SIX LANING OF PIMPALGAON-NASHIK-GONDE SECTION OF NH-3 FROM KM 380.000 TO 440.

000 IN THE STATE OF MAHARASHTRA ON ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) BASIS CONTRACT

AUTHOURITY ENGINEER :- TPF Getinsa-Euro Studios S.L. in JV with TPF Engineering Ptv. Ltd. CONTRACTOR :- DINESHCHANDRA R. AGRAWAL INFRACON PVT. LTD
SUMMARY OF REQUEST FOR INSPECTION OF WORK Date: 28-Apr-20
A) STRUCTURE WORK RFI SUMMARY
SL Date of Date of Request Chainage Length
RFI No. Description of Work Side Engineer Status Remarks
No Submission Request Time From To (m)
254 28-Apr-20 28-Apr-20 03.00pm LP4-Pedestal Reinforcement, Shutter Checking and Concrete (Ozar) LHS Mr. Tiwari
1089 28-Apr-20 28-Apr-20 11.00Am Span (P60-P61)- Segment Lifting (MEC) Mr. Avinash Bhavar
1090 28-Apr-20 28-Apr-20 02.00Pm Span (P50-P51-P52)- Bearing TOP Grouting (MEC) Mr. Avinash Bhavar
1091 28-Apr-20 28-Apr-20 03.00PM Span (P13-P14) Stitch Shutter Checking and Concrete (MEC) Mr. Avinash Bhavar
445 28-Apr-20 28-Apr-20 11.00AM LVUP -Layout Msrking and Excavation 387+125 Mr. Gupta
446 28-Apr-20 28-Apr-20 12.00pm Retaining Wall- Raft R/F Shutter Checking and Concrete(NsK Side, Pimpalgaon) Mr. Gupta
447 28-Apr-20 28-Apr-20 12.00pm LA2-Dirt Wall Final Lift R/F, Shutter Checking and Concrete (Pimpalgaon Fly) Mr. Gupta

B) Survey
1425 28-Apr-20 28-Apr-20 03.00pm LP4-Pedestal Coordinate and level Checking (Ozar) LHS Mr.Deepak Patel
1426 28-Apr-20 28-Apr-20 11.00Am Span (P60-P61)- Segment Coordinate and level Checking (MEC) 408+880 409+350 470 RHS Mr.Vinod Bachhav
1427 28-Apr-20 28-Apr-20 11.00AM LVUP -Layout Msrking and Coordinate Checking 387+125 Mr.Deepak Patel
1428 28-Apr-20 28-Apr-20 12.00pm Retaining Wall- Raft Coordinate and level Checking (NsK Side, Pimpalgaon) Mr.Deepak Patel

C) Highway

D) Electrical

D) Other