ column and shall be sealed
using joint sealing compound.
8.1 Under blast (due to hydrocarbon explosion) load combinations the SBC of soil shall not
exceed 2.0 times allowable static bearing pressure of soil.
8.2 Under blast(due to hydrocarbon explosion)load combinations Pile capacity shall not
exceed 2.0 times the permissible capacity under compression, tension and shear modes.
9.0 Foundation for vibrating equipment shall be kept independent of building floors/
foundations and other adjacent foundations.
10.0 Foundation for tanks upto 10m diameter shall be of RCC ring wall type, unless
required from anchorage or counterweight considerations.
S.No. Type of FOS FOS FOS FOS FOS SL- FOS SL-
Structure OT-W/S OT-N- OT-W/S OT-N- W/S (v) N-W/S
(EL) (i) W/S (OL) (iii) W/S (vi)
(EL) (ii) (OL) (iv)
1.0 All Structures, 1.5 1.5 1.5 2.0 1.5 1.5
Equipments in
Units & Offsite
2.0 Overhead tank 1.5 - 2.0 - 1.5 -
3.0 Flood Light Mast 1.5 - 1.5 - 1.5 -
4.0 Retaining Wall - - 1.5 2.0 1.5 1.5
5.0 Flare supporting 1.5 - 1.5 - 1.5 -
structure
6.0 Blast-resistant - - 1.5 2.0 or 1.5 1.5 or
structure 1.2* 1.2*
7.0 Transmission 1.5 2.0 1.5 2.0 1.5 1.75
Tower/ Switch
Yard Structure
Legend:
(i) OT-W/S (EL) - FOS against Overturning with Wind/ Seismic in Erection condition.
(ii) OT-N-W/S (EL) - FOS against Overturning without Wind/ Seismic in Erection condition.
(iii) OT-W/S (OL) - FOS against Overturning with Wind/ Seismic in Operating condition.
(iv) OT-N-W/S (OL) - FOS against Overturning without Wind/ Seismic in Operating condition.
(v) SL-W/S - FOS against Sliding with Wind/ Seismic.
(vi) SL-N-W/S - FOS against Sliding without Wind/ Seismic.
Note:
a) * with blast pressure.
b) Minimum factor of safety against uplift shall be 1.2 for all structures (in case of sumps,
lining weight shall not be included)
No anti termite treatment shall be provided inside the unit areas except buildings. All offsite and utility
plant / non plant buildings shall be provided with anti-termite treatment as per IS:6313 and IS:8944.
1.3 Clear distance from the edge of the sleeve or anchor plate to the edge of pedestal shall
be 100 mm
2.0 The tension capacities of anchor bolts shall be worked out based on the bolt to bolt spacing
and the distance between anchor bolt to the edge of concrete. If required, additional
reinforcement around anchor bolts shall be provided in the concrete
pedestal.
B.4.2.2 CONCRETE
Clear cover shall be considered over links/ stirrups/ ties. Unless otherwise specified in Geotechnical
Recommendations, minimum clear cover to RCC elements shall be provided as follows:
2.0 All Structural Steel elements continuously exposed to temperatures above 215 DEG
C shall be designed for reduced stress as per Clause 16.4 (Fig 24) of IS:800.
3.0 Crane gantry girders shall generally be of welded construction and of single span lengths.
Chequered plate shall be used for gantry girder walkway flooring.
4.0 Steel staircases for main approaches to operating platforms shall have channels provided
as stringers with minimum clear width of 750 mm and slope of approximately 41
degree. The vertical height between successive landings shall not be less than 2.6 m nor
exceed 4.0 m. Treads shall be minimum 230 mm wide made of electro-forged galvanized
grating (with suitable nosing) spaced equally so as to restrict the rise to maximum 200 mm.
However for non-important structures like crossovers etc. the minimum width of stair shall be
750 mm.
5.0 Hand rails 1000 mm high (from top of grating/ top of chequered plate/ FFL), shall be provided
to all walkways, platforms, staircases. Toe plate (100 mm x 5 mm) shall be provided for all
horizontal hand railing (except for hand railing in inclined portion of staircases & platforms
around circular vessels). Spacing of vertical posts shall be 1,500 mm (maximum). Two
types of hand railing shall be provided as follows:
5.1 For technological structures, walkways, platforms (except platform around/ on
circular/ horizontal vessels), staircases: Top rail, mid-rail and vertical post shall be NB 32
mm diameter medium grade MS tubes.
5.2 For platforms around circular vessels: Top rail shall be NB 32 mm diameter medium grade
MS tubes, mid rail shall be 50x6 MS flat and vertical post shall be of angle section L50x50x6.
6.0 Electro-forged hot-dipped galvanized MS Gratings shall be as per EIL Standard No.
7-68-0697.
7.0 Welded connections shall be adopted during shop fabrication, except where only bolted
connections are required (viz. removable members, galvanized electrical
switchyard structures and transmission towers). Field/ site connections shall be bolted.
8.0 Structural connections shall have minimum two bolts of 16 mm diameter, unless otherwise
limited by the size of members.
9.0 Minimum two nuts shall be used for all anchor bolts except for crossovers, platforms on
grade & T- supports.
The limiting permissible vertical deflection for structural steel members such as gantry
girder for electric overhead crane, manually operated crane, purlin supporting any type of
roofing material under dead + live load or dead + wind load conditions shall be as
specified in IS: 800, however for girder/ beam for supporting dynamic equipment/ hoist,
the same shall be Span/450.
Note: Limiting permissible vertical deflection for grating/chequered plate shall be Span/200
or 6mm whichever is minimum.
The limiting permissible horizontal deflection for structural steel members shall be
as specified below, where 'H' represents the height:
The minimum thickness of various structural components (hot rolled sections) shall be
as given:
a) For transmission towers & switchyard structures the minimum thickness of various structural
components shall be as per IS: 802.
b) The minimum thickness for rolled beams and channels shall be mean flange thickness
regardless of the web thickness.
b) The minimum thickness of structural components (except gratings & chequered plates)
which are directly exposed to weather and inaccessible for repainting shall be 8 mm.
d) The minimum thickness of tubes shall be as specified in IS:806.
e) Structural members exposed to marked corrosive action shall be increased in thickness
or otherwise suitably protected against corrosion.
f) The minimum thickness of structural components (except gratings) which are directly
exposed to weather and inaccessible for repainting shall be 8mm. Chequered plates shall
be avoided on structures exposed to atmosphere.
B.4.3.6 ELECTRICAL SWITCHYARD STRUCTURE & TRANSMISSION TOWER (NOT APPLICABLE)
Protective Coating (including surface preparation, shop primer, field primer & finish coat) to
Concrete, Structural Steel, Ladders, Spiral Stairways & Hand Rails shall be as per the
specification for Surface Preparation and Protective Coating , Doc No. : B016-000-79-41-PLS-
01.
The external treatment for protection of concrete foundation shall be done by painting the
sides and bottom (on lean concrete) of the foundations with 2 coats of coal tar epoxy of each
100 microns.
B.4.4.1 GENERAL
All masonry work shall be constructed in cement sand mortar 1:4 for load bearing walls and
1:6 cement sand mortar for non-load bearing walls except half brick partition walls which
shall be constructed in 1:4 cement sand mortar with two numbers of 6 mm diameter MS bars
provided at every fourth course properly anchored with cross walls or pillars.
RCC and Steel chimneys shall be designed as per the requirements of EIL Standard
Specification No. 6-68-0053, IS:4998 and IS:6533.
Machine foundations shall satisfy the requirements of IS:2974 and any other parameter
as specified by the machine manufacturer.
B.4.5.4 BARRICADING
Foundation and super structure shall be designed as per Safety/ Client requirements of
location & height, keeping in view the mean probable design life of structure.
Storage tanks shall be supported either on open ring wall type foundations or sand pads
or pile foundation in accordance with the Geotech recommendations.
PART-C
(ARCHITECTURAL)
C.1.0 SCOPE
This document shall establish the minimum criterion to be followed for the design of various Plant,
Non-Plant Buildings & Sheds. Architectural design shall be in accordance with the following codes
and industry standards.
Note: All codes & standards shall be latest revision with all amendments issued there to. However,
effort shall be made for effective utilization of space and facilities for cost effective design.
EIL Engineering design incorporates Codes and Standards as referred in the design philosophy of
respective engineering disciplines as well as applicable EIL standards and specifications.
Architectural design of the buildings shall be in accordance with this Design Basis and references as
stated above to meet the functional requirements.
Spatial requirements of the buildings shall mainly be decided based on the activities to be performed
in the building, equipment/panel layout and consequent occupancy pattern, clearances, maintenance
and safety requirements. The objective of spatial arrangement shall be to satisfy functional
requirements, physical comfort, and safety regulations as well as aesthetics. Requirement of
services/utilities such as air conditioning, LAN etc. shall be finalized as per Owner’s specific
requirement.
Spatial requirements inside a building shall be decided based on activities to be classified as follows,
which shall be provided in all the buildings/sheds.
Functional areas of any building/shed are constituted by the main activity areas for which the building
is to exist. Various spaces/rooms shall be judiciously sized and shall be integrated logically to
generate the total building plan taking into account the following parameters.
The objective of spatial arrangement shall be to satisfy functional requirements and physical comfort
and safety regulations as well as aesthetics which has significant role in creating a favorable working
and living condition.
Following spaces are classified as circulation spaces. These spaces shall be provided for integrating
various types of spaces and as means of access/exit.
x Corridors & passages.
x Staircases.
x Elevators.
x Entrance lobby/ Foyer including Reception & waiting.
x Gangway/walkways.
x Equipment loading/unloading platforms.
x Emergency Exits.
x Ramps for physically challenged and equipment entry/exit as applicable.
The requirements of Utility spaces are generated due to provision of services like Air-conditioning,
pressurization, firefighting, electrical, telephone etc. Following are the examples. These spaces shall
be provided as per specified building services.
x Air-conditioning plant room
x Air handling rooms
x Pressurization blower plant room
x Electrical distribution panel rooms
x Service Ducts
x Fire Fighting Equipment room
x Telephone Exchange Equipments room
x UPS room
x Battery room
However following are the limiting sizes/ dimensions for various purposes, which are to be adhered
to.
x Minimum size of any habitable room 9 sqm with minimum
dimension not less than 3.0m.
C.3.2.2 LIGHTING
Established level of illumination shall be maintained for all parts of the buildings by means of
windows, ventilators etc. Provision of referenced publications like NBC part-VIII; Section-1; IS-2440-
1975; IS-3646 (part II-1996); IS-7662 (part I-1974), Factory rule or other relevant rules etc. shall be
adhered to in this regard. Openings shall be provided with shading devices to avoid glare. For the
purpose of illumination, day lighting shall also be supplemented by artificial illumination particularly
at fire-exit.
C.3.2.3 VENTILATION
C.3.2.4 ACOUSTICS
Specified acceptable noise level and reverberation time shall be maintained inside a building/shed.
Following references shall be referred to for the purpose.
x National Building Code of India
x State Factory Act
Safety from fire and like emergencies shall be taken into account in building design as per NBC-Part
IV; State Factory Rules and other relevant code/ rules. The buildings shall be provided with exits
sufficient to permit safe escape of occupants in case of emergency. The exits shall be in terms of
doorway, corridors, etc. to internal/ external staircase or to areas having access to the outside.
Site planning of building shall take into account aspects like inter-relationship of the buildings with
the whole system, movement pattern, traffic and road net-work, safety regulations, service network,
fire safety, climatic and environmental aspects, site conditions like site dimension, contour, drainage,
noise level, view, future expansion, visual aspects, Natural Light and Ventilation etc.
Climatic factors like wind direction, solar geometry shall be taken into account in orienting the building
depending on type of climate. Orientation of Building shall also consider noise and smell propagation,
views and visual effect from various directions.
Sufficient open space shall be provided for planned expansion of buildings. Sufficient open space
shall also be provided around the buildings for lighting and ventilation in accordance with Factory
Acts & National Building Code.
Suitable Landscaping treatment shall also be done around the important buildings. Such treatment
shall generally consist of lawns, road side plantation and beautification of building entrance areas.
Standard landscape elements such as earth contours, pavings, flower beds, hedges, shrubs, ground
cover and ornamental trees shall be incorporated in landscape treatment. Necessary water
supply/sprinklers shall also be provided.
This service is essential for all human occupied buildings. The building shall have toilet and drinking
water facility and accordingly water supply, distribution and drainage, sanitary services as per NBC-
Part-IX: Section 1&2, Factory rules and or referenced publication. Drinking water provisions shall be
provided within an enclosure separated from the toilets. Space for janitor shall be provided in the
toilets. All service pipes showing on the external wall shall be suitably concealed or shall be provided
within a shaft.
This service shall be provided as essential service for all the buildings. Electrical services for building
shall consist of electrical supply, and distributions, electrical lighting installations, telephone network,
fans, exhaust fans, lighting protection system etc., all accessories, cabling etc. including Emergency
power supply, all as defined under Engg. Design Basis of Electrical.
Control Room Building, Satellite Rack Rooms, Sub-stations etc. shall be centrally air-conditioned.
Accordingly A.C. Plant/ AHU etc. of the require capacity (depending on the requirement) shall be
provided and suitably housed. Some designated rooms (as per Electrical requirement) in the Sub
Station Buildings or in other buildings like canteen; scale room etc. may be required to be air-
conditioned. For this suitable window/ split/ package type units may be provided as per requirement
w.r.t the Design Basis of Packaged Equipment.
C.3.4 AESTHETICS
Apart from the fulfillment of functional & safety requirement, aesthetic requirement of the building
shall be taken care of in the design. Preliminary drawings indicating Architectural scheme shall be
submitted for Owner’s approval.
Architectural scheme shall be based on general principles of Aesthetics. Building facades shall reflect
such principles like symmetry, balance, proportion, rhythm, light and shade etc.
Building Elements like canopies, overhangs & shading devices, gutters, roof projections, parapets,
door; window/ ventilator composition, External wall/ facade shall be considered as contributory
elements to aesthetics. Local Climatic conditions shall be considered while designing the buildings.
Architectural scheme including design of above mentioned elements shall be subjected to Owner/
PMC approval.
The building shall be provided with minimum 1000 mm wide (100mm high from top of Approach Road
Level) plinth protection with building drain around the building.
In general, FFL of the Building shall be determined with respect to top of approach road or pavement.
Following schedule shall be adhered to for FFL of the building:
x Control Room Building/ Satellite Rack Room Building(Building having false flooring):
Top Road level of Approach road + 150 mm + Height of false flooring
x Sub Station Buildings:
(i) Top of approach Road level + 300 mm (Cable Cellar floor)
(ii) Top of approach Road level +150 mm (Transformer bays) with pebbles.
(iii) In case, there is no cellar, the FFL shall be F.G.L. + 150mm + depth of the trench as
per electrical requirement.
x Other Buildings/ Sheds:
Top of approach Road level +300 mm to 450 mm and or as per functional requirement.
x Plant Buildings (Unit area) floors (HPP) shall be maintained as per Design Basis of General
Civil.
x FFL of Loading/ Unloading bays of Warehouses, Godowns, stores shall be maintained as
loading platform level of trucks with outward slope to avoid ingress of rain water splash.
Notes:
x In case of approaches with different top levels, the highest top level of approach road/
pavement shall be considered.
x FFL of toilet, pantry, and kitchen shall be 10-15 mm lower than that of the building FFL to
check ingress/spillage of water.
x FFL of Warehouses, Stores may be kept same as loading/unloading bays/ platforms where
Forklifts etc. are used for internal movement of items.
Steps/ ramps shall be provided for access to the Building for pedestrian/ vehicular, equipment entry
as per relevant code. Minimum 1000 mm wide platform shall be provided in between entrance door
and steps/ramps. This extended platform and floor near the entrance shall have outward slope to
avoid ingress of rain water splash. Following dimensions of the steps/ ramps shall be adhered to.
x Stairs width 1500mm minimum
1200mm minimum (for one side open staircase)
x Tread 300 mm minimum
x Riser 150 mm maximum
x Slope of Ramp Not steeper than 1:6 or as per requirement
x Ratio of Tread & Riser 2 Riser + Tread= 600mm
x Maximum no. of risers per flight 15 Nos.
x Landing width 1500 mm minimum
x Width of step/ ramp 1500 mm minimum
Ramp access for physically challenged shall be provided for important buildings such as admin,
Canteen, control room etc. or else specified. Design of ramps shall be as following:
C.3.6.5 Doors
Doors shall be provided for access, security and safety at all entry & exits of rooms, functional areas
& the buildings. Air tight door shall be provided in pressurized area and in gaseous protection area.
Fire check doors shall be with minimum two hours rating as per statuary requirement. Sizes of the
doors shall be determined on the basis of the following schedule:
Notes:
x Rolling shutters shall be provided for equipment entry for Switchgear Room/ Electrical Room,
A.C. Plant Room etc. and wherever area requirement of openable shutters exceed 2500mm
(width) x 2700 mm (height).
x Motor operated Rolling Shutters shall be provided in the main equipment entry door and for
opening sizes exceeding 9 sqm.
x * Not applicable in case of the door where the maximum certified size of fire door shall be
provided.
x Blast resistant Control room entry door shall be provided with blast Resistant baffle wall in
front of entry door and shall have 45 degree/ 90 degree overlap on both sides. Refer OISD-
STD 163.
Windows/ ventilators shall be provided in all areas of building, shed for natural lighting, ventilation
and visibility at working level in accordance with following Principle:
Note: Transparent roof light sheeting shall be provided in roofing of shed type structures for day
lighting.
In case of Sheds, water tight & leak proof ventilators/ extractors shall be provided over roof to ensure
required air changes as well as for hot air outlet in accordance with following philosophy.
Canopy/overhangs shall be provided at all entries & exits for rain & sun protection. Size of the canopy/
porch shall be decided w.r.t utility of the building and other aesthetic. Blast proof Control Rooms shall
not have any projections with outer face of its walls except with false treatment for aesthetics of the
building.
x For all office type buildings including Laboratories, Amenity buildings such as Canteen,
Medical/First Aid center Control Rooms, Composite buildings/sheds accommodating offices,
canopy shall be provided at all entrances. Canopy or overhangs shall also be provided for
stores, warehouses and storage sheds where regular vehicular movement &
loading/unloading takes place. Size of the canopy shall be decided based on vehicle parking
& covered access to the building/shed, movement around the vehicle and aesthetics of the
building/shed.
x Overhangs shall be provided over all exits. Size of the overhang shall be decided based on
the aesthetics of the building/shed subjected to minimum of 1000 mm. Waterproofing &
drainage provision shall be provided for the canopies & overhangs.
Shading devices shall be provided over all windows, openable ventilators for rain & sun protection.
These devices shall be in form of horizontal projections, vertical projected fins or combination of both
as per building facade treatment. Minimum projection shall be 600 mm. The top surface of the
shading devices shall be finished with cement plaster mixed with waterproofing (laid to slope)
compound and shall be provided with GI spouts for drainage.
C.3.6.10 Parapet
Parapets shall be of RCC for all buildings with minimum 600 mm high for non-approachable roof and
1000 mm high for approachable roof.
Gutter with rain water pipes or R.C.C. shafts shall be provided for all the building for roof water
drainage. Sizing of the gutter shall be based on area to be drained and number of outlets. Gutters
shall be of RCC. For Workshop/ Warehouse or shed with pre coated roof sheeting, pre coated sheets
gutter shall be provided and for big size of workshops/warehouse RCC shaft shall be provided at the
end of gutter.
Rain water pipes shall be provided for roof water drainage. Number of rain water pipes shall be
decided on the basis of roof area, slope and rainfall intensity as per NBC Part IX Section 2. Rain
water pipes shall be embedded in concrete. RCC or GI spouts may be used for drainage of chajja/
small canopies of ground floor.
Entrance lobby shall be provided as a common entrance for all Buildings/sheds accommodating
separate or similar functional spaces integrated together. Individual entries to such functional spaces
shall be from this lobby by means of passages/corridors. Apart from common entry lobby area,
separate independent entries to these functional spaces shall also be provided if functionally
required. Size of the entrance lobby shall be decided on the basis of volume of the movement
subjected to the minimum requirement of 9 sqm.
C.3.6.14 Passages/Corridors
Passages/corridors shall be provided to integrate various spaces. Width of the passages/ corridors
shall be as per following schedule.
Note: Whenever passages/ corridors are to be used for equipment/ machinery/ panels etc. the width
shall be determined on the basis of equipment/ machinery /panel sizes.
Separate service entry shall be provided for service areas such as Kitchen, Air-condition/
Pressurization plant, Electrical Rooms Battery & UPS Room etc. A common service entry may be
provided depending on spatial arrangement
This shall be provided for all entries with centrally air-conditioned spaces as per requirement.
Emergency exits shall be provided for the building as per State Factory Rules, NBC-Part IV and for
individual functional spaces such as Console area, Electrical room etc. Emergency exits shall be
located in such a manner that escape route is direct, unobstructed & without passing through any
other functional areas to safe area. Corridors/staircases shall be provided as escape route to the
emergency exits.
C.3.6.18 Staircases
Staircases shall be provided for vertical circulation & emergency exits. Number of staircases shall be
based on building sizes and buildings with area more than 500 sq.m ground covered area shall have
two stairs (NBC-Part IV). Emergency exit requirements shall be as per safety distance requirement.
At least one no. staircase/ cage ladder shall be provided for access to the flat roof top for
maintenance.
C.3.6.19 Railings
Railings of 1000 mm high shall be provided in stairs and in all unprotected openings in slabs as a
safety device. Stainless Steel railings in loading/ unloading bay of shall be of removable type.
C.3.6.20 Toilet
Toilet shall consist of Gents Toilet, Ladies Toilet (as per Client’s requirement) and separate drinking
water enclosure. Requirement of fittings & fixtures shall be as per National Building Code of India &
Factory Act.Toilet shall be provided in all buildings /sheds having human occupancy in accordance
with following principle.
Note: Drinking water enclosure (as required) shall be provided in all buildings /sheds having human
occupancy. Drinking water facility may be provided in Pantry also.
C.3.6.22 Partitions
Partitions shall be provided for flexible space arrangement in Office spaces if specified, Control
Room etc. The partitions shall be of removable type. Glazed panels shall be provided for visibility
in the partitions as per requirement.
False ceilings shall be provided in the all air-conditioned areas for the purpose of reducing room
volume and to hide air conditioned ducting etc. and also to maintain acoustic level inside any space.
False/ cavity flooring shall be provided to accommodate under floor cabling in Instrumentation areas
like Rack Room, UPS Room etc. Extent of false/ cavity flooring shall be as per Instrumentation
requirements.
Steel gate of suitable size in front of transformer bays in substations building may be provided as per
electrical requirement.
C.4.0 GENERAL
Various alternative Architectural Finishes indicated here are as per general practice of EIL. EIL
recommendation for the finishes in the subject project is highlighted in bold letters. Owner may accept
EIL recommendation or choose amongst these alternatives or indicate other finishes of their choice
for incorporation in design & drawings. Architectural finishes for the project shall be as per information
etc. furnished by the Owner on the body of the questionnaire.
Colour Scheme for all Architectural items shall be as approved by the Owner.
Type Buildings
Type A - Administration Building
- Training Centre
- Main Gate House
- Marketing Office Building
- Canteen/Dining Hall
- Recreation Center
-Control Rooms
- Satellite Rack Room
- Others
B. Office and associated office areas like records/ storage, meeting/ conference room etc.:
F. Staircase.
H. Electrical Room, Pressurization Room, AC Plant, Loading / Unloading bays, Equipment handling
areas, Product storage areas, Switchgear, MCC, Ware House, Work Shop, Process/ Utility Sheds
etc. (All type of buildings):
Type-A x Heavy Duty Cement concrete <if any other, please specify>
flooring.
Type-B
x Vacuum de-watering flooring
Type-C
in large Rooms/ areas
Type-D
Type-E
Type-F
I. Console, Rack room, UPS Room , areas housing instrumentation equipments requiring under-floor
cabling (All type of buildings):
J. Executive Block Including all office areas, lounge, lobby, dining room, meeting/ conference room,
etc. of admin building:
Type-A x Cement Plaster, POP punning & <if any other, please specify>
Plastic emulsion paint
x Granite stone cladding (partly or
full height)
Type-B x Cement Plaster, POP punning
& Plastic emulsion paint
Type-C x Cement Plaster, POP punning
& Plastic emulsion paint
x Granite stone cladding (partly)
B. Office and associated office areas like records/ storage, meeting/ conference room etc.:
Type-A x Cement Plaster, POP punning <if any other, please specify>
& Plastic emulsion paint
Type-B x Cement Plaster, POP punning
& Plastic emulsion paint
Type-A x Granite stone cladding upto <if any other, please specify>
2100mm height and Cement
plaster, POP punning & Plastic
emulsion paint above
x Cement Plaster, POP punning &
Plastic emulsion paint
Type-B x Cement Plaster, POP punning &
Plastic emulsion paint
Type-C x Cement Plaster, POP punning &
Plastic emulsion paint
Type-D x Cement Plaster, POP punning &
Plastic emulsion paint
Type-E x Cement Plaster & Oil Bound
Distemper
Type-F x Cement Plaster & Oil Bound
Distemper
Type-A x Ceramic Tile Dado upto Ceiling/ <if any other, please specify>
False Ceiling
F. Staircase:
Type-A x Cement Plaster & Textured <if any other, please specify>
Coating
x Cement Plaster, POP punning &
Plastic emulsion paint
Type-A x Chemical resistant epoxy coating <if any other, please specify>
over cement plaster up to
Type-B
2500mm height and Cement
Type-C Plaster, POP punning & Plastic
Type-D emulsion paint above 2500mm
Type-E height.
Type-F
H. Electrical Room, AC Plant, Loading / Unloading bays, Equipment handling areas, Storage areas,
Switchgear, MCC, Ware House, Work Shop, Process/ utility Sheds etc. (All type of buildings):
Type-A x Cement Plaster & Oil Bound <if any other, please specify>
Distemper
Type-B
x Cement Plaster, POP punning &
Type-C Plastic emulsion paint
Type-D
Type-E
Type-F
Type-A x Cement Plaster, POP punning & <if any other, please specify>
Plastic emulsion paint
Type-B
Type-C
Type-D
Type-E
Type-F
J. Console Room :
x Granite stone dado upto 1500mm height Cement plaster, POP punning & Plastic emulsion paint
above
x Cement Plaster, POP punning with plastic emulsion paint
B. Office and associated areas like records/ storage, meeting/ conference room etc.:
Type-A x Mineral fibre tile False Ceiling <if any other, please specify>
x Gypsum Board False Ceiling
Type-B
x Combination of Gypsum &
Type-C Mineral fibre tiles false ceiling
Type-D x Cement Plaster, POP punning &
Plastic emulsion paint in records/
Type-E storage rooms
Type-F
Type-A x Mineral fibre tile False Ceiling <if any other, please specify>
x Gypsum Board False Ceiling
Type-A x Cement Plaster, POP punning & <if any other, please specify>
Plastic emulsion paint
Type-B
Type-C
Type Buildings
Type A x Plain cement plaster and texture <if any other, please specify>
coating (‘Heritage’ / ‘Spectrum’ or
approved equivalent)
x Granite stone cladding (partly)
x Plain cement plaster and Acrylic
paint (partly)
x Composite Aluminum Panel &
structural glazing (partly)
x GRC Jaali (partly)
Note: Grooves in plaster shall be provided at junction of different materials and as per external facade
treatment.
C.4.3 Doors
A. Entrance/ exit Doors
Type-A x Powder coated Aluminum glazed <if any other, please specify>
doors
Type-B
x UPVC glazed doors
Type-C
Type-D
Type-E
Type-F
Type-A x Powder coated Aluminum glazed <if any other, please specify>
doors
Type-B
x UPVC glazed doors
Type-C
Type-D
Type-E
Type-F
D. All Electrical Room, A.C. Plant Room, Battery Room doors of all type of Buildings
Buildings:
Type-A x Pressed steel frame with <if any other, please specify>
Pressed steel shutter, Powder
Type-B
coated
Type-C x Powder coated Aluminum door
Type-D with aluminium sheet panel/ACP
Type-E panel
Type-F
E. Toilet doors
Type-A x Cubicle system (with compact <if any other, please specify>
laminated board)
Type-B
x PVC Doors
Type-C x Powder coated Aluminum door
Type-D with aluminium sheet panel/ACP
Type-E panel
Type-F
Irrespective of above schedule, Fire check doors (minimum 2 hours rated) shall be provided wherever
required as per OISD/ Statutory requirements.
1. Fire check doors In Control Room / Satellite Rack Room Building
A. Main entrance/ entry to Console:
x Glazed steel Fire check door
x Solid type steel fire check door (with 300mm x 300mm vision panel)
B. Other Rooms:
x Glazed steel Fire check door
x Solid type steel fire check door (with 300mm x 300mm vision panel)
B. Other Rooms:
x Solid type steel fire check door (with 300mm x 300mm vision panel)
Rolling shutters shall be provided in equipment areas like Switchgear/ MCC Room, Workshop, Ware
House etc. where opening size for door exceeds 3000 x 3000mm, in non-Air-conditioned areas.
Doors/windows/ventilators shall be complete with all fittings & fixtures for easy smooth operation &
locking facility.
Type-A x Powder coated Aluminum glazed <if any other, please specify>
windows & ventilators
Type-B
x UPVC glazed windows
Type-C x Anodised Aluminum glazed
Type-D windows & ventilators
Type-E
Type-F
Type-A x Precoated, profiled colour coated <if any other, please specify>
zincalume steel sheet roofing &
Type-B
cladding
Type-C
Type-D
Type-E
Type-F
Type-A x Wall hung type, coloured <if any other, please specify>
(premium luxury model)
x Pedestal type, coloured
Type-B x Pedestal type, coloured
B. Wash Basins:
C. Urinals:
Type-A x With electronic sensor (premium <if any other, please specify>
luxury model)
x Standard Wall hung type
Type-B x Standard Wall hung type
Type-C x With electronic sensor (premium
luxury model)
x Standard Wall hung type
Type-B x CP Brass
Type-C x CP Brass
Type-D x CP Brass
Type-E x CP Brass
Type-F x CP Brass
DESIGN BASIS/PHILOSOPHY
(STRUCTURAL)
UNIT : 701
Design basis for designing of Structures shall be as per the following attachments:
LIST OF ATTACHMENTS
PART-A (ARCHITECTURAL)
NIL
PART-B (STRUCTURAL)
S. NO. No. of
DESCRIPTION DOC. NO. REV
sheets
Engineering Design Basis (
1 Architectural, Structural, B015-999-81-41-EDB-1001 1 53
U/G civil)
Site Specific Seismic B016-000-16-54-DB-0001
2 0 6
Spectra
Geotechnical Data for
3 B016-701-81-41-GTD-0017 2 74
LSTK Package