Вы находитесь на странице: 1из 190

SPECIFICATIONS AND BILL OF QUANTITY

PROJECT: G+2 OFFICE BUILDING

OWNER: SRS MINES, PETROLEUM, ENERGY, FOREST AND


ENVIRONMETAL PROTECTION BEREAU

LOCATION: JIGJIGA, ETHIOPIA

Date:February 2019
G+2 OFFICE BUILDING OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
AND ENVIRONMETAL PROTECTION BEREAU

SRS MINES, PETROLEUM, ENERGY, FOREST AND ENVIRONMETAL PROTECTION BEREAU G+2 OFFICE BUILDING
PRICED BILL OF QUANTITY
SUMMARY

A. SUB-STRUCTURE

1 Excavation & Earth work Eth. Birr :-

2 Concrete Work Eth. Birr :-

3 Masonry Work Eth. Birr :-

Total (A) Eth. Birr :-

B. SUPER-STRUCTURE

1 Concrete Work Eth. Birr :-

2 Block Works Eth. Birr :-

3 Roofing & Water Proofing Eth. Birr :-

4 Carpentry & Joinery Eth. Birr :-

6 Aluminum Works Eth. Birr :-

7 Finishing Works Eth. Birr :-

8 Glazing Eth. Birr :-

9 Painting Eth. Birr :-

10 Sanitary Work Eth. Birr :-


11 Electrical Installation Eth. Birr :-

Total (B) Eth. Birr :-

Total (A + B) Eth. Birr :-

CONTIGENCY 10 % Eth. Birr :-

15% VAT Eth. Birr :-

GRAND TOTAL Eth. Birr :-

2
G+2 OFFICE BUILDING OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
AND ENVIRONMETAL PROTECTION BEREAU

ECTION BEREAU G+2 OFFICE BUILDING

1,023,890.74

1,688,293.36

145,554.00

2,857,738.10

3,565,642.25

696,286.44

629,517.00

96,966.00

2,077,890.00

3,116,222.91

261,920.00

754,901.68

593,265.00
3,452,874.00

15,245,485.28

18,103,223.38

1,810,322.34

2,715,483.51

22,629,029.23

3
G+2 OFFICE BUILDING OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
AND ENVIRONMETAL PROTECTION BEREAU
Item Description Unit Qty Rate Amount

A-SUB STRUCTURE

1. EXCAVATION & EARTH WORK

1.1 200mm thick top soil removing and site clearing M2 902.01 20.00 18,040.20

1.2 Bulk excavation in ordinary soil for to a depth not exceeding


300 mm from reduced level. M3 1,030.43 110.00 113,346.75

1.3 Dito as item 1.2 but not exceeding 320mm M3 - 110.00 -

1.4 Excavation for isolating footing to a depth not exceeding 150mm from
bulk excavation level. M3 400.72 120.00 48,086.46

1.5 Dito as item 1.4 but not exceeding 300mm M3 - 120.00 -

1.6 Excavation in stone masonary foundation of depth not exceeding 150cm M3 64.22 110.00 7,063.65

1.7 Fill around footing and foundation columns with imported selected materials
from out side well rolled and compacted in layers not exceeding
200 mm thick. M3 280.23 268.00 75,102.58

1.8 Fill under hard core with imported selected materials from out side well rolled and
compacted in layers not exceeding 200 mm thick. M3 789.99 268.00 211,717.99

1.9 Cart away surplus excavated material to a distance not exceeding 5kms. M3 2,094.70 180.00 377,046.56

1.10 250mm thick basaltic or equivalent stone hard core well rolled,
consolidated and blinded with crushed stone. M2 588.09 295.00 173,486.55

Total carried to summary 1,023,890.74

2. CONCRETE WORK

2.1 50 mm thick plain blinding lean concrete quality C-7


with minimum cement content of 150 kg /m3, of concrete:
a) Under footing footing M2 215.31 200.00 43,062.50
b) Under grade Beam M2 85.78 200.00 17,155.00
c) Under masonry wall M2 91.09 200.00 18,218.00
d) Under ground floor slab M2 588.09 200.00 117,618.00

2.2 Reinforced concrete quality C-25 with minimum cement


content of 360 kg /m3 filled into form work and vibrated
around rod reinforcement (Formwork and reinforcement
measured separately)
a) In footing pad M3 98.55 2,600.00 256,230.00
b) In foundation columns M3 13.57 2,600.00 35,274.20
c) In grade beam M3 34.31 2,600.00 89,206.00
d) In 10cm thick ground floor slab M2 588.09 300.00 176,427.00

2.3 Provide, cut and fix in position sawn ZIGBA form work, or steel
formwork, whichever is appropriate, strictly you should use molded
oil paint, form work should not removed before 24 hours.
a) In footing pad M2 156.36 275.00 42,999.00
b) In foundation columns M2 137.42 275.00 37,790.50
c) In grade beam M2 274.72 275.00 75,548.00

2.4 Chip wood or equivalent expansion joint filler as per the structural
drawing and engineer recommendation.
a) Between slab & beam on ground floor level Ml 511.75 50.00 25,587.50

2.5 Mild steel re-bar according to structural drawings. Price shall include
cutting, bending, placing in position a nd tying with ø1.5mm wire,
a) ø8 mm deformed bar Kg 3,260.25 62.00 202,135.56
b) ø12 mm deformed bar Kg 1,081.17 62.00 67,032.33
c) ø14 mm deformed bar Kg 3,959.76 62.00 245,504.99
d) ø16 mm deformed bar Kg 3,846.85 62.00 238,504.78

Total carried to summary 1,688,293.36

3. MASONRY

3.1 Hard basaltic or equivalent 500mm thick stone masonry wall foundation
below basament beam level bedded in cement sand mortar ratio of (1:3). M3 85.62 1,700.00 145,554.00

Total carried to summary 145,554.00

B. SUP ER STR UCTURE


1. CONCRETE WORKS
1.1 Reinforced concrete, filled in to formwork and vibrated
around rod reinforcement ( formwork and reinforcement are measured
separately) Use OPC cement type for all structural elements.
1.11 C-25 concrete class to:
a) In elevation columns. M3 40.55 2,600.00 105,425.42
b) In floor beam. M3 13.86 2,600.00 36,030.80
c) In 20cm thick suspended floor slab M3 401.28 2,600.00 1,043,323.32
d) In staircase and landing M3 20.79 2,600.00 54,057.12

1.2 Provide, cut and fix in position sawn ZIGBA form work, or steel .
formwork, whichever is appropriate, you may use molded
oil paint over form work, and shall not removed before 24 hours.
a) In elevation columns. M2 432.98 280.00 121,235.52
b) In floor beam. M2 124.08 280.00 34,741.00
c) In 20cm thick suspended floor slab M2 2,117.25 280.00 592,829.72
d) In staircase and landing M2 284.82 280.00 79,750.16

1.3 Mild steel re-bar according to structural drawings. Price shall include
cutting, bending, placing in position a nd tying with ø1.5mm wire,
a) ø8mm deformed bar Kg 3,445.54 62.00 213,623.58
b) ø10mm deformed bar Kg 5,455.19 62.00 338,221.59
c) ø12mm deformed bar Kg 3,228.52 62.00 200,168.20
d) ø14mm deformed bar Kg 1,472.38 62.00 91,287.74
e) ø16mm deformed bar Kg 10,563.68 62.00 654,948.08

Total carried to summary 3,565,642.25

2. BLOCK WORK

Walls shall be c onstructed from class 'B' hollow concrete blocks. T he bloc ks shall be
selected for their consistency in dimensions, sha pes, angles and stre ngth. Blocks should
be free from cracks or any other defects and the surface c haracteristic of the blocks
shall be in such a wa y that good key for plaster is obtained.

2.1 20cm thick HCB wall, embedded in cement-sand mortar


of 1:3 mix ratio. Both sides shall be left for plastering. M2 1,248.33 330.00 411,948.24

2.2 Ditto item 2.1 but 150mm thick HCB walls. M2 917.22 310.00 284,338.20

2.3 Ditto item 2.1 but 100mm thick HCB walls. M2 24.60 290.00 7,134.00

Total carried to summary 696,286.44

3- ROOFING & WATER PROOFING.

3.1 Brush and blow out dirt, dust, scrapings & all other loose material
until the reinforced concrete slab is fully cleared. Cast a light weight
concrete with 240 Kg /m3 cement content on all the roof and concrete
gutter by providing the given slope with a minimum depth of 50mm.
The light weight concrete should be allowed to cure completely to
avoid cracks that could appear due to shrinkage or settlement. M2 750.00 120.00 90,000.00

3.2 Supply and lay cement-sand screed over the cured light-weight
concrete area of item 4.1 above with cement sand mix 1:3 and 1:1
with an average thickness of 30mm. M2 750.00 75.00 56,250.00

3.3 Supply and lay a single ply Hertalan or equivalent water-proofing


system, manufactured from a special EPDM rubber compound,
shall be used on the terrace roof & concrete gutter surface.
The water-proofing EPDM-system shall include contact and
bonding adhesives, sealant roof drains connection and all other
necessary accessories needed to complete the work. The entire
work shall be executed based on details provided by the
manufacturer and approval of engineer. M2 981.90 450.00 441,855.00

3.4 Supply & fix dia.100mm PVC down pipe, fixing shall be done by
means of metal rings. Work & cost includes metal strainer and two coats
of oil paint. Ml 68.20 85.00 5,797.00

3.5 Galvanized Metal sheet flashing (Dev.L=35cm) Ml 209.50 170.00 35,615.00

Total carried to summary 629,517.00

4. CARPENTRY AND JOINERY

4.1 CARPENTRY

4.1.1 Supply and fix 7x10cm high quality wooden purlin at every 60cm c/c spacings. Ml 280.80 125.00 35,100.00

4.1.2 Supply and fix pvc suspende d ceiling nailed to 4x5cm w oode n purlin. Price includes
angular corner list . M2 152.80 575.00 87,860.00

4.2 JOINERY

FLUSH DOORS

Supply & fix 3EL LE brand, AL OE Porto SSF or equivale nt model 44mm thic k inte rior
single leaf flush doors with leaf resins-bonded honey comb core in hard board ra ised
pla ns on upper and lower part of the door in M DF. T he frame shall be solid wood strips
4.2.1
trims in plywood with L -shape to allow a djustment of fra mes to w all thickne ss by at
least 5mm fitted w ith noise reduction ga sket. The door finished with veneer and c oated
in Italian w alnut finish. ASSA or ICSA or equivalent type lock, key and strike pla te in
brass-coated ste el, thre e bra ss coated pin hinge s with at least 14mm dia mete r handle in
solid brass ac cessories should be incorpora ted. The model of the acc essories shall a ll
be a pprove d by the engineer.

a) D1 (size: 70x210)cm No 20.00 2,016.00 40,320.00


b) D2 (size: 90x210)cm No 22.00 2,268.00 49,896.00
c) D3 (size: 180x250)cm No 1.00 6,750.00 6,750.00

Total carried to summary 96,966.00

6. ALUMINUM WORKS

Every Door and w indow frame is manufactured from Aluminum tubular frame,
EURO profile or equivalent, 2mm thick, with an average w eight that shall be approved
by the e ngine er. All works shall be done according to the window, door sche dule.
6.1 Comple te work includes all the necessary Iron monger and approved type of
cylindrica l lock handles. Joints shall be w ater tight. Fixe d and ope ning panels e xposed
to we athe r shall be provided with weather strips, insuring tha t the strips are fixed
continuous enough to be wa ter tight. All aluminum w indow s & doors type shall be
approved by the engineer.

6.1.1 Window Doors


6.1.1.1) WD1 Size 460x300cm No 1.00 30,360.00 30,360.00
6.1.1.2) WD2 Size 1055x300cm No 3.00 69,630.00 208,890.00
6.1.1.3) WD3 Size 460x300cm No 14.00 30,360.00 425,040.00
6.1.1.4) WD4 Size 265x300cm No 1.00 17,490.00 17,490.00
6.1.1.5) WD5 Size 705x300cm No 1.00 46,530.00 46,530.00
6.1.1.6) WD6 Size 150x300cm No 7.00 9,900.00 69,300.00
6.1.1.7) WD7 Size 180x300cm No 2.00 11,880.00 23,760.00
6.1.1.8) WD8 Size 355x300cm No 1.00 23,430.00 23,430.00
6.1.1.9) WD9 Size 770x300cm No 1.00 50,820.00 50,820.00
6.1.1.10) WD10 Size 395x300cm No 1.00 26,070.00 26,070.00
6.1.1.11) WD11 Size 545x300cm No 1.00 35,970.00 35,970.00
6.1.1.12) WD12 Size 810x300cm No 1.00 53,460.00 53,460.00
6.1.1.13) WD13 Size 470x300cm No 1.00 31,020.00 31,020.00
6.1.1.14) WD13 Size 285x300cm No 1.00 18,810.00 18,810.00
Windows
6.1.1.15) W1 Size 460x200cm No 5.00 20,240.00 101,200.00
6.1.1.16) W2 Size 100x100cm No 11.00 2,200.00 24,200.00
6.1.1.17) W3 Size 300x160cm No 3.00 10,560.00 31,680.00
6.1.1.18) W4 Size 1280x100cm No 2.00 28,160.00 56,320.00
6.1.1.19) W5 Size 355x100cm No 2.00 7,810.00 15,620.00
6.1.1.20) W6 Size 570x100cm No 2.00 12,540.00 25,080.00
6.1.1.21) W7 Size 445x300cm No 1.00 29,370.00 29,370.00
6.1.1.22) W8 Size 890x100cm No 1.00 19,580.00 19,580.00
6.1.1.23) W8 Size 990x100cm No 2.00 21,780.00 43,560.00
6.1.1.24) W8 Size 100x300cm No 1.00 6,600.00 6,600.00
6.1.1.25) W8 Size 300x100cm No 4.00 6,600.00 26,400.00
6.1.2 Supply & fix structural curtain wall, framed with anodized aluminum
profile frames, with tinted 6 mm thick single glass & sealant all as per
the engineers approval & detail drawings. Unit price shall include glass,
anchorage, sealant, 12mm thick melamine coated chip wood panel
cladded internally below the level of window cill & all other necessary
works needed to complete the work.
a) CW1(size:970x950) cm No 1.00 322,525.00 322,525.00
b) CW2(size:230x940) cm No 1.00 75,670.00 75,670.00
c) CW3(size:460x625) cm No 1.00 100,625.00 100,625.00
d) CW4(size:140x950) cm No 1.00 46,550.00 46,550.00

6.2 Supply and fix 90cm high rail to the stair case made from Ø40mm
stainless steel pipe baluster, Ø40mm aluminum handrail & 4 rows of
Ø20mm stainless steel guard rails. Price shall include metal
plates and all other necessary works and materials needed for
anchorage. Price shall also include one coat of anti rust & synthetic
enamel spray paint to metal parts & all other necessary accessories
needed to complete the work. Ml 41.80 2,200.00 91,960.00

Total carried to summary 2,077,890.00

7. PLASTERING, FLOOR , WA LL
AND OTHER FINISHING WORKS

PLASTERING

7.1
Supply and apply two coa ts of plaster in ce ment-sand mortar to eve ry internal wall
surface , columns a nd beams. M ix ratio sha ll be 1:3.Pric e shall inc lude preparing the
ba ckground for pla ste ring by hacking, nicking out joints c hiseling smooth surfac es to
roughen them, etc. M2 3,689.03 135.00 498,018.65

7.2 Ditto ite m 7.1 but to the exte rnal HCB wa ll surface . M2 1,248.33 135.00 168,524.28

7.3 Ditto item 7.1 but to the Concrete slab Ceiling. M 2 2,117.25 135.00 285,828.62

7.4 Ditto item 7.1 but to the stair soffit. M2 284.82 135.00 38,450.97

7.5 Supply & a pply approved gypsum plaster with a minimum thickness of 3mm over
the 2 nd coat plastered surface of interna l w all . Work & cost includes:-pre paring the
surface s, preparing e very working materials etc. Applic ation shall be done a fter w ell
cured the plastered surface and as per the instruction of the engineer M2 3,363.03 50.00 168,151.35

7.6 Ditto item 7.5 but to the Concrete slab Ceiling M2 2,117.25 50.00 105,862.45

7.7 Ditto item 7.5 but to the stair soffit. M2 284.82 50.00 14,241.10

FLOOR & WALL FINISHES

7.21 Supply and lay polished, chamfered & calibrated Sylvia epoxy treated
or equivalent type Marble/Granite tile.The price shall include Mapei, Cercol,
Keracol or equivalent type fillers and adhesive.
a) For thread (champhered & grooved at the bottom of front
edge & three rows of groove at the top of front edge for non
slippery) . size ( 35 x 3)cm. Ml 179.20 850.00 152,320.00
b) For riser.
size ( 14 x 2)cm. Ml 179.20 500.00 89,600.00
c) For floor tile.
size ( 40x40x3)cm. M2 13.65 1,600.00 21,840.00
d) For skirting .
size (10×2)cm Ml 58.80 350.00 20,580.00

7.22 Throated, weathered, champhered & grooved Marble/Granite window and door sill
embedded on Max Fix or equivalent cement mortar.
Size 3 x 28 cm window sill. Ml 305.95 750.00 229,462.50
Size 2 x 20 cm door sill. Ml 37.70 650.00 24,505.00

7.23 Supply and fix 300x400mm R.A.K. or equivalent ceramic wall tiles.
Color, Pattern, thickness adhesive & grouting shall be approved by
the engineer. M2 303.00 540.00 163,620.00

7.24 Supply and fix 300x300x0.8mm non slippery R.A.K. or equivalent


ceramic floor tile lay over the pre finished screed surface. Color,
Pattern, thickness & cement adhesive shall be approved by the engineer. M2 63.50 800.00 50,800.00

7.25 Supply and fix 600x600x0.8mm non slippery RAK Dubai or equivalent
porcelain floor tile lay over the pre finished screed surface. Color,
Pattern, thickness & cement adhesive shall be approved by the engineer. M2 1,528.90 580.00 886,762.00

7.26 Ditto item no.7.24 but 10cm height non slippery ceramic skirting. Ml 106.00 310.00 32,860.00

7.28 Ditto item no.7.25 but 10cm height non slippery porcelain skirting. Ml 531.60 310.00 164,796.00

Total carried to summary 3,116,222.91

8. GLAZING

8.1 Supply and fix 5mm thick Belgian Glaver Bel or equivalent tinted glass
with rubber beads to doors, windows and window doors as shown on the
drawings. Price shall include all the necessary works needed to
complete the work. M2 654.80 400.00 261,920.00

Total carried to summary 261,920.00

9. PAINTING

9.1 Apply three coats emulsion paint to internal plastered wall surface including
beam & column surfaces. Paint type and color shall approved by the architect. M2 3,363.03 40.00 134,521.08

9.2 Ditto item 9.1 but on concrete ceiling surface. M2 2,402.07 40.00 96,082.84

9.3 Apply granite paint to external wall surface M2 1,248.33 420.00 524,297.76

Total carried to summary 754,901.68

10-SANITERY INSTALLATION

10.1 SANITARY INSTALLATION


1.1 SANITARY EQUIPMENT (FIXTURES)

All Fixture s Shall Be First Cla ss European Standard/Manufacture d & Should Subject
To The Engineer's, Consultant' s or Client's Approval Ba se d on Sample s, Catalogues
&/or Brochures Presented By The Contractor. Unit Price Shall Include All The
Nece ssary Fixing Hooks or Bra cke ts, Fittings, Accessories, & All Other Relevant
Activities As Civil Works (Chie se ling of Walls, Be ams &/or Floors) & e tc ... For The
Prope r Installation & O peration of The Fixtures, Pipe s & All Othe r Sanitary Materials
Based On Relevant Clauses of L ocal & International Standa rds.

China with long lever controlled Rem er or equivalent chrome p lat ed c ol d an d


hot water mixer tap, pedes tal st an d, complete wi th plu g, ch rom e plated chain,
P- Smell trap with conn ecti on p ipe and all other n ecessary conn ecti ng and
fixing fit tings and accessories for the proper inst al lat ion and operation of t he
1.1.2 basin . T he basin shall also conform with t he relevan t clauses of L ocal &
Int ernational St an dard s.

Size: 560*420*840mm (l*w*d) (Approximate Size).


Color: White
Tap: Remer or Equivalent Long Lever Cold & Hot Water Mixer Tap.
Accessories: Remer or Equivalent. Nº 14 3,500.00 49,000.00

Supply, fix, test and commission wash dow n Water Closets m ad e of whit e vitreous
China with plasti c seat an d cover incl udin g 6 to 9 li ters capacity low flu sh
cistern with pu sh butt on, si lent filling syst em & chromiu m plated wat er
connection un derneat h the cistern complete wi th al l n ecessary conn ect ing and
1.1.3 fixing fit tings and accessories for the proper inst al lat ion and operation of t he
closet . T he closet shall conform with Local and In ternation al Standards.

Trap: "S" Smell Trap.


Size: 706*360*795mm (l*w*d) (Approximate Size)
Color: White
Accessories: Remer or Equivalent. Nº 12.00 4,000.00 48,000.00

chrome p lat ed brass with conic al flexable hose of 1200mm length, chrom e
plated angle valv e, ceramic head work & "L ux" brass sh ower head, an d all t he
necessary con nect ing an d fixing fittin gs and accessories for th e proper
installation and fu nct ioning of th e valve. The fixture s hall c on form with L ocal
1.1.4 and Int ernational St an dard s.

No 12.00 560.00 6,720.00

chrome p lat ed fast enin g sc rews comp lete with all the n ecessary fi xin g and
connecting accessori es for the proper inst all at ion and op eration of t he rai l. T he
rail shall conform with Loc al & Internat ional St and ard s. / For actu al location or
1.1.5 place of fixi ng, refer Arc hitectural schedule or con sult t he Arc hitect./

Model: Orient Accessories Built-in Rail.


Length: 600mm. Nº 14.00 850.00 11,900.00

all t he necessary fixing an d connectin g accessories for th e proper in stallat ion


and operation of t he hold er. The fixture sh all conform with L ocal &
Int ernational St an dard s. / For act ual loc at ion or p lace of fixing, refer
Archit ect ural sc hed ule or consu lt the Archit ect ./
1.1.6

Model: Orient Accessories Built-in Rail.


Supply and fix Toilet P ap er Hold er made of white vitreou s China mount ed t o
Size: 185*95mm.
wal l c omplete
Color: White. wit h al l t he necess ary fixing and conn ect ing acc essories for t he Nº 14.00 550.00 7,700.00
proper in stallat ion an d operation of t he fixt ure. Th e fixtu re shall conform wit h
Local & Intern at ional Stand ards . /F or actu al location or place of fixing, refer
Arch itectural schedule or cons ult th e Arch itect./
1.1.9

Model: Orient Accessories Built-in Rail.


Size: 170*185mm.

2
G+2 OFFICE BUILDING OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
AND ENVIRONMETAL PROTECTION BEREAU
Item Description Unit Qty Rate Amount
Color: White. Nº 12.00 550.00 6,600.00
and all t he necessary connec ting and fi xin g fitt ings & accessori es for the proper
installation and operat ion of the mirror.
1.1.7

Size: 600*500mm. Nº 14.00 850.00 8,500.00

1.1.8 Supply, fix, te st & commision approved quality Floor Drain made of p olished
stainless steel comp lete with P-Smell t rap (minim um d ept h of 75mm ) and all
other n ecessary conn ecti ng fitt ings and accessories.
80mm diameter. Nº 12.00 950.00 11,400.00

Supply, fix, te st and c ommission Stainless Stee l FRAN KE or equivalent unde r cabinet
Laboratory Sink / T o be ap proved by subm itt ing Cat alogu es/ wi th dou bl e
bowl as where shown on th e drawing compl ete with long lever ac tion cold and
1.1.9 hot water m ixer t ap , ch rom e plated chain, plu g, ch rom e plated faucet, P-Sm ell
trap an d all t he necessary connecting and fixi ng acc essories for t he proper
inst allation and op erat ion of th e sink.

Material: Stainless Steel.


Color: Silver. Nº 8.00 9,000.00 72,000.00

1.1.10 Supply and install instant water heater made for E uropean standard. T he unit pric e
shall include all the nec essa ry la bour and ma te rial cost.
i - Capcity : 80liters Nº 2.00 4,000.00 68,000.00

Supply 12kg Dry Powder Fire E xtinguishe r for ABCE class of fire a s where shown on
1.1.11 the dra wing in basement parking. The mate rial shall comply with T UV, BSI, N FPA or
equivalent institution c ertification and approval. Comple te w ith approved sta ndard
ha nging and fixing material Nº 2.00 200.00 68,000.00

10.2 PLUMBING WATER SUPPLY SYSTEM

Supply, install, disinfe ct, test and commission Pota ble Cold & H ot Water Supply
VE SBO-P IPE S DR 6 or its equ ivalent P PR- P ip es (PN20), inc ludi ng pipe
fit tings, sup porting cl am ps, anch ors , ins ulation (if necessary) and pai nting as
where required , c utt ing and maki ng of chiesels on walls, floors &/ or beam s (if
1.2.1 nec essary) an d nec essary accessori es al l as specifi ed in t he technic al
specific at ion of the material an d s hown on the d rawin gs as per t he
manufac turer's instruc tions & recomm end at ion. T est ing of lines shal l be
exec uted at a min imum pressu re of 10Kg/ cm2 or twice t he working pressure,
which ever is greater at the expen se of th e Contractor. NOT E: the diamet ers
which are list ed are NOMINAL (internal) diameter of t he pip e and the lengt h
of each p ipe m ust be at least 4m.
a) diameter 20mm Nominal diameter & wall thickness of 3.4mm ml 95.00 70.00 6,650.00
b) diameter 25mm Nomial diameter & wall thickness of 4.2mm ml 24.00 80.00 1,920.00
c) diameter 32mm Nominal diameter & wall thickness of 5.4mm ml 20.00 100.00 2,000.00

Supply, fix, te st, and commission Europea n Standa rd (Manfa ctured) Chromium
1.2.2 Service/Angle Valve on the water supp ly p ipe before sanit ary ap pliances
inclu ding all ac cessories, as specified in th e technical specifi cat ion and s hown
on the drawin gs.
a) diameter 20mm Nº 40.00 270.00 10,800.00

Supply & install high qua lity (M anufa ctured) Bronze G ate Valve on the wa ter supply
1.2.3 pipe riser branc h lines a nd room c ontrolling . N OTE : the bronze gate valve s must be
same bra nd with the ppr pipe s.
a) diameter 25mm Nº 8.00 295.00 2,360.00
b) diameter 32mm Nº 10.00 330.00 3,300.00

10.3 WATER TANKERS PUMPS AND ACCESSORIES


1.3.1 WATER TANKS & ACCESSORIES @ ROOF LEVEL.

Supply and install 2000 liters capacity water ta nk made of fiber glass wa ll thickne ss
5mm or equivale nt complete with required gate valve s, float valve, inlet and outlet
pipe, over flow & drain, vent pipe a nd all the necessary accessories the reto. T he tank
shall be pla ced on the concrete fla t roof. Nº 3.00 5,000.00 15,000.00

Supply HD PE pipes for roof leve l a nd e xposed water supply pipe sutem (PN 16) w ith
1.3.2 all the nece ssary connecting piece s such as bends, unions te es e tc .the pipes and fittings
ha s to mee t BS standard or equivalent institution and the pipe diameter listed are
external dia meter.

a) diameter32mm ml 50.00 330.00 16,500.00

10.4 WASTE, VENT AND STORM WATER PIPES AND ACCESSORIES

All domestic waste, vent and storm wate r pipe lines shall be uPVC pipes and shall be
provided with a minimum slope of 1.5% towards the outle t unless specified. A ll uPVC
pipes and necessary fittings sha ll be standard quality and be fre e from damage during
storage , transportation, instullation etc. Unit price shall inc lude all the necessary
assista nce c ivil works, such as excavation cartaway, fixing or hanging to w alls, beams
or sla bs etc., nec essa ry fittings such as bends, Ys, T s, socke ts, gaskets etc.

Supply, install, test & commission uPVC (Unp lasticized Poly Venyl Ch lorid e)
Series 3 (P N6) wast e wat er drainage an d vent pipes that comp ly with DIN
10.4.1 8062 accordin g t o wh ere shown on t he drawings, comp lete with all the
nec essary c onnec ting & fixing pieces, cleanin g access, anc hors, sockets &/or
ad ap tors, acc essories & civil works thereto for the proper inst al lat ion &
operation of the syst em .
a) Diameter 50 mm with wall thickness 3.2mm ml 50.00 85.00 4,250.00
c) Diameter 110 mm wall thickness 3.5mm ml 79.00 135.00 10,665.00

Supply and install approved qua lity storm wate r drainage u PVC (Unplas tic ized
Poly Venyl C hloride) Series 3 (P N6) Down Pip e for st orm water drain age
1.4.2 system that com ply with DIN 8062 accordi ng to where sh own on the
drawings. Price sh all inc lude paintin g of UV-Radi at ion protec tion & all th e
nec essary c onnec ting pieces , fixin g & corrosion free clam ping elem ent s and all
other n eec essary assist anc e civil works ther t o for the p rop er installation &
operation of the syst em .
c) diameter 110 mm ml 50.00 155.00 7,750.00

Supply and install Vent C ap s mad e of rigid u PVC to be conn ect ed to t he roof
1.4.3 term inal of vent pipe as shown on t he riser diagram, c omplete wit h al l t he
nec essary s ealings, gaskets to roof water proofi ng mem brane i nclud ing
stainless steel screws/ as requ ired and all other accessories.
a) diameter 50 mm Nº 8.00 450.00 3,600.00

10.5 SITE WASTE & STORM WATER DRAINAGE SYSTEM


1.5.1 Waste Water Drainage

Supply and lay uP VC (Un plasticized Poly Venyl Ch lorid e) (PN6) Orange for
external waste & storm water d rainage pi pes t hat c omply wit h BS 4660 & B S
5481 accordin g t o t he d rawing shown wit h a m inimu m slope of 1.5% or natural
ground sl ope whic h ever is greater on a firm bed of selected materi al. Th e
joints shall be made tight and i nstallat ion shall make the best con diti on for
cleanin g and m ai nten anc e. Uni t price sh all in clude excavat ion of the trenc h.
cart away, back-fill & all ot her nec essary c ivil works t here t o.
a) diameter 150 mm ml 45.00 450.00 20,250.00

Supply and install circular sew er Man Hole made of precast concrete pipe with inte rnal
dimension of 600*600*900mm(avg. depth), rested on mass concrete be nching size
1000*1000*100mm concrete bottom slab reinforced with diameter 8mm reinforce ment
1.5.2 ba r c/c 200mm both w ays. The bottom slab shall rest on 150mm thick well compacted
selected ma terial. Man hole cove r shall be RC conc rete 80mm thick with 8mm
reinforc eme nt bar @200mm c /c both ways as shown on the drawing. Unit price shall
inc lude excavation, c art-away, c ompa ction and ba ck-fill as required and all assistance
civil w orks the re to. Nº 16.00 2,650.00 42,400.00

suply and c onstruct 30 mq. Capacity septic tank in masonry wa ll w ith both top a nd
1.5.3
bottomconcrete slab thic knes 200mmthick with manhole openings and with inlet and
outlet pipe conections LS 1.00 24,000.00 88,000.00

TOTAL CARRIED TO SUMMARY ................................................... 593,265.00

11.ELECTRICAL INSTALLATION
Supply and install :-
1 Power & Tele Intakes (Provisional Quantity)
Cost of EEPCo power Intake LS LS 750,000.00 750,000.00

1 Standby Diesel Generator Set


Fix Die se l genera tor set of 43kW (at site ), 380/220V, 4-wire, 50Hz, 1500rpm, skid
mounted, complete with Automatic L oa d Transferee Sw itch, all necessary control and
1.1 alarm equipment; and as indica ted on the drawing. No 1 627,000.00 627,000.00

2 Manhole
Manhole in bricks and with conc rete ba se internally of 1500x1500x700mm inc luding
2.1 concrete cove r with lifting hole. No 2.00 2,500.00 5,000.00
-
Manhole in bric ks and with concrete base internally of 500x500x500mm inc luding
2.2 concrete cove r with lifting hole. No 9.00 2,500.00 22,500.00

3 PVC pipes.
3.1 70 mm diameter for Power and Tele ml 122 70.00 8,540.00
3.2 60 mm diameter for Power and Tele ml 100 70.00 7,000.00
3.3 29 mm diameter for power lines from MDB to SDBs ml 588 30.00 17,640.00
3.4 16mm diameter for power lines from SDB to EACH SOURCE
4 Low Voltage System Earth

Low voltage system ea rthing (1x50)sq. mm bare copper conduc tor from CMD B earth
terminal ,to copper c lad steel e arthing rod of 16x2400mm in ma nhole measured
elsewhere (15m). [needs to ha ve a mesh of 3 earthing rods to achieve the expected
4.1 earthing resista nce ] No 1.00 5,500.00 5,500.00

1x16 sq mm bare c oppe r earth conduc tor from kWhmt board earth terminal to earth
4.2 rods in PV C pipe 50mm diameter. ml 7 450.00 3,150.00

5 Distribution Boards
Flush mounted distribution Board, MDB w ith loc kable door and including bus bars of
100 A mp 3Phase, all nece ssary fixing and c onne cting accessories, complete and
5.1 consisting:-
5 pcs 10A, MCB, 1Phase
2 pcs 32A, MCB, 1Phase
2 pcs 20A, MCB, 1Phase
1 pcs 32A, MCB, 3Phase
1 pcs 40A, MCB, 3Phase
1 pcs 100A, MCB, 3Phase No 1 12,500.00 12,500.00
25% reserve pitches all complete
2 pcs digital KWHM 50-600A /3P, with Relay
3 pcs ammeter of (0-600A) with current transformer
1 pc volt meter (0-500 V), with selector switch
1 Surge arrestor of appropriate size
3 pcs pilot lamps.
5.1 Ditto a s above but for SD B-GF /A, and consisting:40A-
15 pcs 10A, MCB, 1Phase
6 pcs 16A, MCB, 1Phase No 1 9,400.00 9,400.00
1 pc main 40A, MCB, 3Phase
25% reserve pitches all complete

5.2 Ditto a s above but for SD B-GF /B, and c onsisting 32A:-
5 pcs 10A, MCB, 1Phase
2 pcs 16A, MCB, 1Phase
25% reserve pitches all complete No 1.00 2,000.00 2,000.00

5.3 Ditto a s above but for SDB-1F /A, a nd consisting 32A:-


11 pcs 10A, MCB, 1Phase
6 pcs 16A, MCB, 1Phase
1 pc main 32A, MCB, 3Phase
25% reserve pitches all complete No 1.00 2,500.00 2,500.00

5.4 Ditto a s above but for SD B-1F /B-CONSISTIN G


4 pcs 10A, MCB, 1Phase
1 pcs 16A, MCB,1 Phase
1 pcs 32 A, MCB, 1Phase
25% reserve pitches all complete No 1.00 2,000.00 2,000.00

5.5 Ditto a s above but for SDB-2F c onsisting :-


12 pcs 10A, MCB, 1Phase
7 pcs 16A, MCB, 1Phase
1 pc main 32A, MCB, 3Phase
25% reserve pitches all complete No 1.00 3,000.00 3,000.00

5.6 Ditto a s above but for SDB-UF


2 pcs 10A, MCB, 1Phase
2 pcs 16A, MCB, 1Phase
1 pcs 20A, MCB, 1Phase
25% reserve pitches all complete No 1.00 2,000.00 2,000.00

6 Cables
6.1 (3x2.5) Sq mm ml 310 65.00 20,150.00
6.2 3x4 mm sq. m 58 60 3,480.00
6.3 5x6 mm sq. m 80 150 12,000.00
6.4 (5x10) Sq mm ml 28 388.00 10,864.00
6.5 3x35/16 mm sq. m 100 3000 300,000.00

7 Extra Over Light Points for Flush Mounted Switches


7.1 Flush mounting single switch No 10.00 200.00 2,000.00
7.2 Flush mounting two way switch No 23.00 200.00 4,600.00
7.3 Flush mounting double switch No 80.00 250.00 20,000.00
7.4 Flush mounting intermediate switch No 3.00 250.00 750.00

6 Light Points

Flush mounted light points fed through PVC insulated c onductors of 2x2.5mm 2 inside
PVC conduits of 16mm dia mete r, including junction boxes w ith covers and insulating
screw c ap connec tors, complete
No 540 380.00 205,200.00

8 Flush Mounted Socket Outlet Points


10-16A/1P socket outlet points fed through PVC insulated conductors of 3x2.5mm 2
inside PVC c onduit of 16mm diameter including junction boxes with covers and
insulating scre w cap c onne ctors.
8.1 No 123.00 550.00 67,650.00
10 Flush mounted Socket Outlets with earth contact
10.1 Flush mounting single socket outlet of 10A/16A 1ph No 123 200 24,600.00

Telephon System
-The system shall be installed as per ETC standard

RJ 45 4 pair Tele socket out let points to for


flush mounting in thermoplastic conduit of 21mm
with appropriate type junction box fed by standard
(CAT 6A UTP data cable) No 80 280.00 22,400.00

RJ 45 4 pair Tele socket outlets Nº 80 200.00 16,000.00

Note :- Use PV C conduit for risers and drops


I. Supply of Lighting fitting by the Client,

II. An average Unit price is considered for


cost estimation,
III. The price of fittings under this item to be
EXCLUDED in the contract agreement.
N.B.
Recommended types of fittings indicated
on the attached lighting fitting Schedule.

(a) Lighting fittings and lamps complete No 540 1,560.00 842,400.00


TYPE 1 No 11 450.00 4,950.00
TYPE 2 ` 15 450.00 6,750.00
TYPE 3 No 8 700.00 5,600.00
TYPE 4 No 115 1,250.00 143,750.00
TYPE 5 No 8 1,250.00 10,000.00
TYPE 6 No 188 1,250.00 235,000.00
TYPE 7 No 9.00 1,250.00 11,250.00
TYPE E No 25 150.00 3,750.00
379 -

TOTAL CARRIED TO SUMMARY ................................................... 3,452,874.00

3
TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

MAIN BLOCK & LABORATORY


B.SUPER STRUCTURE
1.0 CONCRETE WORK
ELEVATION COLUMN
a) In elevation columns.
40x40
53 / 3 l= 3
0.4 w= 0.4
0.4 d= 0.4
25.44 m3
25x30
8/ 3 l= 3
0.25 w= 0.25
0.3 d= 0.3
30x30
36 / 3 l= 3
0.3 w= 0.3
0.3 d= 0.3
9.72 m3
dia.40
13 / 3 l= 3
3.14 w= 3.14
0.044 r2= 0.044
5.39 m3
40.55 m3 GRAND TOTAL
b) In floor beam.

B11
4/ 1.55 l= 1.55
0.25 w= 0.25
0.4 d= 0.4
0.62 m3
B13
2/ 2.6 l= 2.6
0.25 w= 0.25
0.4 d= 0.4
0.52 m3
B14
2/ 5.6 l= 5.6
0.25 w= 0.25

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

0.4 d= 0.4
1.12 m3
B14-1
1/ 11.73 l= 11.73
0.25 w= 0.25
0.4 d= 0.4
1.17 m3
B14-2
1/ 15.65 l= 15.65
0.25 w= 0.25
0.4 d= 0.4
1.57 m3
B14-3
1/ 7.97 l= 7.97
0.25 w= 0.25
0.4 d= 0.4
0.80 m3
B14-4
1/ 11.3 l= 11.3
0.25 w= 0.25
0.4 d= 0.4
1.13 m3
PB
1/ 12.1 l= 12.1
0.2 w= 0.2
0.3 d= 0.3
0.73 m3
PB
7/ 1.35 l= 1.35
0.2 w= 0.2
0.3 d= 0.3
0.57 m3
RB7
2/ 15.4 l= 15.4
0.25 w= 0.25
0.4 d= 0.4
3.08 m3
RB8
2/ 6.4 l= 6.4
0.25 w= 0.25

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

0.4 d= 0.4
1.28 m3
RB9
2/ 6.4 l= 6.4
0.25 w= 0.25
0.4 d= 0.4
1.28 m3

13.86 m3 GRAND TOTAL


d) In staircase and landing
2/ 0.081 STAIR-1 A= 0.081
1.2 w= 1.2
18 d= 18
3.50 m3
landing
2/ 1.2 l= 1.2
1 w= 1
0.25 d= 0.25
0.60 m3
3/ 0.073 STAIR-2 A= 0.073
1.4 w= 1.4
20 d= 20
6.13 m3
landing
3/ 1.2 l= 1.2
3 w= 3
0.2 d= 0.2
2.16 m3
beam
3/ 4.6 l= 4.6
0.25 w= 0.25
0.4 d= 0.4
1.38 m3
2/ 0.135 STAIR-3 A= 0.135
1.3 w= 1.3
20 d= 20
7.02 m3
20.79 m3 GRAND TOTAL
c) In 20cm thick suspended floor slab

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

1st floor
1/ 537.57 main block A= 537.57
1 w= 1
0.2 d= 0.2
107.51 m3
1/ 176.14 laboratory block A= 176.14
1 w= 1
0.2 d= 0.2
35.23 m3
ddt void
-1 / 4.15 l= 4.15
4.7 w= 4.7
0.2 d= 0.2
- 3.90 m3
ddt stair-1
-1 / 5.76 l= 5.76
1.2 w= 1.2
0.2 d= 0.2
- 1.38 m3
ddt stair-2
-1 / 3 l= 3
3.8 w= 3.8
0.2 d= 0.2
- 2.28 m3
2nd floor
1/ 523.83 main block A= 523.83
1 w= 1
0.2 d= 0.2
104.77 m3
1/ 180.32 laboratory block A= 180.32
1 w= 1
0.2 d= 0.2
36.06 m3
ddt stair-1
-1 / 5.76 l= 5.76
1.2 w= 1.2
0.2 d= 0.2
- 1.38 m3
ddt stair-2

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

-1 / 3 l= 3
3.8 w= 3.8
0.2 d= 0.2
- 2.28 m3
lower roof floor
1/ 546.1 main block A= 546.1
1 w= 1
0.2 d= 0.2
109.22 m3
roof floor
1/ 6.4 main block l= 6.4
15.4 w= 15.4
0.2 d= 0.2
19.71 m3
401.28 m3 GRAND TOTAL
FORMWORK
a) In elevation columns.
total column
40x40
53 / 3 l= 3
1.6 w= 1.6
1 d= 1
254.40 m2
25x30
8/ 3 l= 3
1.1 w= 1.1
1 d= 1
30x30
36 / 3 l= 3
1.2 w= 1.2
1 d= 1
129.60 m2
dia.40
13 / 3 l= 3
3.14 w= 3.14
0.4 d= 0.4
48.98 m2
432.98 m2 GRAND TOTAL
b) In floor beam.

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

B11
4/ 1.55 l= 1.55
0.85 w= 0.85
1 d= 1
5.27 m2
B13
2/ 2.6 l= 2.6
0.85 w= 0.85
1 d= 1
4.42 m2
B14
2/ 5.6 l= 5.6
0.85 w= 0.85
1 d= 1
9.52 m2
B14-1
1/ 11.73 l= 11.73
0.9 w= 0.9
1 d= 1
10.56 m2
B14-2
1/ 15.65 l= 15.65
0.9 w= 0.9
1 d= 1
14.09 m2
B14-3
1/ 7.97 l= 7.97
0.9 w= 0.9
1 d= 1
7.17 m2
B14-4
1/ 11.3 l= 11.3
0.9 w= 0.9
1 d= 1
10.17 m2
PB
1/ 12.1 l= 12.1
0.8 w= 0.8
1 d= 1

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

9.68 m2
PB
7/ 1.35 l= 1.35
0.8 w= 0.8
1 d= 1
7.56 m2
RB7
2/ 15.4 l= 15.4
0.9 w= 0.9
1 d= 1
27.72 m2
RB8
2/ 6.4 l= 6.4
0.9 w= 0.9
1 d= 1
11.52 m2
RB9
2/ 6.4 l= 6.4
0.5 w= 0.5
1 d= 1
6.40 m2

124.08 m2 GRAND TOTAL


c) In 20cm thick suspended floor slab
1st floor
1/ 537.57 main block bottom A= 537.57
1 w= 1
1 d= 1
537.57 m2
1/ 116.72 main block sides l= 116.72
0.2 w= 0.2
1 d= 1
23.34 m2
1/ 176.14 laboratory block bottom A= 176.14
1 w= 1
1 d= 1
176.14 m2
1/ 50.24 laboratory block sides 1= 50.24
0.2 w= 0.2

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

1 d= 1
10.05 m2
ddt void bottom
-1 / 4.15 l= 4.15
4.7 w= 4.7
1 d= 1
void sides
1/ 17.7 l= 17.7
0.2 w= 0.2
1 d= 1
- 19.51 m2
ddt stair-1 bottom
-1 / 5.76 l= 5.76
1.2 w= 1.2
1 d= 1
- 6.91 m2
stair-1 sides
1/ 13.92 l= 13.92
0.2 w= 0.2
1 d= 1
2.78 m2
ddt stair-2 bottom
-1 / 3 l= 3
3.8 w= 3.8
1 d= 1
- 11.40 m2
stair-2 sides
1/ 13.6 l= 13.6
0.2 w= 0.2
1 d= 1
2.72 m2
2nd floor
1/ 523.83 main block bottom A= 523.83
1 w= 1
1 d= 1
523.83 m2
1/ 120.15 main block sides A= 120.15
0.2 w= 0.2
1 d= 1

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

24.03 m2
1/ 180.32 laboratory block bottom A= 180.32
1 w= 1
1 d= 1
180.32 m2
1/ 52.82 laboratory block sides A= 52.82
0.2 w= 0.2
1 d= 1
10.56 m2
ddt stair-1 bottom
-1 / 5.76 l= 5.76
1.2 w= 1.2
1 d= 1
- 6.91 m2
stair-1 sidea
1/ 13.92 l= 13.92
0.2 w= 0.2
1 d= 1
2.78 m2
ddt stair-2 bottom
-1 / 3 l= 3
3.8 w= 3.8
1 d= 1
- 11.40 m2
stair-2 sides
1/ 13.6 l= 13.6
0.2 w= 0.2
1 d= 1
2.72 m2
lower roof floor
1/ 546.1 main block bottom A= 546.1
1 w= 1
1 d= 1
546.10 m2
1/ 115.72 main block sides 1= 115.72
0.2 w= 0.2
1 d= 1
23.14 m2
roof floor

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

1/ 6.4 main block bottom l= 6.4


15.4 w= 15.4
1 d= 1
98.56 m2
1/ 43.6 main block sides l= 43.6
1 w= 1
0.2 d= 0.2
8.72 m2

2,117.25 m2 GRAND TOTAL


d) In staircase and landing
2/ 0.417 STAIR-1 A= 0.417
1 w= 1
18 d= 18
15.01 m2
landing
2/ 1.2 l= 1.2
1 w= 1
1 d= 1
2.40 m2
2/ 4.4 l= 4.4
0.2 w= 0.2
1 d= 1
1.76 m2
3/ 0.538 STAIR-2 A= 0.538
1 w= 1
20 d= 20
32.28 m2
landing
3/ 1.2 l= 1.2
3 w= 3
1 d= 1
10.80 m2
3/ 8.4 l= 8.4
1 w= 1
0.2 d= 0.2
5.04 m2
beam

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

3/ 4.6 l= 4.6
0.85 w= 0.85
1 d= 1
11.73 m2
2/ 5.145 STAIR-3 A= 5.145
1 w= 1
20 d= 20
205.80 m2
284.82 m2 GRAND TOTAL

2.00 BLOCK WORK


20 cm thick
all floor
1/ 396.84 A= 396.84
1 w= 1
396.84 m2
1/ 429.94 A= 429.94
1 w= 1
429.94 m2
1/ 305.188 A= 305.188
1 w= 1
305.19 m2
1/ 116.36 A= 116.36
1 w= 1
116.36 m2
1,248.33 m2 GRAND TOTAL
15 cm thick
all floor
1/ 296.7 A= 296.7
1 w= 1
296.70 m2
1/ 157.32 A= 157.32
1 w= 1
157.32 m2
1/ 463.2 A= 463.2
1 w= 1

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

463.20 m2
917.22 m2 GRAND TOTAL
10 cm thick
all floor
1/ 4.1 1= 4.1
3 w= 3
12.30 m2
1/ 4.1 l= 4.1
3 w= 3
12.30 m2
24.60 m2 GRAND TOTAL
14
groind
32
30
140
10
25
9.6
9
9
12
17.7
33
17.2
9.6
23
22
25
mez
64.5
f floor
72
36
33.2
58.032
23
18
10

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

33.4
30
23
16
29
6
16
20
52.8
typ;ical.
104
44
38
38
34
46
52.8
22
10
34
38
26
24
40
66
66
29.76
34
12
22
16.8

1790.592
wall tiles
4/ 5.33 l= 5.33
1.8 w= 1.8
38.38 m2
2/ 7.1 l= 7.1
1.8 w= 1.8

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

25.56 m2
4/ 3.1 l= 3.1
1.8 w= 1.8
22.32 m2
4/ 7.1 l= 7.1
1.8 w= 1.8
51.12 m2
4/ 24.3 l= 24.3
1.8 w= 1.8
174.96 m2
2/ 24.3 l= 24.3
1.8 w= 1.8
87.48 m2
16 / 4.88 l= 4.88
1.8 w= 1.8
140.54 m2
8/ 5.9 l= 5.9
2.7 w= 2.7
127.44 m2
667.80

STEEL STRUCTURAL WORK


/ rhs 80x80x4 mm
bootom 20.77
vertical 2.2
diagonal 20
internal vertical 100
internal diagonal
total length of single truss 142.97
for 3 truss= 1143.76
1/ 1143.76 total length 1143.76
10.048 unit weight 10.048
11,492.50 kg
11,492.50 kg GRAND TOTAL
rhs 40x40x3 mm

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

diagonal 54
/ internal vertical 37.8
internal diagonal 46.8
total length of single truss 138.6
for 3 truss= 1108.8
1/ 1108.8 total length 1108.8
3.768 unit weight 3.768
4,177.96 kg
4,177.96 kg GRAND TOTAL
plate size 80x80x6mm(6 mm thick quality fillet weld)
Detail A &B 32
for 3 truss= 96
plate size 40x20x6mm (6 mm thick quality fillet weld)
Detail C 32
for 3 truss= 96
plate size 35x20x6mm (6 mm thick quality fillet weld)
Detail D 32
for 3 truss= 96
1/ plate size 35x12x6mm (6 mm thick quality fillet weld)
Detail F 64
for 3 truss= 192
triangular plate size 35x20x6mm (6 mm thick quality fillet weld)
Detail G 64
for 3 truss= 192
trapezoidal plate size 35x20x6mm (6 mm thick quality fillet weld)
Detail A &B 32
for 3 truss= 96
J-bolt
1/ Detail A &B 32
for 3 truss= 96
lattice purline
size 40x40x3 mm
l= 104.18
length of purline for 1 row 0
number of purline 14
1/ tottal length of single purline 1458.52
1/ 1458.52 total length 1458.52
3.768 unit weight 3.768
5,495.70 kg

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

size 40x40x3 mm
l= 8
length of purline for 1 row 56
number of purline 24
1/ tottal length of single purline 1344
1/ 1344 total length 1344
2.512 unit weight 2.512
3,376.13 kg
8,871.83 kg GRAND TOTAL
1/ angle iron
at connection of purline 12
number of truss 8
total number of plate 96
for 3 truss= 288
ф12 l=100 mmbolt
at connection of purline 12
1/ number of truss 8
total number of plate 96
2 bolt/plate 192
for 3 truss= 576

1/

1/

1/

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


steel reinforcement
project
client

drg dia length of mo. Of no.memb


location shape
no. (mm) bar dimension c/c bar mem er
MAIN BUILDING
ELEVATION COLUMN COLUMN
ground floor
C-1=12 pcs 16 3.922 12 12
C-2=4pcs 16 3.922 10 4
C-3=7pcs 16 3.922 12 7
C-4=1pcs 16 3.922 10 1
` C-5=2pcs 14 3.922 6 2
` C-6=2pcs 14 3.922 8 2
` C-7=2pcs 14 3.922 8 2
` C-8=3pcs 14 3.922 8 3
` C-9=2pcs 14 3.922 8 2
` C-10=1pcs 14 3.922 10 1
` C-11=1pcs 14 3.922 8 1
STIRRUP SEC 1-1 8 1.5 2.4 0.18 14 30
STIRRUP SEC 4-4 8 1 2.4 0.18 14 2
STIRRUP SEC 6-6 8 1.26 2.4 0.18 14 5

first floor
C-1=12 pcs 16 3.922 12 12
C-2=4pcs 16 3.922 10 4
C-3=7pcs 16 3.922 12 7
C-4=1pcs 16 3.922 10 1
` C-5=2pcs 14 3.922 6 2
` C-6=2pcs 14 3.922 8 2
` C-7=2pcs 14 3.922 8 2
` C-8=3pcs 14 3.922 8 3
` C-9=2pcs 14 3.922 8 2
` C-10=1pcs 14 3.922 10 1
` C-11=1pcs 14 3.922 8 1
STIRRUP SEC 1-1 8 1.5 2.4 0.18 14 30
STIRRUP SEC 4-4 8 1 2.4 0.18 14 2
STIRRUP SEC 6-6 8 1.26 2.4 0.18 14 5

ssecond floor
C-1=12 pcs 16 3.922 12 12
C-2=4pcs 16 3.922 10 4
C-3=7pcs 16 3.922 12 7
C-4=1pcs 16 3.922 10 1
STIRRUP SEC 1-1 8 1.5 2.4 0.18 14 30
STIRRUP SEC 4-4 8 1 2.4 0.18 14 2
STIRRUP SEC 6-6 8 1.26 2.4 0.18 14 5

Roof floor
C-3=7pcs 16 3.922 12 7
C-4=1pcs 16 3.922 10 1
STIRRUP SEC 1-1 8 1.5 2.4 0.18 14 30
STIRRUP SEC 4-4 8 1 2.4 0.18 14 2
STIRRUP SEC 6-6 8 1.26 2.4 0.18 14 5

FLOOR BEAMS
FB1 top 16 14 3 3
16 9.1 2 3
bot 16 14.1 5 3
st 8 1.2 7.6 0.1 77 3
FB2 top 16 15 3 3
16 9.85 2 3
bot 16 15 5 3
st 8 1.2 13.2 0.1 133 3
FB3 top 16 7.3 3 3
16 5.1 2 3
bot 16 7.3 5 3
st 8 1.2 6.2 0.1 63 3
FB4 top 14 8.6 3 3
bot 14 8.6 3 3
st 8 1.2 6.85 0.15 47 3
FB5 top 16 14.75 3 2
16 5.55 2 2
bot 16 7.45 5 2
bot 14 7.35 3 2
st 8 1.2 6.2 0.1 63 2
st 8 1.2 6.7 0.15 46 2
FB6 top 16 14 3 6
16 6.5 2 6
bot 16 8.85 5 6
bot 14 5.15 3 6
st 8 1.2 5.7 0.1 58 6
st 8 1.2 5.95 0.15 41 6
FB7 top 16 5.8 3 3
bot 16 5.8 3 3
8 1.2 4.7 0.15 32 3
FB8 top 16 5.3 3 3
bot 16 5.3 3 3
st 8 1.2 4.2 0.15 29 3
FB9 top 16 8.3 3 1
20 4.2 4 1
bot 16 8 3 1
bot 16 3.7 3 1
st 10 1.5 2.45 0.1 26 1
st 8 1.2 4.7 0.15 32 1
FB10 top 16 16.45 3 1
20 5.5 4 1
16 3.5 2 1
bottom 16 20.2 3 1
st 10 1.5 2.45 0.1 26 1
st 8 1.2 11.9 0.15 80 1
FB11 top 16 6.4 3 1
bottom 16 6.4 3 1
st 8 1.2 5.3 0.15 36 1
FB12 top 16 9.8 3 1
20 5.55 4 1
bottom 20 9.8 5 1
st 8 1.2 6.3 0.1 64 1
st 8 1.2 2.2 0.15 16 1
FB13 top 16 14 3 1
20 6.55 4 1
bottom 20 8.85 5 1
bottom 14 5.15 3 1
st 8 1.2 5.77 0.1 59 1
st 8 1.2 6 0.15 41 1

roof beam
RB1 top 12 14 3 1
bot 12 14 3 1
8 2.8 12 0.1 121 1
RB2 top 12 15 3 1
bot 12 15 3 1
8 2.8 0.9 0.1 10 1
8 1.2 12.4 0.15 84 1
RB3 top 12 7.3 3 1
bot 12 7.3 3 1
8 1.2 6.2 0.15 42 1
RB4 top 12 7.8 3 1
bot 12 7.8 3 1
8 2.8 1.4 0.1 15 1
8 1.2 5.2 0.15 36 1
RB5 top 12 9.8 3 1
bot 12 9.8 3 1
8 2.8 7.3 0.1 74 1
RB6 top 12 14 3 1
bot 12 14 3 1
8 1.2 11.8 0.15 80 1
RB7 top 12 5.8 3 1
bot 12 5.8 3 1
8 2.8 2 0.1 21 1
8 1.2 3 0.15 21 1
RB8 top 12 8.3 3 1
bot 12 8.3 3 1
8 2.8 4.47 0.1 46 1
8 1.2 2.8 0.15 20 1
RB9 top 16 14 3 1
bottom 16 14 3 1
st 8 2.8 12.8 0.1 129 1

FLOOR SLAB
1st floor slab
1 10 6.2 9.3 0.15 63 1
2 10 7.8 3.1 0.15 22 1
3 10 4.2 2.4 0.15 17 1
4 10 9.1 6.4 0.15 44 1
5 10 9 5.3 0.15 36 1
6 10 8.3 4.3 0.15 30 1
7 10 11.8 3 0.15 21 1
8 10 11.2 3.85 0.15 27 1
9 12 3 1 0.15 8 1
10 12 4.2 7.5 0.15 51 1
11 12 3.5 6.4 0.15 44 1
12 12 2.5 2.4 0.15 17 1
13 12 2.7 2.4 0.15 17 1
14 12 2.7 6.4 0.15 44 1
15 10 6.9 1 0.15 8 1
16 10 8.8 4.1 0.15 28 1
17 10 5.7 4.87 0.15 33 1
18 12 2 5.87 0.15 40 1
2nd floor slab
1 10 6.2 9.3 0.15 63 1
2 10 7.8 3.1 0.15 22 1
3 10 10.6 3.45 0.15 24 1
4 10 9.1 5.4 0.15 37 1
5 10 9 4.87 0.15 33 1
6 10 8.3 4.3 0.15 30 1
7 10 11.8 3 0.15 21 1
8 10 9.4 1 0.15 8 1
9 12 3 4.87 0.15 33 1
10 12 4.2 7.5 0.15 51 1
11 12 3.5 6.4 0.15 44 1
12 12 2.5 2.4 0.15 17 1
13 12 2.7 2.4 0.15 17 1
14 12 2.7 6.4 0.15 44 1
15 10 6.9 4.87 0.15 33 1
16 10 9.8 3.2 0.15 22 1
17 10 4.7 2.3 0.15 16 1
18 12 2 10.37 0.15 70 1
19 12 1.8 2.2 0.15 16 2
20 12 4.2 4.7 0.15 32 1
3rd floor slab
1 10 6.2 9.3 0.15 63 1
2 10 7.8 3.1 0.15 22 1
3 10 12 1.9 0.15 14 1
4 10 9.1 8.9 0.15 60 1
5 10 9 7.07 0.15 48 1
6 10 8.3 4.3 0.15 30 1
7 10 11.8 3 0.15 21 1
8 10 4.5 2.85 0.15 20 1
9 12 3 4.87 0.15 33 1
10 12 4.2 7.5 0.15 51 1
11 12 3.5 6.4 0.15 44 1
12 12 2.5 2.4 0.15 17 1
13 12 2.7 2.4 0.15 17 1
14 12 2.7 6.4 0.15 44 1
15 10 5.5 3 0.15 21 1
16 12 4 3 0.15 21 1

stair case
1st flight 12 5.7 1.4 0.15 10 3
10 2.35 1.4 0.15 10 3
10 2 1.4 0.15 10 3
10 1.4 1.4 0.15 10 3
8 0.8 1.4 0.2 8 30
8 1.75 3.2 0.2 17 3
8 1.75 10 3
2nd flight 12 6.6 1.4 0.15 10 3
10 2.55 1.4 0.15 10 3
10 2 1.4 0.15 10 3
10 1.75 1.4 0.15 10 3
8 0.8 1.4 0.2 8 30
8 1.75 3.2 0.2 17 3
8 1.75 10 3
STB1 top 16 3.9 3 3
bot 16 3.9 3 3
8 1.2 2.7 0.1 28 1
TOTAL LENGTH
UNIT WEIGHT
TOTAL WEIGHT
TOTAL WEIGHT WITH 5%
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
total no. total length in meters for each dia.
Bars 6 8 10 12 14 16 20 24

144 564.768
40 156.88
84 329.448
10 39.22
12 47.064
16 62.752
16 62.752
24 94.128
16 62.752
10 39.22
8 31.376
420 630
28 28
70 88.2

144 564.768
40 156.88
84 329.448
10 39.22
12 47.064
16 62.752
16 62.752
24 94.128
16 62.752
10 39.22
8 31.376
420 630
28 28
70 88.2

144 564.768
40 156.88
84 329.448
10 39.22
420 630
28 28
70 88.2

84 329.448
10 39.22
420 630
28 28
70 88.2
0
0
9 126
6 54.6
15 211.5
231 277.2
9 135
6 59.1
15 225
399 478.8
9 65.7
6 30.6
15 109.5
189 226.8
9 77.4
9 77.4
141 169.2
6 88.5
4 22.2
10 74.5
6 44.1
126 151.2
92 110.4
18 252
12 78
30 265.5
18 92.7
348 417.6
246 295.2
9 52.2
9 52.2
96 115.2
9 47.7
9 47.7
87 104.4
3 24.9
4 16.8
3 24
3 11.1
26 39
32 38.4
3 49.35
4 22
2 7
3 60.6
26 39
80 96
3 19.2
3 19.2
36 43.2
3 29.4
4 22.2
5 49
64 76.8
16 19.2
3 42
4 26.2
5 44.25
3 15.45
59 70.8
41 49.2

3 42
3 42
121 338.8
3 45
3 45
10 28
84 100.8
3 21.9
3 21.9
42 50.4
3 23.4
3 23.4
15 42
36 43.2
3 29.4
3 29.4
74 207.2
3 42
3 42
80 96
3 17.4
3 17.4
21 58.8
21 25.2
3 24.9
3 24.9
46 128.8
20 24
3 42
3 42
129 361.2

63 390.6
22 171.6
17 71.4
44 400.4
36 324
30 249
21 247.8
27 302.4
8 24
51 214.2
44 154
17 42.5
17 45.9
44 118.8
8 55.2
28 246.4
33 188.1
40 80

63 390.6
22 171.6
24 254.4
37 336.7
33 297
30 249
21 247.8
8 75.2
33 99
51 214.2
44 154
17 42.5
17 45.9
44 118.8
33 227.7
22 215.6
16 75.2
70 140
32 57.6
32 134.4

63 390.6
22 171.6
14 168
60 546
48 432
30 249
21 247.8
20 90
33 99
51 214.2
44 154
17 42.5
17 45.9
44 118.8
21 115.5
21 84

30 171
30 70.5
30 60
30 42
240 192
51 89.25
30 52.5
30 198
30 76.5
30 60
30 52.5
240 192
51 89.25
30 52.5
9 35.1
9 35.1
28 33.6
0 7929.9 8037.7 3305.2 1107.14 6078.066 180.45 0
0.222 0.395 0.617 0.888 1.209 1.58 2.467 3.55392
0 3132.3105 4959.2609 2935.0176 1338.53 9603.34428 445.17015 0
WEIGHT WITH 5% 0 3445.5416 5455.18699 3228.51936 1472.38 10563.6787 489.687165 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
#REF!
TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

A.SUB STRUCTURE
1.0 EARTH WORK
MAIN HOUSE
1.1 site clearing
1/ 506.67 MAIN BLOCK 1 506.55
1 w= 1
506.67 m2
1/ 180.4 LABORATORY BLOCK 1 180.4
1 w= 1
180.40 m2
1/ 214.94 SITE l= 214.98
1 w= 1
214.94 m2
902.01 m2 GRAND TOTAL
1.2 bulk excavation to depth 150 cm
1/ 686.95 l= 686.95
1 w= 1
1.5 d= 1.5
1,030.43 m3
1,030.43 m3 GRAND TOTAL
1.3 bulk excavation to depth 320 cm
1/ 686.95 l= 686.95
1 w= 1
0 d= 0
- m3
- m3 GRAND TOTAL
1.4 pit excavation not exceeding 150 cm
F1=300x300x65=7 pcs
7/ 3.5 l= 3.5
3.5 w= 3.5
1.35 d= 1.35
115.76 m3
F2=260x260x50=2 pcs
2/ 3.1 l= 3.1
3.1 w= 3.1
1.35 d= 1.35
25.95 m3
F3=240x240x40=17 pcs
17 / 2.9 l= 2.9
2.9 w= 2.9
1.35 d= 1.35
193.01 m3
F4=200x200x40=5 pcs
5/ 2.5 l= 2.5
2.5 w= 2.5
1.35 d= 1.35

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

42.19 m3
F5=100x100x30=2 pcs
2/ 1.5 l= 1.5
1.5 w= 1.5
1.35 d= 1.35
F6=160x160x30=4 pcs
4/ 2.1 l= 2.1
2.1 w= 2.1
1.35 d= 1.35
23.81 m3
400.72 m3 GRAND TOTAL
1.5 dito but not exceeding 300 cm
F1=300x300x65=7 pcs
7/ 3.5 l= 3.5
3.5 w= 3.5
0 d= 0
- m3
F2=260x260x50=2 pcs
2/ 3.1 l= 3.1
3.1 w= 3.1
0 d= 0
- m3
F3=240x240x40=17 pcs
17 / 2.9 l= 2.9
2.9 w= 2.9
0 d= 0
- m3
F4=200x200x40=5 pcs
5/ 2.5 l= 2.5
2.5 w= 2.5
0 d= 0
- m3
F5=100x100x30=2 pcs
2/ 1.5 l= 1.5
1.5 w= 1.5
0 d= 0
F6=160x160x30=4 pcs
4/ 2.1 l= 2.1
2.1 w= 2.1
0 d= 0
- m3
- m3 GRAND TOTAL
1.6 Trench excavation
MAIN BLOCK
1/ 113.04 l= 113.04
0.25 w= 0.25
1.5 d= 1.5
42.39 m3
LABORATORY BLOCK
1/ 58.2 l= 58.2

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

0.25 w= 0.25
1.5 d= 1.5
21.83 m3
64.22 m3 GRAND TOTAL
1.7 Back fill under foundation
volume of pit and trench
64.22 m3
400.72 m3
464.94 m3
ddt volume of footing
F1=300x300x65=7 pcs
-7 / 3 l= 3
3 w= 3
0.65 d= 0.65
- 40.95 m3
F2=260x260x50=2 pcs
-2 / 2.6 l= 2.6
2.6 w= 2.6
0.5 d= 0.5
- 6.76 m3
F3=240x240x40=17 pcs
-17 / 2.4 l= 2.4
2.4 w= 2.4
0.4 d= 0.4
- 39.17 m3
F4=200x200x40=5 pcs
-5 / 2 l= 2
2 w= 2
0.4 d= 0.4
- 8.00 m3
F5=100x100x30=2 pcs
-2 / 1 l= 1
1 w= 1
0.3 d= 0.3
- 0.60 m3
F6=160x160x30=4 pcs
-4 / 1.6 l= 1.6
1.6 w= 1.6
0.3 d= 0.3
- 3.07 m3
ddt foundation column
section=40x40
33 / -0.65 l= -0.65
0.4 w= 0.4
0.4 d= 0.4
- 3.43 m3
ddt foundation column
section=30x25
2/ -1 l= -1
0.3 w= 0.3

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

0.25 d= 0.25
- 0.15 m3
ddt volume of stone masonary main block
1/ 109.76 l= 109.76
0.5 w= 0.5
-1 d= -1
- 54.88 m3
ddt volume of stone masonary laboratory
1/ 55.38 l= 55.38
0.5 w= 0.5
-1 d= -1
- 27.69 m3
280.23 m3 GRAND TOTAL
1.8 ditto but for under hard core
1/ 180.4 volume of bulk 1= 180.4
1 LAB. BLOCK w= 1
1.15 d= 1.15
207.46 m3
1/ 506.55 MAIN BLOCK 1= 506.55
1 w= 1
1.15 d= 1.15
582.53 m3
789.99 m3 GRAND TOTAL
1.10 25 cm thick hard core
1/ 437.05 MAIN BLOCK 1= 437.05
1 w= 1
437.05 m2
1/ 151.04 l= 151.04
1 LAB. BLOCK w= 1
151.04 m2
588.09 m2 GRAND TOTAL
2.0 COCNCRETE WORK
a) lean concrete under footing
F1=300x300x65=7 pcs
7/ 3.05 l= 3.05
3.05 w= 3.05
1 d= 1
65.12 m2
F2=260x260x50=2 pcs
2/ 2.65 l= 2.65
2.65 w= 2.65
1 d= 1
14.05 m2
F3=240x240x40=17 pcs
17 / 2.45 l= 2.45
2.45 w= 2.45
1 d= 1
102.04 m2
F4=200x200x40=5 pcs
5/ 2.05 l= 2.05

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

2.05 w= 2.05
1 d= 1
21.01 m2
F5=100x100x30=2 pcs
2/ 1.05 l= 1.05
1.05 w= 1.05
1 d= 1
2.21 m2
F6=160x160x30=4 pcs
4/ 1.65 l= 1.65
1.65 w= 1.65
1 d= 1
10.89 m2
215.31 m2 GRAND TOTAL
b) grade beam
GB1
2/ 34.9 l= 34.9
0.25 w= 0.25
1 d= 1
17.45 m2
GB1'
1/ 33.95 l= 33.95
0.25 w= 0.25
1 d= 1
8.49 m2
GB2
8/ 11.2 l= 11.2
0.25 w= 0.25
1 d= 1
22.40 m2
GB3
1/ 74.02 l= 74.02
0.25 w= 0.25
1 d= 1
18.51 m2
GB4
2/ 11.2 l= 11.2
0.25 w= 0.25
1 d= 1
5.60 m2
GB5
1/ 14.53 l= 14.53
0.25 w= 0.25
1 d= 1
3.63 m2
GB6
1/ 5.6 l= 5.6
0.25 w= 0.25
1 d= 1
1.40 m2

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

GB7
2/ 13.8 l= 13.8
0.25 w= 0.25
1 d= 1
6.90 m2
GB8
1/ 5.6 l= 5.6
0.25 w= 0.25
1 d= 1
1.40 m2
85.78 m2 GRAND TOTAL
c) Under masonry wall
main block
1/ 109.76 l= 109.76
0.5 w= 0.5
1 d= 1
54.88 m2
laboratory block
1/ 72.42 l= 72.42
0.5 w= 0.5
1 d= 1
36.21 m2
91.09 m2 GRAND TOTAL
d) Under ground floor slab
main block
1/ 437.05 A= 437.05
1 d= 1
437.05 m2
laboratory block
1/ 151.04 A= 151.04
1 d= 1
151.04 m2
588.09 m2 GRAND TOTAL
2.02 C-25 concrete for
footing
F1=300x300x65=7 pcs
7/ 3 l= 3
3 w= 3
0.65 d= 0.65
40.95 m3
F2=260x260x50=2 pcs
2/ 2.6 l= 2.6
2.6 w= 2.6
0.5 d= 0.5
6.76 m3
F3=240x240x40=17 pcs
17 / 2.4 l= 2.4
2.4 w= 2.4
0.4 d= 0.4

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

39.17 m3
F4=200x200x40=5 pcs
5/ 2 l= 2
2 w= 2
0.4 d= 0.4
8.00 m3
F5=100x100x30=2 pcs
2/ 1 l= 1
1 w= 1
0.3 d= 0.3
0.60 m3
F6=160x160x30=4 pcs
4/ 1.6 l= 1.6
1.6 w= 1.6
0.3 d= 0.3
3.07 m3
98.55 m3 GRAND TOTAL
b) foundation column

foundation column on F1=40x40x215=7 pcs


7/ 0.4 l= 0.4
0.4 w= 0.4
2.15 d= 2.15
2.41 m3
foundation column on F2=40x40x230=2 pcs
2/ 0.4 l= 0.4
0.4 w= 0.4
2.3 d= 2.3
0.74 m3
foundation column on F3=40x40x240=17 pcs
17 / 0.4 l= 0.4
0.4 w= 0.4
2.4 d= 2.4
6.53 m3
foundation column on F4=40x40x240=5 pcs
5/ 0.4 l= 0.4
0.4 w= 0.4
2.4 d= 2.4
1.92 m3
foundation column on F5=30x25x250=2 pcs
2/ 0.3 l= 0.3
0.25 w= 0.25
2.5 d= 2.5
0.38 m3
foundation column on F6=40x40x250=4 pcs
4/ 0.4 l= 0.4
0.4 w= 0.4
2.5 d= 2.5
1.60 m3
13.57 m3 GRAND TOTAL

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

c) In grade beam
GB1
2/ 34.9 l= 34.9
0.25 w= 0.25
0.4 d= 0.4
6.98 m3
GB1'
1/ 33.95 l= 33.95
0.25 w= 0.25
0.4 d= 0.4
3.40 m3
GB2
8/ 11.2 l= 11.2
0.25 w= 0.25
0.4 d= 0.4
8.96 m3
GB3
1/ 74.02 l= 74.02
0.25 w= 0.25
0.4 d= 0.4
7.40 m3
GB4
2/ 11.2 l= 11.2
0.25 w= 0.25
0.4 d= 0.4
2.24 m3
GB5
1/ 14.53 l= 14.53
0.25 w= 0.25
0.4 d= 0.4
1.45 m3
GB6
1/ 5.6 l= 5.6
0.25 w= 0.25
0.4 d= 0.4
0.56 m3
GB7
2/ 13.8 l= 13.8
0.25 w= 0.25
0.4 d= 0.4
2.76 m3
GB8

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

1/ 5.6 l= 5.6
0.25 w= 0.25
0.4 d= 0.4
0.56 m3

34.31 m3 GRAND TOTAL


d) In 10cm thick ground floor slab
main block
1/ 437.05 A= 437.05
1 d= 1
437.05 m2
laboratory block
1/ 151.04 A= 151.04
1 d= 1
151.04 m2
588.09 m2 GRAND TOTAL

FORMWORK
a) In footing pad
F1=300x300x65=7 pcs
7/ 3 l= 3
4 w= 4
0.65 d= 0.65
54.60 m2
F2=260x260x50=2 pcs
2/ 2.6 l= 2.6
4 w= 4
0.5 d= 0.5
10.40 m2
F3=240x240x40=17 pcs
17 / 2.4 l= 2.4
4 w= 4
0.4 d= 0.4
65.28 m2
F4=200x200x40=5 pcs
5/ 2 l= 2
4 w= 4
0.4 d= 0.4
16.00 m2
F5=100x100x30=2 pcs
2/ 1 l= 1
4 w= 4
0.3 d= 0.3
2.40 m2
F6=160x160x30=4 pcs
4/ 1.6 l= 1.6
4 w= 4

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

0.3 d= 0.3
7.68 m2
156.36 m2 GRAND TOTAL
b) foundation column

foundation column on F1=40x40x215=7 pcs


7/ 0.4 l= 0.4
4 w= 4
2.15 d= 2.15
24.08 m2
foundation column on F2=40x40x230=2 pcs
2/ 0.4 l= 0.4
4 w= 4
2.3 d= 2.3
7.36 m2
foundation column on F3=40x40x240=17 pcs
17 / 0.4 l= 0.4
4 w= 4
2.4 d= 2.4
65.28 m2
foundation column on F4=40x40x240=5 pcs
5/ 0.4 l= 0.4
4 w= 4
2.4 d= 2.4
19.20 m2
foundation column on F5=30x25x250=2 pcs
2/ 0.55 l= 0.55
2 w= 2
2.5 d= 2.5
5.50 m2
foundation column on F6=40x40x250=4 pcs
4/ 0.4 l= 0.4
4 w= 4
2.5 d= 2.5
16.00 m2
137.42 m2 GRAND TOTAL
c) In grade beam
GB1
2/ 35.05 l= 35.05
1 w= 1
0.8 d= 0.8
56.08 m2
GB1'
1/ 33.95 l= 33.95
1 w= 1
0.8 d= 0.8
27.16 m2

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

GB2
8/ 11.2 l= 11.2
1 w= 1
0.8 d= 0.8
71.68 m2
GB3
1/ 74.02 l= 74.02
1 w= 1
0.8 d= 0.8
59.22 m2
GB4
2/ 11.2 l= 11.2
1 w= 1
0.8 d= 0.8
17.92 m2
GB5
1/ 14.53 l= 14.53
1 w= 1
0.8 d= 0.8
11.62 m2
GB6
1/ 5.6 l= 5.6
1 w= 1
0.8 d= 0.8
4.48 m2
GB7
2/ 13.8 l= 13.8
1 w= 1
0.8 d= 0.8
22.08 m2
GB8
1/ 5.6 l= 5.6
1 w= 1
0.8 d= 0.8
4.48 m2

274.72 m2 GRAND TOTAL

3.0 masonary wall


1/ 113.04 l= 113.04
0.5 w= 0.5
1 d= 1

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

56.52 m3
1/ 58.2 l= 58.2
0.5 w= 0.5
1 d= 1
29.10 m3
85.62 m3 GRAND TOTAL

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


steel reinforcement
project
client

drg dia length of no. Of bar


location shape
no. (mm) bar dimension c/c mem
MAIN BUILDING
FOOTING
F1=300x300x65=7 pcs 16 4 2.9 0.15 40
F2=260x260x50=2 pcs 16 3.3 2.5 0.16 34
F3=240x240x40=17 pcs 14 2.9 2.3 0.14 34
F4=200x200x40=5 pcs 14 2.5 1.9 0.18 24
F5=100x100x30=2 pcs 12 1.3 0.9 0.2 12
F6=160x160x30=4 pcs 12 1.9 1.5 0.15 22

FOUNDATION COLUMN
C-1=12 pcs 16 3.922 12
C-2=4pcs 16 3.922 10
C-3=7pcs 16 3.922 12
C-4=1pcs 16 3.922 10
` C-5=2pcs 14 3.922 6
` C-6=2pcs 14 3.922 8
` C-7=2pcs 14 3.922 8
` C-8=3pcs 14 3.922 8
` C-9=2pcs 14 3.922 8
` C-10=1pcs 14 3.922 10
` C-11=1pcs 14 3.922 8
STIRRUP SEC 1-1 8 1.5 2.4 0.18 14
STIRRUP SEC 4-4 8 1 2.4 0.18 14
STIRRUP SEC 6-6 8 1.26 2.4 0.18 14

grade beams
GB1 top 14 41.29 2
14 25.02 1
bot 12 40.85 2
8 1.2 38.2 0.18 213
GB1' top 14 39.79 2
14 22.62 1
bot 12 39.39 2
8 1.2 37.1 0.18 207
GB2 top 14 13.84 2
14 6.35 2
bot 12 13.24 2
8 1.2 12.35 0.18 70
GB3 top 12 75.25 3
bot 12 75.25 2
8 1.2 74.02 0.18 412
GB4 top 14 13.84 2
14 6.35 2
bot 12 13.24 2
8 1.2 12.35 0.18 70
GB5 top 14 15.9 2
14 6.35 2
bot 12 15.2 2
8 1.2 14.5 0.18 82
GB6 top 14 7.04 2
bot 12 6.34 2
8 1 6.34 0.18 36
GB7 top 14 20.08 2
14 9.35 1
bot 12 19.92 2
8 1.2 18.35 0.18 103
GB8 top 14 6.92 2
14 6.35 1
bot 12 6.57 2
8 1.2 6.35 0.18 36
10cm thick ground floor slab
1 8 5.83 4.75 0.25 20
1 8 4.75 5.83 0.25 24
1 8 1 16.38 0.25 67
1 8 16.38 1 0.25 5
1 8 5.83 1.38 0.25 7
1 8 1.38 5.83 0.25 24
1 8 0.95 4.75 0.25 20
1 8 4.75 0.95 0.25 5
1 8 1.78 4.75 0.25 20
1 8 4.75 1.78 0.25 8
1 8 5.83 1.55 0.25 7
1 8 1.55 5.83 0.25 24
1 8 5.83 1.15 0.25 6
1 8 1.15 5.83 0.25 24
1 8 5.83 5.78 0.25 24
1 8 5.78 5.83 0.25 24
1 8 4.99 5.83 0.25 24
1 8 4.99 5.83 0.25 24
1 8 2.83 5.78 0.25 24
1 8 5.78 2.83 0.25 12
1 8 1.25 6.11 0.25 25
1 8 6.11 1.25 0.25 6

TOTAL LENGTH
UNIT WEIGHT
TOTAL WEIGHT
TOTAL WEIGHT WITH 5%
no.memb total no. total length in meters for each dia.
er Bars 6 8 10 12 14 16 20

0
7 280 1120
2 68 224.4
17 578 1676.2
5 120 300
2 24 31.2
4 88 167.2

0
12 144 564.768
4 40 156.88
7 84 329.448
1 10 39.22
2 12 47.064
2 16 62.752
2 16 62.752
3 24 94.128
2 16 62.752
1 10 39.22
1 8 31.376
30 420 630
2 28 28
5 70 88.2

2 4 165.16
2 2 50.04
2 4 163.4
2 426 511.2
1 2 79.58
1 1 22.62
1 2 78.78
1 207 248.4
8 16 221.44
8 16 101.6
8 16 211.84
8 560 672
1 3 225.75
1 2 150.5
1 412 494.4
2 4 55.36
2 4 25.4
2 4 52.96
2 140 168
1 2 31.8
1 2 12.7
1 2 30.4
1 82 98.4
1 2 14.08
1 2 12.68
1 36 36
2 4 80.32
2 2 18.7
2 4 79.68
2 206 247.2
1 2 13.84
1 1 6.35
1 2 13.14
1 36 43.2

14 280 1632.4
14 336 1596
1 67 67
1 5 81.9
1 7 40.81
1 24 33.12
1 20 19
1 5 23.75
1 20 35.6
1 8 38
1 7 40.81
1 24 37.2
1 6 34.98
1 24 27.6
3 72 419.76
3 72 416.16
1 24 119.76
1 24 119.76
1 24 67.92
1 12 69.36
1 25 31.25
1 6 36.66

TOTAL LENGTH 8253.8 0 1217.53 3275.23 2434.716 0


UNIT WEIGHT 0.395 0.617 0.888 1.209 1.58 2.467
TOTAL WEIGHT 3260.251 0 1081.16664 3959.76 3846.85128 0
TOTAL WEIGHT WITH 5% 3260.251 0 1081.16664 3959.76 3846.85128 0
0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
#REF!
24

8.20
0 0
3.55392
0
0

Вам также может понравиться