GIAI ĐOẠN/ STAGE:

THIẾT KẾ CHI TIẾT / DETAIL DESIGN

GHI CHÚ/ NOTE


A A

LAYOUT OF WASTE WATER TREATMENT PLANT


SCALE: 1/200

LEGEND:

T01 : PUMP PIT (STAGE 1&2)


T02A : EQUALIZATION TANK (STAGE 1)
T02B : EQUALIZATION TANK (STAGE 2)
B INTERNAL ROAD B
T03A : COAGULATION TANK (STAGE 1)
T03B : FLOCCULATION TANK (STAGE 1)
T04A : DAF (STAGE 1)
T05-D
T05A : UASB TANK (STAGE 1)
T05B : TRANSFER TANK (STAGE 1)
T05C : UASB TANK (STAGE 2)
T05B : TRANSFER TANK (STAGE 2)
T06A : ANOXIC TANK 1 (STAGE 1)
T06B : ANOXIC TANK 1 (STAGE 2) T08-B
T07A : AEROTANK TANK (STAGE 1) T02-B T05-C
T07B : AEROTANK TANK (STAGE 2)
T08A : ANOXIC TANK 1 (STAGE 1)
C C
T08B : ANOXIC TANK 1 (STAGE 2)
T06-B T07-B
T09A : BIO-CLARIFIER (STAGE 1)
T09B : BIO-SLUDGE COLLECTION TANK (STAGE 1)
T09C : BIO-CLARIFIER (STAGE 2)
T09D : BIO-SLUDGE COLLECTION TANK (STAGE 2)
T10A : COAGULATION TANK (STAGE 1) H04
T10B : FLOCCULATION TANK 1 (STAGE 1)
T10C : FLOCCULATION TANK 2 (STAGE 1)
T10D : COAGULATION TANK (STAGE 2) H03 SH01
T10E : FLOCCULATION TANK 1 (STAGE 2) PIPING DISTRIBUTION
T10F : FLOCCULATION TANK 2 (STAGE 2)
D
T11A : CHEMICAL CLARIFIER (STAGE 1)
H1, H2, H3: H02
FLARE BIOGAS: 3 WEEKS T07-A D
T11B : CHEMICAL CLARIFIER (STAGE 2)
T12 : DISINFECTION TANK (STAGE 1&2)
T13 : SLUDGE THICKENER (STAGE 1&2) CONTROL ROOM: 2 WEEKS T06-A BLOWER, PIPING
H01 : CONTROL ROOM (STAGE 1&2)
DIFFUSER: 3 WEEKSMIXER: 1WEEKS

-0.50
H02 : LAB ROOM (STAGE 1&2)
Lưu ý: Khi thi công xong sàn của

DN250,uPVC,BOP
H03 : STAFF ROOM (STAGE 1&2)phòng điện, cần thông báo để T08-A
H04 : AIR BLOWER ROOM (STAGE đưa
1&2)tủ điện vào.
H05 : SLUDGE TREATED HOUSE (STAGE 1&2) PUMP,T02-A MIXER: 1 WEEK
H06 : CHEMICAL HOUSE (STAGE 1&2) H01 T05-A
H07 : WARE HOUSE (STAGE 1&2) DAF EQUIPMENT 3 WEEKL
MH01/..../06 : MANHOLE FOR WASTEWATER
T05-B
E DRAINAGE E
SH01/..../16 : MANHOLE FOR RAINWATER NGÀY/ DATE NGÀY/ DATE
DRAINAGE
DUYỆT BỞI/ APPROVED BY DUYỆT BỞI/ APPROVED BY
RC CULVERT D800
NOTE: BOP-4.50 Leaking testing? (Done/Not yet) MEDAI G.B. Enterprise Co., Ltd. UNICO VINA JSC
- LEVEL ±0.0 OF WWTP = CENTER LINE OF INTERNAL ROAD Coating composite? (Done/Not yet) T12
INFLUENT
WASTE WATER T01 SH02
PUMPIT: 1 WEEK T09-A T09-C
MH05 T11-C T11-A
EFFLUENT
WASTE WATER DN600,SS304,BOP-1.20 MH06
Leaking testing?
Leaking testing?

-0.50
EFFLUENT PIT (Done/Not yet)
(Done/Not yet)

DN250,uPVC,BOP
F INTERNAL ROAD F

3 WEEKS
SH16 BẢNVẼTHẾ ITKẾKẾ INTRÚC
02 18/06/18 N.V.D
MH01 SH03 Acrhe
ticu
ta
rdlesginda
rwnigs
THE MANHOLE WILL BE CONNECTED WITH BẢNVẼTHẾ ITKẾKẾ INTRÚC
H05 01 30/03/18 N.V.D
DN400,uPVC,BOP-1.20

Acrhe
ticu
ta
rdlesginda
rwnigs
RAINWATER DRAINAGE OF THE FACTORY
MH04 MH03 MH02 SH06 DN300,uPVC,BOP-0.70 DN250,uPVC,BOP-0.50
SH04 C,BO
P-0.5
0
BẢNVẼTHẾ ITKẾKẾ INTRÚC
0,uPV 00 06/01/18 N.V.D
SH07 DN25 Acrhe
ticu
ta
rdlesginda
rwnigs
T13 T10-C T10-B T10-A DN300,uPVC,BOP-0.70

DN300,uPVC,BOP-0.70
SH05 REV DATE/ NGÀY MÔ TẢ THIẾT KẾ KIỂM DUYỆT
SỐ DD/MM/YY DESCRIPTION DESIGNED CHECKED APPROVED
Leaking testing? (Done/Not yet) Leaking testing? (Done/Not yet) INTERNAL ROAD CHỦ ĐẦU TƯ/ CLIENT:
T10-F T10-E T10-D
G
CHEMMITCAL,
SH15 SH08
MEDAI G.B. Enterprise Co., Ltd.
G

ELECTRIC: 2 WEEKS
DN300,uPVC,BOP-0.70

NHÀ THẦU/ CONTRACTOR:


DN400,uPVC,BOP-1.20

Lưu ý: Khi thi công xong sàn của H06


CABLE, ELECTRIC: 3 WEEKS UNICO VINA JSC
máy ép bùn, cần thông báo để H07
đưa máy ép vào. SH09 DỰ ÁN/ PROJECT:
RH12
Trọng lượng của máy ép bùn: 2 Tấn WASTEWATER TREATMENT PLANT
DN300,uPVC,BOP-1.20 DN300,uPVC,BOP-0.80 DN300,uPVC,BOP-0.80 DN300,uPVC,BOP-0.70
SH14 SH13 SH11 SH10 TÊN BẢN VẼ/ DWG. TITLE:
INTERNAL ROAD
H H
LAYOUT OF WWTP
SỐ DỰ ÁN SỐ BẢN VẼ TỈ LỆ SỐ TỜ
SUB
ORDER No. DRAWING NUMBER SCALE SHEET

00
AD-01

A1-841x594 1 2 3 4 5 6 7 8 9