Station Blackout

1. Ensure emergency DG set came in to service, if not came in auto start manually.
2. Ensure emergency CW pumps came in to service , if not came in auto start manually.
3. Ensure emergency instrument air compressor came in to service, if not came in auto start
manually.
4. Ensure turbine lube oil pump, LOP came in to service (AC or DC pumps)
5. Both LP bypass close
6. Emergency cooling water to all spies valve (CW01&04) will open and normal CW valves
(CW02&CW03) will close.
7. Ensure that the diesel driven Emergency Boiler Feed water Pump started in auto (Pump start in
auto logic if Combustor bottom temperature >450.0 deg.C & both BFPs off with time delay of 5
second )
8. If EBFP not came in auto start manual mode
9. Ensure that availability of feed water flow to boiler and spray water for SH,RH and HP bypass
steam temperature controls
10. Open the HP bypass valve (Boiler depressurizing rate 8 to 10 bar/hr)
11. Open the RH vent & control RH pressure
12. Open MS line and strainer drain valves
13. Emergency DM makeup pump will switch on in order to maintain deaerator tank level
14. Close Drum emergency drain valves, Close CBD valves & isolation valves to conserve water
15. Boiler feed water supply may be stopped when combustor bottom temperature of < 450°C
16. CRH and HRH drains to atm flash tank to be opened and drains to HPFT closed(if condenser
vacuum low)
17. If condenser vacuum low open the vacuum breaker

Estimated feed Water flow requirements

Initially a minimum Boiler Feed Water rate of about 15 % of the full-load rate will be required, with
the specified depressurization gradient.
Duration of feed water supply
Boiler Feed Water supply has to be continued for about 6 hours.

Emergency instrument air compressor supply lines


A.TG area
1. AS2-Deaerator pegging
2. DM 71-Emergency DM to Deaerator makeup
3. DR38-Deaerator overflow to LPFT

B.PRDS room
1. AS22-MS PRDS
2. AS31-CRH PRDS
3. FD 53-LT PRDS spray
4. FD 54-LT PRDS spray
5. FD 44-HT PRDS spray
6. FD 45-HT PRDS spray
7. FD 63-AST PRDS main spray isolation valve
Boiler area
1. Both stages SH spray control valves-4 Nos (SW-16, 22, 46, 52)
2. RH spray control valves-2Nos (SW-76, 82)
3. Block valves for spray lines-3 Nos (SW001, 032,061)
4. Scanner head cooling –SUB1&2
5. Feed control station-3 nos (FD-20, 23, 26)

Emergency cooling water supply lines


1. EBFP system
2. All seven spies valves

Emergency DM water supply lines


1. Deaerator
2. Emergency Instrument air system cooling

In case difficulties starting of EBFP


1. In case it is not possible to start EBFP lead to a severe damage of the combustor evaporator
tubes due to over heating so therefore all efforts have to made get the EBFP as soon as
possible.
2. In case EBFP not starts, the damage of boiler may be limited by reducing the boiler pressure
with a gradiant of about 1 bar/minute and the water level in the drum is no longer indicated
or visible .

LOADS CONNECTED TO DG SET


1. Boiler fill pump unit 2 2. Boiler fill pump unit 1 3.EDM makeup pump 4. EBFP Panel
5. EBFP Discharge valve 6. AC LOP 7. Emergency Cooling Water Pump-1
8. Emergency Cooling Water Pump-1 & 2
9. MOP 2 10. BFP 1A ALOP 11. BFP 1B ALOP 12. HP B/P OSU 1A 13. UPS Aux
14. 220V FCBC Unit 1 15. 220V FC Unit 1 16. DG set Auxiliaries

VALVES CONNECTED TO DG SET


MS 101 MS 101 (VFT) HRH 101 SW 91 FD 27A AS33
Drain to HPFT
MS 107 MS 107A CRH 124 SW 92 FD 59 AS25
Drain to HPFT
MS 30 MS 38 CRH 101 SW 19 FD 49 AS21
Drain to AFT
MS 32 MS 16 CW 001 SW 49 FD 43 BW 142
MS 18 MS 71 CW 003 AS24 FD 22A BW 59
MS 50 MS 5 FD 57 AS21A FD 22 BW 54
MS 9 MS 103 FD 52 AS34 FD 4A BP 102
MS 36 MS 37 FD 50 AS30 FD 58 DM 64
,60,67
MS 57 MS 59 FD 48 HRH 102 drain SW 93 FW 4
to HPFT
MS 20 MS 85 HRH FD 19A CRH 123 drain SW 79 BW 55
vent to HPFT
MS 086 HRH MS 104 FD 19 CRH 120 drain SW 43 BW 104
vent to aft
MS 104 (VFT) MS 102 FD 25A CW 002 SW 73 BW 60
HRH 122 Drain HRH 123 Drain FD 25 CW 004 AS24A BW 141
to AFT to AFT