Академический Документы
Профессиональный Документы
Культура Документы
PIXEL IT SOLUTIONS
Presented by
Shovon Basak
Amit Sarker
Ariful Islam
Page 1 of 45
Contents
Chapter-1 ...................................................................................................................................................... 3
1.1 Executive Summary .......................................................................................................................... 3
1.2 Introduction ....................................................................................................................................... 4
1.3 Background problem ........................................................................................................................ 5
1.4 Project Goals and Value to Stakeholder ......................................................................................... 6
1.5 Stakeholder’s analysis ...................................................................................................................... 7
1.6 Scope Analysis ................................................................................................................................... 8
1.7 Work Break down structure ............................................................................................................ 9
Chapter-2 .................................................................................................................................................... 10
Methodology .......................................................................................................................................... 11
SCHEDULE/TIME MANAGEMENT: .............................................................................................. 12
RESOURCE MANAGEMENT: .......................................................................................................... 12
Risk Management: ................................................................................................................................ 13
Client Approval for Software Process ................................................................................................. 15
Requirement .......................................................................................................................................... 16
Functional Requirement: ..................................................................................................................... 17
Requirements Confirmation/Stakeholder sign-off: ........................................................................... 20
Chapter- 3.................................................................................................................................................... 21
Testing and Development ..................................................................................................................... 21
Client MOM with Feedback ................................................................................................................ 36
Chapter-4 .................................................................................................................................................... 38
Deployment: Deployment Sign-off Sheet ............................................................................................ 38
Deployment: Deployment Sign-off ...................................................................................................... 42
Sign-off: Approval or Rejection........................................................................................................... 43
Chapter-5 .................................................................................................................................................... 44
RESULTS .............................................................................................................................................. 44
Final Delivery ........................................................................................................................................ 44
CONCLUSION ..................................................................................................................................... 45
Page 2 of 45
Chapter-1
Pixel IT Solutions is database consulting firm which provides end to end solutions for business
institutions. General purpose is to serving them with new tools and software which will help their
business to grow. KM SUPER SHOP is one of the client for Pixel IT Solutions
The purpose of below project is how Pixel IT Solutions help KM SUPER SHOP to design a
database software to include new customer’s name, products name and make the process easier
to them. This project was covered in span of 2.5 months. Pixel IT Solutions team worked closely
This Project is very important in learning aspect as it covers complete project life cycle on how
exactly consulting software firms. The project covers from project acquisition, implementation
and delivery cycle. The methodology applied is agile method which is most effective and
Page 3 of 45
1.2 Introduction
Pixel IT Solutions is a Database Consultants on an average have over 5 years of experience helping
possess the business process expertise and technology expertise required to architect database
solutions for Enterprise Resource Planning (ERP), Financial Reporting, Customer Relationship
Management (CRM), CRO Clinical Trial Management System (CTMS), Content Management
Systems (CMS), Business Intelligence, Human Resource, internet enabled database solution, and
mobile applications. With office in Bangladesh, Pixel IT Solutions Database Consulting team has
handled complex IT projects including installation, configuration, design, and architecture of large
databases for Commercial off the Shelf (COTS) applications implementation, customized software
development, technology upgrades, and global offshore development projects. Our skilled
Database Consulting team has developed customized database software applications using Oracle
Page 4 of 45
1.3 Background problem
KM SUPER SHOP is a super shop that currently using the traditional paper base technique to store
the data of their customer, products, inventories etc. but they are facing problem as they are
growing up. A huge amount of loyal consumers has been increased and according to their customer
satisfaction they have to assign more new employees and staffs and also have to store more
varieties of product. As more requirement in happening the amount of data with the business is
growing. The paper based system is becoming more difficult to handle, with increasing data
security issues are also growing. The problems of data loss have been faced by the manager. They
want to implement technological advancement in their business so that they can easily handle their
data for that KM SUPER SHOP hired Pixel IT Solutions to provide them solution.
Page 5 of 45
1.4 Project Goals and Value to Stakeholder
All the paper based data will be converted in the digital format.
The bellow illustrated diagram shows that, the above process change will be highly beneficial for
client as it will make the new hiring process easy and smoother
50
Page 6 of 45
1.5 Stakeholder’s analysis
The bellow diagram shows the analysis of stake holders that had been done by Pixel IT Solutions
Internal Stakeholder
Easily store the huge amount of data & External Stakeholder
easy to find those data that useres can
easily be accessed New part-time worker
Page 7 of 45
1.6 Scope Analysis
The scope for this project was defined through a comprehensive requirements collection process.
First, a thorough analysis was performed on the company’s current process and forms, applications
From this information, Pixel IT Solutions has developed the project team to develop the project
requirements documentation. The project description and deliverables were developed based on
the requirements collection process and input from subject matter experts present at Pixel IT
Solutions in domains like software consulting, Software developing and testing, Data analysis.
This project includes identifying the software application, design and programming, and testing of
new forms as per collected requirements from KM SUPER SHOP. The project deliverables include
new digital data entry process forms with the flexibility to modify and expand the application as
necessary in the future. This project will be accepted once the new forms have been fully implanted
and tested by the department and have been shown to be compatible with the KM SUPER SHOPs
current process.
Page 8 of 45
1.7 Work Break down structure
Maintainance
Deployment
Final Form
Delivery
Delivery Form as
per Completion
Developing Form
Gathering
Information
Team Discussion
with client
Requirement
Client Meeting
Closing High
Level
Requirement
Doing Analysis
Page 9 of 45
Chapter-2
Page 10 of 45
Logo Name Details & Features Plan Price
Excel
Methodology
Page 11 of 45
SCHEDULE/TIME MANAGEMENT:
Time management involves identifying the specific tasks/activities that project team members and
stakeholders must perform to produce product deliverable. It is needed to identify and document
the activity sequencing. It includes the estimation of work periods that are needed to complete
individual activities. It involves controlling and managing changes to project schedule. The
established baseline is of two weeks of the project and then monitor progress against baseline on
weekly basis. Project Schedule is updated with latest information and not more than two business
days.
Scheduling.xlsx
RESOURCE MANAGEMENT:
There are many Database analysis software available in the market. Each of them has different
types of pros and cons. According to our project, we need to choose suitable software package
for our client. That software package will help us analysis the data as per our client’s needs. We
will ask about the client’s opinion how they want their database to be generated and what
information’s will need to be added there. Some of the Database generating software packages
The recommended software packages are: My SQL, Microsoft Excel & Microsoft Access. Each
of the software package has different types of features. My SQL has the features where the clients
Page 12 of 45
can management tools and technical support to achieve the highest levels of MySQL scalability,
security, reliability, and uptime another software Microsoft Excel. It has the basic features of all
spreadsheets, using a grid of cells arranged in numbered rows and letter-named columns to
organize data manipulations like arithmetic operations. Microsoft Access is an Ideal for individual
users and smaller teams. Easier than client-server database to understand and use. Import and
export to other Microsoft Office and other applications. Ready templates for regular users to create
and publish data. Allows building and publishing Web databases effortlessly. The other resources
for the projects are the employees such as: The project manager, project lead, data analyst,
Risk Management:
Page 13 of 45
During implementing, planning for a project and each step of completing, a great risk factor is
Cost risk
Risk management is a vital factor in a company as a result of, without it, a firm probably cannot
define its objectives for the longer term. If an organization defines objectives while not taking the
risks into consideration, chances are high that that they'll lose direction once any of those risks
Page 14 of 45
Client Approval for Software Process
Page 15 of 45
Requirement
In the below table, the requirement numbering has a scheme - HR_HLR _0## (HR for Human
Page 16 of 45
Functional Requirement:
In the below table, the requirement numbering has a scheme - HR_LLR _0## (HR for Human
SME
Reviewed
Req# Requirement Comments
/
Approved
HR_HLR01_1 HR_LLR_01_1.1 Add Name Field Character Filed Approved
.1 _LR_1.1.1 on April
Eployee_Perso 9th 2019
HR_LLR_01_1.1 Add DOB Field Date filed with
nal_Informatio
_LR_1.1.2 MM/DD/YYYY
n_form
HR_LLR_01_1.1 Citizen Country Drop down List
_LR_1.1.3
HR_LLR_01_1.1 Visa Status Check box F1/J1
_LR_1.1.4
HR_LLR_01_1.1 Education Level Check box
_LR_1.1.5 MS/Bachelor
HR_LLR_01_1.1 Current Address Address/Multiple
_LR_1.1.6 line
HR_LLR_01_1.1 CWID 8 digits
_LR_1.1.7
HR_LLR_01_1.1 Email Address email
_LR_1.1.8
HR_LLR_01_1.1 Phone number 10 digits
_LR_1.1.9
Page 17 of 45
SME
Reviewed
Req# Requirement Comments
/
Approved
HR_01_1.2 HR_LLR_01_1.2_ Add disclaimer section Custom HTML Approved
Employee_Vo LR_1.1.1 on April
luntary_Sefl_ HR_LLR_01_1.2 Add ‘Yes, I have Check box 9th 2019
Declariontion Disability’
_LR_1.1.2
_Disability
HR_LLR_01_1.2 Add ‘NO,I don’t have Check box
_LR_1.1.3 Disability’
HR_LLR_01_1.2 Add ‘ I don’t wish to Check box
_LR_1.1.4 answer’
HR_LLR_01_1.2 Add ‘Signature’ Signature filed
_LR_1.1.5
HR_LLR_01_1.2 Today’s Date Date Filed
_LR_1.1.6
Page 18 of 45
SME
Reviewed
Req# Requirement Comments
/
Approved
HR_HLR01_1.8 HR_LLR_01_1.8 Name Character Only Approved
on April
Retirement_Information _LR_1.1.1 9th 2019
HR_LLR_01_1.8 SSN Interger 9 digit
Only
_LR_1.1.2
HR_LLR_01_1.8 Employee Character
Title
_LR_1.1.3
HR_LLR_01_1.8 Department Character Only
Details
_LR_1.1.4
HR_LLR_01_1.8 Classification Check Box
_LR_1.1.5
HR_LLR_01_1.8 Questionnaire Check Box
1,2,3,4 Yes /NO
_LR_1.1.6
HR_LLR_01_1.8 Signature Character Only
_LR_1.1.7
HR_LLR_01_1.8 Date Date Filed
MM/DD/YYYY
_LR_1.1.8
Page 19 of 45
Requirements Confirmation/Stakeholder sign-off:
In this section the confirmation of the requirement has documented. For example:
Page 20 of 45
Chapter- 3
Testing and Development
Testing 1:
Form 1:
Customer 1.1 Filling up Filling up all Filling up name, First Failed (Telephone
customer’s mandatory & last name, Number not given)
Customers personal information Address, city, Area,
Information information. of Postal Code,
Form Customer’s Telephone & Fax
Number.
Page 21 of 45
Form 2:
Page 22 of 45
From 3:
Page 23 of 45
Form 4:
Page 24 of 45
Form 5:
Page 25 of 45
Form 6:
Page 26 of 45
Form 7:
Customers Sort out Getting all Inputting Structured Failed (Here problem
Query customer’s mandatory query language to get is forgetting to write
information. information the results. End Quotation mark
Information of
Form Customer’s (”) after (F).
Page 27 of 45
From 8:
Customers Sort out Getting all Inputting Structured Failed (Here problem
Query customer’s mandatory query language to get is insert wrong
information. information the results. column in wrong
Information of table)
Form Customer’s
Page 28 of 45
Testing 2:
Form 1:
Customer 1.1 Filling up Filling up all Filling up name, First Passed (Telephone
customer’s mandatory & last name, Number provided)
Customers personal information Address, city, Area,
Information information. of Postal Code,
Form Customer’s Telephone & Fax
Number.
Page 29 of 45
Form 2:
Page 30 of 45
From 3:
Page 31 of 45
Form 6:
Page 32 of 45
ID# Test Expected Procedure Pass/Fail
Condition Result
Page 33 of 45
Form 7:
Page 34 of 45
From 8:
Page 35 of 45
Client MOM with Feedback
Minutes of Meeting
KM Super Shop – Pixel It Solution
February 21, 2019
Members Present: Others Present: N/A
Shovon Bashak
MD Rezwan Faisal
Aamit Sarker
MD Zayedi Hossain
MH Tanim
MD Ariful Islam
Page 36 of 45
Imran Khan MD Zayedi Decided on tentative timeline for delivery of
Hossain sprint 1 user acceptance testing.
Page 37 of 45
Chapter-4
This is the document which will ensure the customer approval for deployment phrase. It can also
be used for requesting review and approval of project documentation and material between Pixel
Requestor
16-04-2019
Project Name
Deployment Preparation
Setup Database of KM Super Shop completed and approved prior to deployment of Sprint 1.
The following are listed activities.
Page 38 of 45
Sign-off: Approval or Rejection
Approved N/A
Approved N/A
Approved N/A
Feedback:
Document Tracking
Page 39 of 45
Minutes of Meeting
KM Super Shop – Pixel It Solution
February 21, 2019
Members Present: Others Present: N/A
Shovon Bashak
MD Rezwan Faisal
Aamit Sarker
MD Zayedi Hossain
Mojibul Haque Tanim
MD Ariful Islam
Page 40 of 45
Imran Khan MD Zayedi Decided on tentative timeline for delivery of
Hossain sprint 1 user acceptance testing.
Page 41 of 45
Deployment: Deployment Sign-off
Instruction
This is the document which will ensure the customer approval for deployment phrase. It can also
be used for requesting review and approval of project documentation and material between Pixel
IT Solutions and KM SUPER SHOP.
Requestor
10-April-2019
Project Name
Deployment Preparation
Database creation approved prior to deployment of Sprint 2. The following are listed activities.
Page 42 of 45
Sign-off: Approval or Rejection
Approved N/A
Approved N/A
Approved N/A
Page 43 of 45
Chapter-5
RESULTS
Final Delivery
Going Live
Database deployment:
We have built the database of KM Super Shop. Now it is prepared for running !
Page 44 of 45
CONCLUSION
The “Database creation of KM Super Shop” project has given us a great experience that how the
actual Database creation business runs in the industry. We learned a lot of things by doing this
project.
Creating a whole database of a super shop was a great experience but we also faced some
difficulties to make it. Some of the difficulties were like, time management, request of certain
changes in the database from the owners etc. But after all the hard work from our group mates, we
are able to handover the project on time. One of the major things that we learned in this project is
time management.
At last we can say that, this project has given us a clear view that how the software business
industry is running.