SHIELDED METAL ARC WELDING SHOP LAY-OUT

Maintain Training
Date Developed: Document No. 00
August 2014 Issued by:
Facilities
Date Revised: DON BOSCO
December 2014 TECHNICAL
Page 2 of 13
SHIELDED METAL
ARC WELDING NC Developed by: INSTITUTE-MAKATI
III JOHNNIE P. SANTOS
TRAINER Revision # 00
Maintain Training
Date Developed: Document No. 00
August 2014 Issued by:
Facilities
Date Revised: DON BOSCO
December 2014 TECHNICAL
Page 3 of 13
SHIELDED METAL
ARC WELDING NC Developed by: INSTITUTE-MAKATI
III JOHNNIE P. SANTOS
TRAINER Revision # 00
Template #1
OPERATIONAL PROCEDURE
Equipment Type Welding Machine
Equipment Code WM02
Location Practical Work Area
Operation Procedure: Electrical System

1. Dismantle the cover of the welding machine.


2. Turn on the main breaker of the machine
3. Turn on the switch of the welding machine.
4. Check the cooling fan if rotating continously.
5. Adjust the current indicator of the machine in 120 ampere.
6. Strike an arc in a test plate and consume 1 whole electrodes.
7. Analyse the current for arc stability.
8. Turn off the machine.
9. Clean the transformer of the welding machine using blower to
eliminate dust build up.
10.Assemble the cover of the welding machine.

Template #2
Maintain Training
Date Developed: Document No. 00
August 2014 Issued by:
Facilities
Date Revised: DON BOSCO
December 2014 TECHNICAL Page 4 of 13
SHIELDED METAL
ARC WELDING NC Developed by: INSTITUTE-
III JOHNNIE P. SANTOS MAKATI
TRAINER Revision # 00
HOUSEKEEPING SCHEDULE
Shielded Metal Arc Welding
Qualification Station/Bldg Mechanical Shop
NCIII
Area/Section Practical Workshop TVET TVET

In-Charge Celito B. Bilo

Schedule for the 2nd Semester, 2014


Responsible Daily Ever Weekly Every Monthl Remarks
ACTIVITIES y 15th y
Person
other Day
Day
1. Clean and check Janitor and
X
welding stations. group leaders
2. Clean and arrange Janitor and
group leaders X
working tables.
3. Clean and check Janitor and
floor, walls, group leaders X
windows, ceilings
4. Clean and check Janitor and
work shop group leaders X
ventilation.
5. Clean and check Janitor and
computer set- group leaders
monitor, CPU,
keyboards, mouse X

6. Clean, inspect Janitor and


hydraulic lifters. group leaders X

7. Clean, check and Janitor and


maintain Tool Room group leaders X

8. Clean and check Janitor and


Rest Room group leaders X

9. Clean and check Janitor and


wash area group leaders X

10. Clean poster Janitor and


visual aid and group leaders
X
signage

11. Dispose waste


Janitor and X
material property
group leaders

Template #3

Maintain Training
Date Developed: Document No. 00
August 2014 Issued by:
Facilities
Date Revised: DON BOSCO
December 2014 TECHNICAL Page 5 of 13
SHIELDED METAL
ARC WELDING NC Developed by: INSTITUTE-
III JOHNNIE P. SANTOS MAKATI
TRAINER Revision # 00
PRACTICAL WORKSHOP HOUSEKEEPING SCHEDULE
DAILY TASK YES NO
Dispose segregated waste; clean garbage cans √
Sweep floors; if wet, wipe dry √
Wipe and clean whiteboards √
Clean and arrange working tables √
Clean and check machines/equipment √
Before leaving, collect stubs and other wastes. √
WEEKLY TASK YES NO
Clean posters, visual aids and update √
accomplishment/Progress Charts
Clean bulbs/lamps/ceilings/walls √
Clean/Wash of windows/glasses/mirrors √
Clean and check tools, machines, supplies, materials √
Sanitize garbage receptacles √
Empty water collector; clean body of Water Dispenser √
MONTHLY TASK YES NO
Conduct inventory √
Clean and arrange tool room √
Inspect electrical system; clean cables, wires √
Clean instructional materials & modules; arrange and put in √
order
Inspect and clean air-conditioning equipment filter; clean body √

Template #4

Maintain Training
Date Developed: Document No. 00
August 2014 Issued by:
Facilities
Date Revised: DON BOSCO
December 2014 TECHNICAL Page 6 of 13
SHIELDED METAL
ARC WELDING NC Developed by: INSTITUTE-
III JOHNNIE P. SANTOS MAKATI
TRAINER Revision # 00
WELDING MACHINE MAINTENANCE SCHEDULE*
8 HOURS 50 HOURS 100 HOURS
1. Clean and remove 1. Clean and check 1. Clean and check
dust and filling cutting machine tip. welding machine,
metal. cooling fan and
2. Clean and check ventilation.
2. Always off the gauge of gas
2. Clean and check
machine after cylinders
grinding machine
welding. 3. Mark empty carbon contact and
3. Arrange the welding cylinders. change it regularly.
cables safely.
4. Turn off all electrical
cables after training.
5. Clean all welding
equipment from dust,
oil and other
chemical liquids.
6. Clean and check all
grinding machine
properly.
7. Secure all gas
cylinder. Put them
proper storage.

Maintain Training
Date Developed: Document No. 00
August 2014 Issued by:
Facilities
Date Revised: DON BOSCO
December 2014 TECHNICAL Page 7 of 13
SHIELDED METAL
ARC WELDING NC Developed by: INSTITUTE-
III JOHNNIE P. SANTOS MAKATI
TRAINER Revision # 00
Template #5
WELDING MACHINE MAINTENANCE SCHEDULE
WELDING MACHINE TYPE MILLER DIAL ARC 250 (AC/DC)
INVENTORY CODE WM02
LOCATION PRACTICAL WORKSHOP
Schedule for the Month of March
MANPOWER Daily Every Weekly Every Monthly Remarks
ACTIVITIES Other 15th
Day Day

Activity is
1. Check and clean the done before
Trainer and
transformer for steel √ and after
group leaders
dust build up the
training.
2. Check and clean the Trainer and Activity is
cooling fan. group leaders done before
√ and after
the
training.

3. Check and Inspect Trainer and Activity is


amperage indicator? group leaders done before
√ and after
the
training.

4. Check the cables Trainer and Activity is


for continuity. group leaders done before
√ and after
the
training.
5. Check the electrode Trainer and Activity is
holder and ground group leaders done before
clamp for damage. √ and after
the
training.
6. Check on and off Trainer and Activity is
switch for proper group leaders done before
functionality √ and after
the
training.

Maintain Training
Date Developed: Document No. 00
August 2014 Issued by:
Facilities
Date Revised: DON BOSCO
December 2014 TECHNICAL
Page 8 of 13
SHIELDED METAL
ARC WELDING NC Developed by: INSTITUTE-MAKATI
III JOHNNIE P. SANTOS
TRAINER Revision # 00
Template #6

WORKSHOP INSPECTION CHECKLIST

Qualification SHIELDED METAL ARC WELDING NC III


Area/Section PRACTICAL WORKSHOP In-Charge JOHNNIE P. SANTOS

YES NO INSPECTION ITEMS

√ Are the welding station clean and check.

√ Did you clean and arrange working tables according to floor plan/lay-out;
check stability

√ Did you clean and check floor, walls, windows, ceilings

√ Did you clean and check work shop ventilation

√ Did you clean and check computer set-monitor, CPU, keyboards, mouse

√ Did you clean, inspect ventilation blower.

√ Did you clean, check and maintain Tool Room

X Did you clean and check Rest Room

√ Did you clean and check wash area

√ Did you clean poster visual aid and signage

√ Did you dispose waste material property

Remarks: There is a bad odor in the rest room.

Inspected by: JOHNNIE P. SANTOS Date: DEC. 3, 2014

Template #7

Maintain Training
Date Developed: Document No. 00
August 2014 Issued by:
Facilities
Date Revised: DON BOSCO
December 2014 TECHNICAL
Page 9 of 13
SHIELDED METAL
ARC WELDING NC Developed by: INSTITUTE-MAKATI
III JOHNNIE P. SANTOS
TRAINER Revision # 00
EQUIPMENT MAINTENANCE INSPECTION CHECKLIST
Equipment Type : WELDING MACHINE
Property Code/Number : WM02
Location : PRACTICAL WORKSHOP
YES NO INSPECTION ITEMS
√ 1. Are the welding machine free from dust?

√ 2. Are the cooling fan clean and free from dust?


√ 3. Are the amperage indicator check and inspect for
damage?
√ 4. Are the welding cables check for continuity?
√ 5. Are the electrode holder and ground clamp are check for
damaged?
√ 6. Is the on and off switch check for functionality?
Remarks: No.

Inspected by: JOHNNIE P. SANTOS Date: 12- 3- 14

TAG-OUT INDEX CARD Template #8

Maintain Training
Date Developed: Document No. 00
August 2014 Issued by:
Facilities
Date Revised: DON BOSCO
December 2014 TECHNICAL
Page 10 of 13
SHIELDED METAL
ARC WELDING NC Developed by: INSTITUTE-MAKATI
III JOHNNIE P. SANTOS
TRAINER Revision # 00
DESCRIPTION
LOG DATE TYPE DATE
(System Components,
SERIAL ISSUED (danger/caution) COMPLETED
Test reference, etc.)

2013-001 05-02-13 Danger/Caution Do not switch the welding 07- 13 -13


machine into high
current set up

2013-002 06-04-13 Caution Do not turn on the 07- 11 -13


ventilation fan of
booth number 2

2013-003 8-10-13 Danger/Caution Do not use grinding 01- 25 -14


machine number 7

Template #9
WASTE SEGREGATION CHECKLIST
Maintain Training
Date Developed: Document No. 00
August 2014 Issued by:
Facilities
Date Revised: DON BOSCO
December 2014 TECHNICAL
Page 11 of 13
SHIELDED METAL
ARC WELDING NC Developed by: INSTITUTE-MAKATI
III JOHNNIE P. SANTOS
TRAINER Revision # 00
QUALIFICATION SHIELDED METAL ARC WELDING NC III

AREA/SECTION Practical Work Area

IN-CHARGE Celito B. Bilo

GENERAL WASTE / WASTE SEGREGATION METHOD


ACCUMULATED
Recycle Compost Dispose

1. papers, cardboards, √
folders

2. electrical cables √

3. Metal plates √

4. Metal pipes √

5. Electrode stubs √

6. Used rags / cleaning √


materials

7. Used bulbs √

Maintain Training
Date Developed: Document No. 00
August 2014 Issued by:
Facilities
Date Revised: DON BOSCO
December 2014 TECHNICAL
Page 12 of 13
SHIELDED METAL
ARC WELDING NC Developed by: INSTITUTE-MAKATI
III JOHNNIE P. SANTOS
TRAINER Revision # 00
DON BOSCO TECHNICAL INSTITUTE
Technical Vocational Education and Training Center
Don Chino Roces Avenue cor. Don Bosco Street, Makati City

Service Request Form


Template #10
Date __DEC. 3, 2014__
A. CLIENT DATA
Name __JOHNNIE P. SANTOS_______ Department Office __MECHANICAL (TVET)_
B. SERVICE REQUESTED
Repair Carpentry Work Painting Welding
Plumbing Cleaning Others (Please Specify Below)
_PERFORM ENGINE TUNE-UP____________________________________________________
C. EQUIPMENT / APPLIANCE DATA
Type ___VENTILATION FAN_____________________________ Brand Name __HITACHI____
Model ____ZZE 121L-GEP DK M Serial No. 3ZZ-4000141 1598
D. CLIENT REMARKS
Remarks / Complaint(s)
Did not functioning since Dec. 1, 2014 and the welding fumes scattered in the
welding area.
I hereby acknowledge the above service rendered
Date/Time Started __DEC. 3, 2014_ Finished ___DEC. 3, 2014___
Client ___JOHNNIE P. SANTOS_____ Date ___DEC. 3 ,2014___
Signature

E. RECEIVED BY F. APPROVAL
FR. NOEL SUMAGUI, SDB
ALFRED B. SANTOS 12-3-14 ENGR. R. D. FUENTES
Technician Date Department Head Administrator

Maintain Training
Date Developed: Document No. 00
August 2014 Issued by:
Facilities
Date Revised: DON BOSCO
December 2014 TECHNICAL
Page 13 of 13
SHIELDED METAL
ARC WELDING NC Developed by: INSTITUTE-MAKATI
III JOHNNIE P. SANTOS
TRAINER Revision # 00
DON BOSCO TECHNICAL INSTITUTE
Technical Vocational Education and Training Center
Don Chino Roces Avenue cor. Don Bosco Street, Makati City

Template #11

Supplies/Equipment Purchase Request

Department/Shop Office _MECHANICAL (TVET)__ Date:_12-06-14___

QTY ARTICLES Unit Price Amount Remarks

2 BOXES NIHONWELD 3.2 mm E308 5,000.00 10,000.00 WELDING


TRAINING

2 BOXES KOBELCO 2.5mm E308 10,000.00 20,000.00 WELDING


TRAINING

3 BOXES TYROLIT 4” GRINDING DISK 750.00 2,250.00 WELDING


TRAINING

3 BOXES TYROLIT 4” CUTTING DISK 500.00 1,500.00 WELDING


TRAINING

2 UNITS MILLERWELD DIALARC 250 130,000.00 260,000.00 WELDING


TRAINING

TOTAL 293,750.00

Requested by: _ENGR. RODNEY FUENTES Approved by: __Fr. NOEL SUMAGUI, SDB
Department Head Administrator

Maintain Training
Date Developed: Document No. 00
August 2014 Issued by:
Facilities
Date Revised: DON BOSCO
December 2014 TECHNICAL
Page 14 of 13
SHIELDED METAL
ARC WELDING NC Developed by: INSTITUTE-MAKATI
III JOHNNIE P. SANTOS
TRAINER Revision # 00
Maintain Training
Date Developed: Document No. 00
August 2014 Issued by:
Facilities
Date Revised: DON BOSCO
December 2014 TECHNICAL
Page 15 of 13
SHIELDED METAL
ARC WELDING NC Developed by: INSTITUTE-MAKATI
III JOHNNIE P. SANTOS
TRAINER Revision # 00

Вам также может понравиться