QUOTATION EQUIPMENT RENTAL
No Equipment Type Model Capacity Quantity Production Date Unit Price/hours Amounts/Unit

I Equipment Rental for Excavation


1 Excavator Kobelco SK200-8 20 Ton/0,8 m3 4 2014 300,000.00 Rp 300,000.00
3 Excavator Hitachi ZX210 20 Ton/1 m3 5 2015 325,000.00 Rp 325,000.00
4 Excavator Sumitomo SH210 20 Ton/1 m3 2 2016 325,000.00 Rp 325,000.00
5 Buldozer Komatsu D65ESS 16 Ton/175 HP 2 2012 375,000.00 Rp 375,000.00
6 Buldozer Komatsu D85ESS 20 T/200 HP 1 2012 450,000.00 Rp 450,000.00
7 Vibratory Roller - Volvo SD110B 12 Ton 2 2018 250,000.00 Rp 250,000.00
8 Vibratory Roller - Sakai SV525 20 Ton 1 2016 250,000.00 Rp 250,000.00
9 Motor Grader - Mitshubishi MG330 135 HP 1 2012 375,000.00 Rp 375,000.00
10 Dump Truck Tronton - Hino 260 PS 20 m3 5 2015 250,000.00 Rp 250,000.00
11 Dump Truck Tronton - Mitshubishi 220 PS 20 m3 5 2015 250,000.00 Rp 250,000.00
13 Dump Truck Colt Diesel - Mitshubishi 120 Ps 5 m3 5 2017 150,000.00 Rp 150,000.00
14 Wheel Loader - XCMG ZL 50 G 3 m3 1 2017 250,000.00 Rp 250,000.00
15 Wheel Loader - XCMG LW 200 1,8 m3 1 2017 200,000.00 Rp 200,000.00
16 Flat Bed Truck Tronton - MAN 280 PS 20 Ton 1 2017 250,000.00 Rp 250,000.00
II Mobilization and demobilization Medan - Sipirok/Tapanuli Selatan (± 550 km)
1 Excavator/Buldozer/Vibratory Roller/Wheel Loader/Motor Grader Rp 17,000,000.00
2 Dump Truck Tronton Hino/Mitshubishi 20 T/Flat Bed Truck Rp 4,000,000.00
3 Dump Truck Colt Diesel - Mitshubishi 125 PS/5 M3 Rp 1,500,000.00

Note : Medan, 24 April 2020


Regards,

Landi Sinaga, ST
Direktur
Note: 1, The equipment rental price above is the unit price / hour
2, Fuel can be provided by Sinohydro during the period, deducted according to the purchase price during settlement.
3, The price above includes salary for operator / assistant operator, accommodation and transport
Part of the construction site
No Job name quantity (m³)

Excavation and backfilling of R1 road


stonework
21,700.00
Excavation and backfilling of R1 road gross
road
6,200.00
Earthwork excavation and backfilling of R1
road 86,598.00
Excavation and backfilling of R2 road gross
40,801.00
road

R2 road earthwork excavation and backfill 172,400.00

Excavation and backfilling of R8 road


220,720.00
stonework
Excavation and backfilling of R8 road gross
road 240.00

Earthwork excavation and backfilling of R8


90,800.00
road
Excavation and backfilling of R4 road
156,800.00
stonework
Excavation and backfilling of R4 road gross
156,799.00
road
Earthwork excavation and backfilling of R4
470,399.00