Вы находитесь на странице: 1из 2

ENGINEERING CONSULTANCY Prepare : CPK Doc No:

SERVICES
Review : KK REV 1
Approve : KK Sheet 1 of 2
AIR ELIMINATOR DATASHEET
Date :23.05.19

AIR ELIMINATOR DATASHEET

PROJECT
Crude Oil Unloading and Pumping Project

OWNER
Vedanta Limited
Cairn Oil & Gas

0 23.05.19 ISSUED FOR APPROVAL CPK KK KK


REV REV DATE PURPOSE PREPD REVWD APPD
AIR ELIMINATOR DATASHEET

Crude Oil Unloading and Pumping Project


REV. DATE DESCRIPTION BY PROJECT NAME:
A 22-May-19 Issued For Approval KK LOCATION: Andhra Pradesh
NAME AIR ELIMINATOR TAG NUMBER

GENERAL
TAG NO. V-1102 LINE SIZE (in) 6"
P&ID NO. PID 002 SERVICE Crude Oil
SPEC A QTY. 1 Nos
RATING 150# APPLICATION INLINE (Tanker Unloading, Pump discharge)
OPERATING CONDITIONS
DESIGN PRESSURE (barg) 12.5 CORROSION ALLOWANCE (inch) 0.0625
DESIGN TEMPERATURE (ºC) 100 DENSITY (kg/m3) 846
OPERATING PRESSURE (barg) 9.5 FLOW (m3/hr) 95
OPERATING TEMPERATURE (ºC) 40 PRESSURE DROP @ REQ FLOW VTC
CONSTRUCTION
END CONNECTION FLANGED MANUFACTURER TBD
FLG RTG, FACING & FINISH 150#,CS,ASTM A105,RF, ASME 16.5 DESIGN CODE
CONSTRUCTION MATERIAL

BODY ASTM A 105 GR.WCB

FLANGES ASTM A 105

S.S.metallic spiral wound gaskets inner ring of SS with


GASKETS
CAF filler and C.S. outer ring

OTHERS
"A" (in) VTC WEIGHT(LB) VTC
OVERALL DIMENSION WITH
"B"(in) VTC
G.A.DRAWING
"C" (in) VTC
INSPECTION AND TEST
HYDROSTATIC TEST YES TEST PRESSURE AS PER ASME B31.3
PNEUMATIC TEST NO
NDT AS REQUIRED
NOTE
(1) VTC - Vendor to Confirm
(2) Materails indicted shows minimum matullurgical requirements.
(3) Submission of GA Drawing for approval along with TAG no.
(4) Operation & Maintenance manual (1 No.) to be submitted (If applicable)
(5) Spare list (1 No.) to be submitted
(6) Guarantee / Warrantee Certificate to be submitted
(7) Painting as per Vendor Recommendation

Вам также может понравиться