Вы находитесь на странице: 1из 39

Today's Date 03 May 2020, Sunday

Project Title Food Order & Delivery Service Management


Student Name Sheikh Thanbir Alam
Student ID 201-44-201
Company Name Food X Limited
Week Starts from Saturday
Start Date 4/10/2020
0

MILESTONES TASK/ACTIVITY ASSIGNED TO:

1 INITIATION
1.1 Idea Generation Requirement Engineer
1.2 Formation of Project Charter Requirement Engineer
1.3 Revision of Project Charter Requirement Engineer

1.4 Drafting Organization Hierarchy Requirement Engineer

1.5 Guidelines Requirement Engineer


1.6 Feasibility Study Feasibility Study Engineer
2 REQUIREMENTS
2.1 Stakeholder Identification Requirement Engineer
2.2 Business Requirements Requirement Engineer

2.3 Functional Requirements Requirement Engineer

2.4 Market Requirements Requirement Engineer


2.5 Product Requirements Requirement Engineer

2.6 Technical Requirements Requirement Engineer

2.7 Quality Requirements Requirement Engineer


2.8 User Interface Requirements Requirement Engineer
2.9 Customer Requirements Requirement Engineer
2.10 Non-Functional Requirements Requirement Engineer
2.11 Software Requirements Specification Requirement Engineer
3 DESIGN
3.1 Software Architecture Design System Designer

3.2 Structure Partision System Designer


3.3 Data Structure System Designer
3.4 Software Procedure System Designer
3.5 Hidding Information System Designer
3.6 Database Design System Designer
4 DEVELOPMENT
4.1 Code Pattern Developer
4.2 MVC Developer
4.3 Frontend (Module Wise) Developer
4.4 Backend (Module Wise) Developer
4.5 Frontend (Integration) Developer
4.6 Backend (Integration) Developer
4.7 In Development Test Developer
5 TESTING
5.1 Installation Testing Quality Assurance Engineer
5.2 Compatability Testing Quality Assurance Engineer
5.3 Usability Testing Quality Assurance Engineer
5.4 Accesssibility Testing Quality Assurance Engineer
5.5 Security Testing Quality Assurance Engineer
5.6 Unit Testing Quality Assurance Engineer
5.7 Integration Testing Quality Assurance Engineer
5.8 Functional Testing Quality Assurance Engineer
5.9 Regression Testing Quality Assurance Engineer
5.10 Load Testing Quality Assurance Engineer
5.11 Stress Testing Quality Assurance Engineer
5.12 Recovery testing Quality Assurance Engineer
5.13 Migration testing Quality Assurance Engineer
5.14 Hardware Testing Quality Assurance Engineer
6 UAT
6.1 Bata Testing End User
6.2 Contract Acceptance Testing End User
6.3 Regulation Acceptance Testing End User
6.4 Operational Acceptance Testing End User
7 TRANNING
7.1 Products and services training System Trainer
7.2 Technical Training System Trainer
7.3 Public courses System Trainer
8 MAINTAINANCE
8.1 Identifying the Problem System Administrators
8.2 Planning the Problem System Administrators
8.3 Scheduling the Problem System Administrators
8.4 Executing the Problem System Administrators
8.5 Solving the Problem System Administrators
8.6 Changement Request System Administrators
9 CHANGEMENT
9.1 Get Feedback Developer
9.2 Change Design Developer
9.3 Developing Developer
9.4 Testing Developer
9.5 Deployment Developer
WBS of SDLC (FODS)

rvice Management

PLANNED ACTUAL DEPENDENCY DEPENDENCY ON


INITIATION INITIATION ON PREVIOUS OUTSIDE
DATES DATES TASKS RESOURCES

4/10/2020 4/10/2020
4/12/2020 4/12/2020 1.1 1.1
4/13/2020 4/13/2020 1.2 1.2

4/14/2020 4/14/2020 1.3 1.3

4/16/2020 4/16/2020 1.4 1.4


4/18/2020 4/18/2020 1.3, 1.4, 1.5 1.3, 1.4, 1.5

4/16/2020 4/16/2020 1.4 1.4


4/16/2020 4/16/2020 1.4 1.4

4/16/2020 4/16/2020 1.4 1.4

4/18/2020 4/18/2020 1.6 1.6


4/18/2020 4/18/2020 1.6 1.6

4/18/2020 4/18/2020 1.5 1.5

4/18/2020 4/18/2020 1.5 1.5


4/16/2020 4/16/2020 1.4 1.4
4/16/2020 4/16/2020 1.4 1.4
4/18/2020 4/18/2020 1.4, 1.5, 1.6 1.4, 1.5, 1.6
4/19/2020 4/19/2020 2.1 - 2.10 2.1 - 2.10
4/22/2020 4/22/2020 1.4, 2.11 1.4, 2.11

4/26/2020 4/26/2020 3.1 3.1


4/22/2020 4/22/2020 2.11 2.11
4/24/2020 4/24/2020 3.2, 3.3 3.2, 3.3
4/19/2020 4/19/2020 1.5 1.5
4/24/2020 4/24/2020 3.3 3.3

4/27/2020 4/27/2020 3.1, 3.6 3.1, 3.6


4/28/2020 4/28/2020 4.1 4.1
4/29/2020 4/29/2020 3.1,3.3, 3.6, 4.2 3.1,3.3, 3.6, 4.2
4/29/2020 4/29/2020 3.1 - 3.6, 4.2 3.1 - 3.6, 4.2
5/4/2020 5/4/2020 4.3 4.3
5/10/2020 5/10/2020 4.4 4.4
5/17/2020 5/17/2020 4.5, 4.6 4.5, 4.6

5/20/2020 5/20/2020 4.7 4.7


5/20/2020 5/20/2020 4.7 4.7
5/20/2020 5/20/2020 4.7 4.7
5/20/2020 5/20/2020 4.7 4.7
5/20/2020 5/20/2020 4.7 4.7
5/10/2020 5/10/2020 4.3, 4.4 4.3, 4.4
5/17/2020 5/17/2020 4.5, 4.6 4.5, 4.6
5/20/2020 5/20/2020 4.7 4.7
5/20/2020 5/20/2020 4.7 4.7
5/20/2020 5/20/2020 4.7 4.7
5/20/2020 5/20/2020 4.7 4.7
5/20/2020 5/20/2020 4.7 4.7
5/20/2020 5/20/2020 4.7 4.7
5/20/2020 5/20/2020 4.7 4.7

5/21/2020 5/21/2020 5.1 - 5.14 5.1 - 5.14


5/21/2020 5/21/2020 5.1 - 5.14 5.1 - 5.14
5/21/2020 5/21/2020 5.1 - 5.14 5.1 - 5.14
5/21/2020 5/21/2020 5.1 - 5.14 5.1 - 5.14

5/21/2020 5/21/2020 5.1 - 5.14 5.1 - 5.14


5/21/2020 5/21/2020 5.1 - 5.14 5.1 - 5.14
5/21/2020 5/21/2020 5.1 - 5.14 5.1 - 5.14

5/30/2020 5/30/2020 6.1 6.1


6/1/2020 6/1/2020 8.1 8.1
6/3/2020 6/3/2020 8.2 8.2
6/4/2020 6/4/2020 8.3 8.3
6/7/2020 6/7/2020 8.4 8.4
6/10/2020 6/10/2020 8.4 8.4

6/12/2020 6/12/2020 8.6 8.6


6/17/2020 6/17/2020 9.1 9.1
6/20/2020 6/20/2020 9.2 9.2
6/22/2020 6/22/2020 9.3 9.3
6/24/2020 6/24/2020 9.4 9.4
BS of SDLC (FODS)

CONSTRAINTS OR RISKS ALONG WITH MITIGATION PLAN

YES (Idea will be changed as business goal)


NO
YES ( Rebulid the formataion of project charter)
YES (Drafting Organization Hierarchy will be well described for technical or non
technical )
YES (Guide Line maybe change for stakeholders in mitigation)
NO

YES (In mitigation, re-engineering to find stakeholders)


YES (Business requirements have to collect in detail in mitigation plan)

YES (Collect those requiremnets using traditional way or using digital approach)

YES (Analysis market situation indetail in mitigation plan)


YES (In mitigation plan, product will be fixed as customers needed)
YES (Technical requirements has been changed as business plan in mitigated
plan)
YES (In mitigation plan, quality will be fixed as customers needed)
YES (In mitigation plan, interface will be fixed as customers needed)
YES (In mitigation plan, product will be fixed as customers needed)
NO
YES (In mitigation plan, SRS will be fixed as technical perspective)
YES (Design can be change any time for customers need before the development
phase)
NO
NO
NO
YES (It can be change as guidelines or policies of business)
YES (Database design will be based on users data )

NO
YES (MVC framework may be change as customes requirements)
NO
NO
NO
NO
YES (If test fail then those above procedures will have to do again)

YES (Letting know to adminstrator to fix )


YES (Letting know to adminstrator to fix )
YES (Letting know to adminstrator to fix )
YES (Letting know to adminstrator to fix )
YES (Letting know to adminstrator to fix )
YES (Letting know to adminstrator to fix )
YES (Letting know to adminstrator to fix )
YES (Letting know to adminstrator to fix )
YES (Letting know to adminstrator to fix )
YES (Letting know to adminstrator to fix )
YES (Letting know to adminstrator to fix )
YES (Letting know to adminstrator to fix )
YES (Letting know to adminstrator to fix )
YES (Letting know to adminstrator to fix )

YES (Re-engineering to meet goal)


YES (Re-engineering to meet goal)
YES (Re-engineering to meet goal)
YES (Re-engineering to meet goal)

YES (Try to teach in detail in easy way )


YES (Try to teach in detail in easy way )
YES (Try to teach in detail in easy way )

YES (Contact with users directly )


YES (Replan for problematic module)
NO
YES (Replan for executing that module)
YES (Replan again to fix problem)
YES (let know to developer)

YES
YES
YES
YES
YES
0
2 02
r
Ap

COMPLETION
Act. Duration

Actual End

Remaining
Complete

Complete
PLANNED

Assigned
Duration

OUTCOMES

DATES

Proposal Idea 2 3 100% 4/11/2020 4/12/2020 1 2 0


Project Charter 1 2 100% 4/12/2020 4/13/2020 0 1 0
Final Project Charter 1 2 100% 4/13/2020 4/14/2020 1 1 0

Organization Hierarchy 2 3 100% 4/15/2020 4/16/2020 2 2 0

Guidelines Documents 3 3 100% 4/18/2020 4/18/2020 2 3 0


Feasibility Study Report 1 1 100% 4/18/2020 4/18/2020 0 1 0

System's Stakeholders 1 2 99% 4/16/2020 4/17/2020 1 0 1


Organizational Objective 1 2 99% 4/16/2020 4/17/2020 1 0 1

Functions 1 2 99% 4/16/2020 4/17/2020 1 0 1

Market Statistics 1 2 99% 4/18/2020 4/19/2020 0 0 1


Usable Product 1 2 99% 4/18/2020 4/19/2020 0 0 1

Technical Issues 1 1 99% 4/18/2020 4/18/2020 0 0 1

Capability 1 2 99% 4/18/2020 4/19/2020 0 0 0


Software User Interface 1 2 99% 4/16/2020 4/17/2020 1 0 0
Services Expectation 1 2 99% 4/16/2020 4/17/2020 1 0 0
Capability of System 1 2 99% 4/18/2020 4/19/2020 0 0 0
Description of a Software 4 4 99% 4/22/2020 4/22/2020 3 3 1
Identify requirements 5 5 99% 4/26/2020 4/26/2020 3 4 1

Partition Into Prototypes 2 2 99% 4/27/2020 4/27/2020 1 1 1


Relationship of data and system 3 3 99% 4/24/2020 4/24/2020 3 2 1
Iterative and incremental software development 2 2 99% 4/25/2020 4/25/2020 1 1 1
Structure of Hide Confidential Data 1 3 99% 4/19/2020 4/21/2020 0 0 1
Normalized Database 4 4 99% 4/27/2020 4/27/2020 2 3 1

Programming Language 1 1 99% 4/27/2020 4/27/2020 1 0 1


Framework 1 1 99% 4/28/2020 4/28/2020 1 0 1
Modules of Forntend 6 6 99% 5/4/2020 5/4/2020 4 5 1
Modules of Backend 12 12 99% 5/10/2020 5/10/2020 8 11 1
Integrate all Prototypes 8 8 99% 5/11/2020 5/11/2020 6 7 1
Integrate all Prototypes 8 8 99% 5/17/2020 5/17/2020 5 0 0
Integrate Whole System 4 4 99% 5/20/2020 5/20/2020 3 3 1

Make sure the software is installed 3 3 99% 5/22/2020 5/22/2020 3 2 1


Check whether the application is compatible 4 4 99% 5/23/2020 5/23/2020 3 3 1
Identify any usability problems 2 2 99% 5/21/2020 5/21/2020 2 1 1
Application being tested is usable by people 5 5 99% 5/24/2020 5/24/2020 3 4 1
Identify the security of system 4 4 99% 5/23/2020 5/23/2020 3 3 1
Test of Segregate each part of the program 3 3 99% 5/12/2020 5/12/2020 2 2 1
Test of whole the program 1 1 99% 5/17/2020 5/17/2020 0 0 1
Test each function if working or not. 7 7 99% 5/26/2020 5/26/2020 5 6 1
Test new changement program 4 4 99% 5/23/2020 5/23/2020 3 3 1
Loading Capability 3 3 99% 5/22/2020 5/22/2020 3 2 1
Identify the system recovers after failure 1 1 99% 5/20/2020 5/20/2020 1 0 1
Identify the system recovers after crashing 2 2 99% 5/21/2020 5/21/2020 2 1 1
Migration of the legacy to the new system 4 4 99% 5/23/2020 5/23/2020 3 3 1
Check Hardware Capability 1 1 99% 5/20/2020 5/20/2020 1 0 1

User Feedback 10 10 99% 5/30/2020 5/30/2020 7 9 1


Acceptance directly in the contract 5 5 99% 5/25/2020 5/25/2020 3 4 1
Product meets all functional requirements 5 5 99% 5/25/2020 5/25/2020 3 4 1
Evaluates operational readiness 5 5 99% 5/25/2020 5/25/2020 3 4 1

Get Trained Employee 3 3 99% 5/23/2020 5/23/2020 2 2 1


Employee gain technical knowledge 3 3 99% 5/23/2020 5/23/2020 2 2 1
Public has been trained to use system 4 4 99% 5/24/2020 5/24/2020 2 3 1

Get Problem by Feedback 2 3 99% 5/31/2020 6/1/2020 0 1 1


Planning Creation 3 3 99% 6/3/2020 6/3/2020 3 2 1
Secheduling the problems 1 1 99% 6/3/2020 6/3/2020 1 0 1
Problem Exexuting on customers environment 4 5 99% 6/7/2020 6/8/2020 2 3 1
Fix poblem 4 5 99% 6/10/2020 6/11/2020 3 2 2
Poblem is not solved yet 2 3 99% 6/11/2020 6/12/2020 2 1 1

Get feedback from Adminstrator 5 6 99% 6/16/2020 6/17/2020 3 4 1


Identify requirements and design again 3 4 99% 6/19/2020 6/20/2020 3 2 1
Develop the new criteria 2 3 99% 6/21/2020 6/22/2020 0 1 1
Test in house environment by developer 2 3 99% 6/23/2020 6/24/2020 2 1 1
Publish the new invention 2 3 99% 6/25/2020 6/26/2020 2 1 1
11 Sat

Ap
r
12 Sun

2
13 Mon

02
0
14 Tue
15 Wed
16 Thu
17 Fri
18 Sat
19 Sun
20 Mon
21 Tue
22 Wed
23 Thu
24 Fri
25 Sat
26 Sun
27 Mon
28 Tue
29 Wed
30 Thu
01 Fri
Ma

02 Sat
y 2

03 Sun
02
0

04 Mon
05 Tue
06 Wed
07 Thu
08 Fri
09 Sat
10 Sun
11 Mon
12 Tue
13 Wed
14 Thu
15 Fri
16 Sat
17 Sun
18 Mon
19 Tue
20 Wed
21 Thu
22 Fri
23 Sat
24 Sun
25 Mon
26 Tue
27 Wed
28 Thu
29 Fri
30 Sat
31 Sun
01 Mon
Jun

02 Tue
2

03 Wed
02
0

04 Thu
05 Fri
06 Sat
07 Sun
08 Mon
09 Tue
10 Wed
11 Thu
12 Fri
13 Sat
14 Sun
15 Mon
16 Tue
17 Wed
18 Thu
19 Fri
20 Sat
21 Sun
22 Mon
23 Tue
24 Wed
25 Thu
26 Fri
27 Sat
28 Sun
29 Mon
30 Tue
01 Wed
02 Thu
Jul
2 0
03 Fri
20

04 Sat
05 Sun
06 Mon
07 Tue
08 Wed
09 Thu
10 Fri
11 Sat
12 Sun
13 Mon
14 Tue
15 Wed
16 Thu
17 Fri
18 Sat
19 Sun
20 Mon
21 Tue
22 Wed
23 Thu
24 Fri
25 Sat
26 Sun
27 Mon
28 Tue
29 Wed
30 Thu
31 Fri
01 Sat

Au
g
02 Sun

2
03 Mon 02
0
04 Tue
05 Wed
06 Thu
07 Fri
08 Sat
09 Sun
10 Mon
11 Tue
12 Wed
13 Thu
14 Fri
15 Sat
16 Sun
17 Mon
18 Tue
19 Wed
20 Thu

21 Fri
22 Sat
23 Sun
24 Mon
25 Tue
26 Wed
27 Thu
28 Fri
29 Sat
30 Sun
31 Mon

01 Tue
02 Wed Sep
202
03 Thu
0

04 Fri
05 Sat
06 Sun
07 Mon
08 Tue
09 Wed
10 Thu
11 Fri
12 Sat
13 Sun
14 Mon
15 Tue
16 Wed
17 Thu
18 Fri
19 Sat
20 Sun
21 Mon
22 Tue
23 Wed
24 Thu
25 Fri
26 Sat
27 Sun
28 Mon
29 Tue
30 Wed
01 Thu

Oc
t
02 Fri

2
03 Sat

02
0
04 Sun
05 Mon
06 Tue
07 Wed
08 Thu
09 Fri
10 Sat
11 Sun
12 Mon
13 Tue
14 Wed
15 Thu
16 Fri
17 Sat
18 Sun
19 Mon
20 Tue
21 Wed
22 Thu
23 Fri
24 Sat
25 Sun
26 Mon
27 Tue
28 Wed
N
29 Thu
30 Fri
31 Sat
01 Sun

No
02 Mon

v 2
03 Tue

02
04 Wed

0
05 Thu
06 Fri
07 Sat
08 Sun
09 Mon
10 Tue
11 Wed
12 Thu
13 Fri
14 Sat
15 Sun
16 Mon
17 Tue
18 Wed
19 Thu
20 Fri
21 Sat
22 Sun
23 Mon
24 Tue
25 Wed
26 Thu
27 Fri
28 Sat
29 Sun
30 Mon
01 Tue
De
c

02 Wed
2

03 Thu
02

04 Fri
0

05 Sat
ec
2 02
0
06 Sun
07 Mon
08 Tue
09 Wed
10 Thu
11 Fri
12 Sat
13 Sun
14 Mon
15 Tue
16 Wed
17 Thu
18 Fri
19 Sat
20 Sun
21 Mon
22 Tue
23 Wed
24 Thu
25 Fri
26 Sat
27 Sun
28 Mon
29 Tue
30 Wed
31 Thu
01 Fri
Ja
n

02 Sat
2

03 Sun
02
1

04 Mon
05 Tue
06 Wed
07 Thu
08 Fri
09 Sat
10 Sun
11 Mon
12 Tue
13 Wed
14 Thu
15 Fri
16 Sat
17 Sun
18 Mon
19 Tue
20 Wed
21 Thu
22 Fri
23 Sat
24 Sun
25 Mon
26 Tue
27 Wed
28 Thu
29 Fri
30 Sat
31 Sun
01 Mon
Feb
02 Tue
2

03 Wed
02
1

04 Thu
05 Fri

Вам также может понравиться