ITEM: MAMPOSTERIA

I. EQUIPO
DESCRIPCION UNIDAD TARIFA DIA RENDIMIENTO
Herramienta menor % 7315 5
Andamios % 3,500 5

2. MATERIALES EN OBRA
DESCRIPCION UNIDAD PRECIO UNITARIO CANTIDAD
Bloque No.4 Santafe und 917 13.27
Mortero de pega 1:4 M3 2,423 0.2

DESPERDICIO % 12,654 5%

3. TRANSPORTE
DESCRIPCION UNIDAD DISTANCIA PRECIO VIAJE
CAMIONETA LUV M3-KM-M2 KM $ 40,000.00

4. MANO DE OBRA
TRABAJADOR VALOR M2 RENDIMIENTO M2 VALOR M2
OFICIAL 50000 18.00 2777.77777777778
AYUDANTE 35000 7 5000
UNIDAD: M2

VALOR UNITARIO COSTO TOTAL


366
175

SUB - TOTAL 541

VALOR UNITARIO COSTO TOTAL


12,169
485

633
SUB-TOTAL 13,287

VALOR UNITARIO COSTO TOTAL


5,000.00

SUB-TOTAL 5,000

VALOR UNITARIO COSTO TOTAL


2,777.78
5000

SUB-TOTAL 7,778

TOTAL 26,605
ITEM: PAÑETE MORTERO 1:5

I. EQUIPO
DESCRIPCION UNIDAD TARIFA DIA RENDIMIENTO
Herramienta menor % 7315 5
Andamios % 3,500 5

ll. MATERIALES EN OBRA


DESCRIPCION UNIDAD CANTIDAD VALOR UNITARIO
Mortero 1:5
Agua lt 4.8 58
Cemento kg 6.34 1141
Arena m3 0.03 929
mano de obra ayudante 0.46 5003
SUB - TOTAL

lll. TRANSPORTE
DESCRIPCION UNIDAD DISTANCIA PRECIO VIAJE
CAMIONETA M2

IV. MANO DE OBRA


TRABAJADOR VALOR M2 RENDIMIENTO M2 VALOR M2
OFICIAL 50000 25 2000
AYUDANTE 40000 18 2222.22222222222

TOTAL
UNIDAD: M2

VALOR UNITARIO COSTO TOTAL


366
175

SUB - TOTAL 541

COSTO TOTAL

7,131

VALOR UNITARIO COSTO TOTAL


5,000.00

SUB-TOTAL 5,000

VALOR UNITARIO COSTO TOTAL

4222.22222222222
SUB-TOTAL 4,222

16,894
MUROS DORMITORIO PRINCIPAL
DESCRIPCION

M26
M27
M28
M29
M30 - MURO BAJO
M31
M32

MUROS BAÑO PRIVADO

DESCRIPCION

M33
M34
M34 -MURO BAJO
M35
M36

MUROS ESTAR

DESCRIPCION

M1
M2
M3
M22
M23
M24
M25
M37
M38-MURO BAJO

MUROS DORMITORIO 2

DESCRIPCION

M4
M5
M6
M7 -MURO BAJO
M8
M9
M10
M11
M13

MUROS DORMITORIO 1

DESCRIPCION

M12
M13
M14
M15
M16 -MURO BAJO
M17
M18

MUROS BAÑO SOCIAL

DESCRIPCION

M19
M20
M21
M22

VENTANAS

DESCRIPCION

V1 - ESTAR
V2 -DORMITORIO 2
V3 - DORMITORIO 1
V4 - DORMITORIO PRINCIPAL
V5 - BAÑO PRIVADO
MUROS PUERTAS

DESCRIPCION

P1 - BAÑO PRIVADO
P2 - DORMITORIO PRINCIPAL
P3 - BAÑO SOCIAL
P4 - DORMITORIO 2
P5 - DORMITORIO 1
AL
MEDIDAS UND
LARGO ALTO M2
0.65 2.4 1.56
0.65 2.4 1.56
2.4 2.4 5.76
V2
3.5 2.4 8.4
M7 M8 M14
2.3 1.2 2.76
1.2 2.4 2.88

M9
2.75 2.4 6.6

M13
SUB-TOTAL 29.52
M10 M12

M11

MEDIDAS UND P4

M6
LARGO ALTO M2
1.5 2.4 3.6
0.3 2.4 0.72
0.8 1.2 0.96 M4 M3
2.5 2.4 6

M22
M5
1.1 2.4 2.64
SUB-TOTAL 13.92 M2

M1
MEDIDAS UND
LARGO ALTO M2
2.2 2.4 5.28
2.5 2.4 6
M38 M37
1.3 2.4 3.12 V1
0.45 2.4 1.08 M36
M26
P2
2.4 2.4 5.76 P1
2.2 2.4 5.28
2.4 2.4 5.76
1.1 2.4 2.64
1.1 2.4 2.64
M33

SUB-TOTAL 37.56
M35

V5
M32

MEDIDAS UND M34


LARGO ALTO M2
1.3 2.4 3.12
M31
2.41 2.4 5.784 M31
3.6 2.4 8.64
2.3 1.2 2.76
0.55 2.4 1.32
1.4 2.4 3.36
0.55 2.4 1.32
1.2 2.4 2.88
1.4 2.4 3.36
SUB-TOTAL 32.544

MEDIDAS UND
LARGO ALTO M2
0.55 2.4 1.32
1.4 2.4 3.36
0.55 2.4 1.32
1.1 2.4 2.64
2.3 2.4 5.52
3.5 2.4 8.4
2.4 2.4 5.76
SUB-TOTAL 28.32

MEDIDAS UND
LARGO ALTO M2
2.4 2.4 5.76
1.1 2.4 2.64
2.4 2.4 5.76
0.45 2.4 1.08
SUB-TOTAL 15.24

MEDIDAS UND
LARGO ALTO M2
1.1 1.2 1.32
2.3 1.2 2.76
2.3 1.2 2.76
2.3 1.2 2.76
0.8 1.2 0.96
SUB-TOTAL 10.56
MEDIDAS UND
LARGO ALTO M2
1 2 2
1 2 2
1 2 2
1 2 2
1 2 2
SUB-TOTAL 10

TOTAL 177.664
M16
V3
M15

M14
M13

M17

M12

M11
P5 M18

M19
M20

P3
M21
M22

M23
M24

M25

M28
M26

M27

P2
M29

M31 V4 M30
M31 V4 M30
ITEM: MURO EN DRYWALL

Código Descripción Unidad Rend./Cant. Desperdicio Vr. Unitario


l. MATERIALES

LAMINA DRYWALL 10mm 2440x1220 (home


center Placa Fibrocemento 10mm 244x122cm UND 0.34 5% 69,900.00
42.93kg aprox.)

LAMINA DRYWALL 8mm 2440x1220


(homecenter Placa Fibrocemento 8mm UND 0.34 5% 51,900.00
244x122cm 31.96kg aprox)

PERFIL VERTICAL PARAL (89 Alea 38mm)


(homecenter Paral B9 3-5/8 X 1-1/4 pulg UND 0.76 5% 7,900.00
0.38mm 2.44m)

PERFIL HORIZONTAL CANAL (90)


(homecenter Canal B9 3-5/8 x 1-pulg 0.38mm UND 0.34 5% 6,900.00
2.44m)

TORNILLO CON CHAZO DE 7x7/16


(homecenter Tornillo Estructura Drywall Pta UND 20.00 5% 50.00
Aguda 7X7/16 100un)

TORNILLO EXTRAPLANO (Tornillo


UND 28.00 5% 200.00
Aglomerado Autoperforante 6X2 10un)

TORNILLO ESTANDAR N°6x1 (homecenter


UND 23.00 5% 190.00
Tornillo Aglomerado Autoperforante 6X1 10un)

CINTA DE FIBRA DE VIDRIO ROLLO 0.008 5% 14,000.00

MASILLA ACRILICA CUÑETE 0.50 5% 40,000.00

ll.EQUIPOS
HERRAMIENTA MENOR % 0.0500 0% 2,543.00
PISTOLA GL 0.0500 0% 57.50
TALADRO GL 0.0500 0% 37.62
SECCION COMPLETA ANDAMIO 1.2x1.5m DIA 0.0455 0% 800.00
lll. TRANSPORTE
TRANSPORTE MATERIAL VJ 0.0200 0% 30,000.00
IV. MANO DE OBRA
CUADRILLA (1 OF + 2 AY) HH 1.0000 0% 14,948.00
Costo Unitario Total
UNIDAD: M2

Vr. Parcial Vr. Rubro


60,732.00

23,766.00

17,646.00

6,004.00

2,346.00

1,000.00

5,600.00

4,370.00

112.00

20,000.00

168.28
127.15
2.88
1.88
36.37
600.00
600.00
14,948.00
14,948.00
76,448.28